Field Method research, filed by subject. Each limb is a field of practice, each branch a subject, each leaf a published article. 34 articles are published so far; a branch without a leaf is planned and has nothing to read yet. Turn the tree or pick a limb to open it, then a branch to read it.
Published article
Planned subject
Related
Library / Published notes
Latest research
Every published item, newest first. Start with the question. Read the sources, check where the method applies and keep unresolved conditions visible.
34 published notes · 622 external source links, with evidence and limits attached to each note. A small starting collection. The library links to source records; it does not host third-party papers or datasets.
From a terrain or design model to a printed site model: what public elevation data, file formats and printer makers' documents support, with scale arithmetic.
Design question
How does a landscape practice get from a terrain or design model to a sound printed site model, and what do the file formats, printer documentation and public elevation data actually support?
Applies to
Planning a desktop 3D print of existing terrain or a site design for study or presentation in the United States, using public USGS elevation data or the practice's own model. Software and printer notes apply to the documentation pages as read on the check date.
Limits
Not engineering, surveying, safety or health advice. Sources were read on November 24, 2026. We printed nothing; the scale table and the check sequence are our own arithmetic and suggestion and are untested. Maker figures apply to the printer, nozzle and material each page names. No products are ranked and no prices are given. No study we found measures a printed site model on a real landscape project.
Sources & publication record (20 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
A proposed way to plan professional development from published exam task lists, board rules and accreditation standards, with California as the worked example.
Design question
How can a landscape architecture student or licensee build a structured professional development plan from what licensing boards, CLARB, LAAB and continuing-education systems publish?
Applies to
Students, licensure candidates and licensed landscape architects in the United States who plan their own development. California is the worked example, with Texas and Connecticut as contrasts for continuing education.
Limits
Not legal advice and not a statement of anyone's eligibility. The licensing board of each jurisdiction decides what counts. This article proposes a method. The plan steps and record fields are ours and have not been tested. Sources were read on November 24, 2026. CLARB's current exam blueprint, candidate handbook and Uniform Standard were not read; the exam content described here comes from CLARB's 2022 task analysis report and from a December 2023 structure sheet read in a copy hosted by the Oregon board. California's regulations (16 CCR 2615 and 2620) and the Texas and Connecticut rules were read only as each board summarizes them on its own page. We contacted no board. Two of the three research papers were read as abstracts, and none studied landscape architects. No fees are given.
Sources & publication record (20 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
A proposed way to build a landscape code checklist: sort items by type, trace each to its source and edition, and retire it when the source changes.
Design question
How is a useful compliance checklist for a landscape project built, traced to its source and kept current?
Applies to
Building and maintaining in-house compliance checklists for landscape projects in the United States, with California state and San Diego City and County examples. Agency forms described here apply to each agency's own reviews.
Limits
Not legal advice and not a code review. This article proposes a method. The item types, record fields and upkeep routine are ours and have not been tested on projects. Sources were read on November 24, 2026. We compared a few items between documents and did not audit any form. We did not contact the County of San Diego or any other agency. The adopted San Diego County Code and the official California Code of Regulations pages did not open for us and were not read. The County ordinance was read only in an unsigned clean copy that the County posts. Differences reported between County documents are differences between two documents we read, and we do not say which is correct. The controlled research is from surgery and aviation, and two of the studies were read only as abstracts. Requirements vary by jurisdiction, agency and edition, and the responsible agency decides what applies. No wildfire design guidance is given.
Sources & publication record (16 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
How a small landscape practice can pick a software category, check owner and records rules, and test exports and exit terms before adopting.
Design question
How can a small or mid-sized landscape practice decide which kind of project management software it needs, and test it before adopting, using what vendors document and what public owners require?
Applies to
Small and mid-sized landscape architecture practices in the United States, with City of San Diego, Caltrans, University of California and federal construction examples. Vendor notes apply to the pages read on November 24, 2026.
Limits
Not legal, contractual or security advice. No software was tested, no product is ranked and no prices are given. Vendor pages state only what each vendor documents, change often and were a small sample. Guide specifications and boilerplate agreements are edited for each project, and several documents were read in part. The categories, gates and pilot method are our own and untested.
Sources & publication record (18 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What a brief, work breakdown, responsibility matrix, schedule basis and kickoff agenda should contain, from public owners' templates, adapted to landscape work.
Design question
What do a project brief or charter, work breakdown, responsibility matrix, schedule basis and kickoff agenda each need to contain so a landscape team can run a project from them?
Applies to
Project start-up for landscape architecture teams in the United States, with City of San Diego, Caltrans and Washington State examples. The source templates serve parks, highways, federal buildings and state technology projects.
Limits
Not legal, contract, engineering or safety advice. Sources were read on November 24, 2026, several in part. The landscape versions of each document, the component breakdown, the matrix rules, the checks, the example tables and the kickoff timing are ours, proposed and untested. The City of San Diego Park Design Manual, NASA's 2025 handbook, the digital text of GAO's schedule guide and the Project Management Institute's standards were not read. Several templates carry no date. Contracts, owner procedures and licensing rules vary and govern.
Sources & publication record (15 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Planning a climate resilience workshop: name the decision, show each hazard with its uncertainty, and record what was decided and what was only suggested.
Design question
How can a landscape architect plan and run a climate resilience workshop that gives a named decision maker a usable record and states hazard and uncertainty honestly?
Applies to
Planning workshops on climate hazards for parks, streets, campuses and neighborhoods in the United States, with California guidance as the state example.
Limits
Not legal, engineering or safety advice. Sources were read on November 24, 2026. Most published methods were written for city or agency plans, and applying them to a single site is our interpretation. Most of the evaluation evidence is self-reported by participants, and the four workshop papers come from one group of authors. One paper was read as an abstract only. The hazard card, two-session agenda and decision record are ours and have not been tested. Massachusetts, FEMA and EPA material could not be opened and is not used.
Sources & publication record (20 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What studies, accessibility guidance and tool help pages say about remote design reviews, with our untested sheet arithmetic, routine and record.
Design question
How should a design team set up and run a remote or hybrid design review so that drawings are legible, everyone can take part, and decisions are recorded?
Applies to
Design teams in the United States planning internal, consultant and client design reviews held by video call or with some people in a room and some remote. Public meetings are covered only as pointers to the responsible agency.
Limits
Not legal, accessibility-compliance or health advice. Sources were read on November 24, 2026. The studies are small or come from teaching and office settings, and none tested a professional design review. The sheet arithmetic, the 12-pixel rule, the review routine and the record fields are our own and untested. We tested no software, read help pages for two tools only, and features change with each release. We could not open the California open-meeting statute on the official legislative site, and we did not read the federal ADA rule for this article, so neither is described here.
Sources & publication record (16 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
We mapped San Diego summer surface heat on a 10 m grid. Our tests show the fine detail marks where surfaces run hotter or cooler, not by how many degrees.
Design question
What can a summer surface temperature map of San Diego, measured by Landsat at about 100 m and drawn on a 10 m grid with Sentinel-2, support in reading a site?
Applies to
Reading the Environmental Tracker's summer heat layer, or building a similar sharpened Landsat surface temperature composite, for sites in western San Diego County.
Limits
Surface temperature at about 11:20 am on clear summer days, not air temperature, comfort or a heat wave. The 10 m detail shows a likely pattern only. The damping rule beat smoothing at 100 m; the map's own step to 10 m is untested and may still be too strong. Tested in this area only. Not design, health or safety advice.
Sources & publication record (14 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Five shared landscape case-study collections, what each says about review and reuse, and a project record a firm can keep so its work can be shared.
Design question
Which shared case-study collections exist for landscape architecture, how should a practitioner judge the evidence and reuse permissions in each, and how should a firm document its own project so it can be shared?
Applies to
Reading and reusing published landscape case studies in the United States, and keeping a project record in a design office with a later case study in mind.
Limits
Not legal advice. Copyright, licence and confidentiality questions belong to the rights holder, the contract and counsel. Five collections were read on November 24, 2026 and described only from their own pages; they are not a complete list. One or two entries were opened in four collections, and for ASLA only the listing page was read, so statements about a collection are about the pages we read. Copyright Office documents are reported as written, with no conclusion of ours about what is protected. The reading questions and the project record are Field Method's own and have not been tested in a practice. We did not contact any publisher and did not read any design services contract.
Sources & publication record (20 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
A phase breakdown from site analysis to establishment, and what public sources say about review cycles, utility notice, planting season and plant lead times.
Design question
How should a landscape architecture practice break down and schedule a project from site analysis through construction administration, which external dependencies drive the schedule, and what do public sources say about their durations?
Applies to
Schedule planning for landscape architecture projects in California, with City of San Diego and Caltrans examples. Durations are quoted as each source states them for its own jurisdiction, program and project type. The phase table and the worked example assume a publicly bid, design-bid-build project.
Limits
Not legal, engineering or safety advice and not a schedule guarantee. Sources were read on November 14, 2026. The City of San Diego review table was read on that day in its standard-review tab only; it has no landscape row and changes daily. The Government Code (sections 4216 and following, 65943, 65950) could not be opened on the state legislative site, so the Permit Streamlining Act and the excavation notice are reported from agency and notification-center pages. Of the CEQA Guidelines only section 15105 was read. The Caltrans figures are contract terms of the 2026 Standard Specifications, and only the cited sections were read. The Landscape Standards were read in part. The state Model Water Efficient Landscape Ordinance, PMI standards and environmental permit work windows were not opened. No primary source was found for nursery lead times for ordinary landscape stock or for a planting window by month in San Diego County. Critical path, float and look-ahead scheduling are not covered. The work breakdown, the review-loop rule and the worked example are ours and untested.
Sources & publication record (16 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What studies measured when designs were shown in AR on site, what Apple, Google and tool makers document about placing a model, and the limits.
Design question
What does peer-reviewed research report about on-site and tabletop augmented reality for presenting landscape and urban designs, what do platform makers document about placing a model at a real location, and what are the practical limits?
Applies to
Deciding whether and how to show a landscape or urban design in augmented reality on a phone or tablet, on site or on a table. Platform and software notes apply to the documentation pages as read on the check date.
Limits
Not engineering, surveying or safety advice. Sources were read on November 15, 2026. The studies are small, use different tasks and devices, and several have no comparison group. Most used building or tree models and none measured a built landscape project afterward. The one placement accuracy study tested one building at a single site. No products are ranked and no prices are given. Platform documentation states capabilities and conditions; we ran no tests and placed no models. Headsets and smart glasses are not covered. Makers' pages change, and the versions noted are those shown on the pages.
Sources & publication record (23 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Open research databases as each describes itself, how peer review and licences show on a record, and a filing routine that keeps DOIs, versions and dates.
Design question
How can a small landscape architecture practice find, judge and organize research, and keep each citation traceable to an identifier, a version and a date checked?
Applies to
Small practices in the United States that collect published research and agency reports to support design decisions, reports and submittals. The databases covered are free to search.
Limits
Not legal advice; copyright and licence questions belong to the rights holder or counsel. Sources were read on November 14, 2026, and re-opened in full on November 15, 2026. Each database is described only as its own pages describe it. We did not test search quality, coverage or the accuracy of any record. The DOAJ home page and eScholarship could not be read and are left out. The USGS Publications Warehouse, journals of the field and California agency libraries were not read. The full text of NISO RP-8-2026 and the DOI Handbook was not read. The filing method is Field Method's own and has not been tested in a practice.
Sources & publication record (28 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
UK ISO 19650 guidance on file states and status, National CAD Standard pages, maker help on versions and locks, and NIST and CISA pointers.
Design question
How should a small design team share files, control versions and run reviews in cloud tools, as standards bodies, software makers and federal cybersecurity agencies document it?
Applies to
Small landscape architecture and design offices in the United States choosing or tidying a shared file setup. Software notes apply to the documentation versions named.
Limits
Not legal, contractual or security advice. Sources were read on November 15, 2026. ISO 19650 and the National CAD Standard are sold documents; we read only their public pages and the UK framework's free guidance (Guidance C, Edition 3, and Guidance 2, Edition 9, both November 2022). For Autodesk we read one Civil 3D 2023 page on locking and one current overview page; its topic pages on versions and locks did not open. Reviews and markup are covered only by two Bluebeam pages, one checklist question in the UK guidance and our own scheme. We tested no software. Features and names change with each release. No products are ranked and no prices are given. The file scheme is our own and untested. Records retention is not covered.
Sources & publication record (20 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
How GSA, Caltrans, California's DSA and San Diego agencies stage their reviews, what each stage asks to be confirmed, and a phase checkpoint record of our own.
Design question
How can a landscape practice build compliance checks into each design phase so that issues surface early, what do public agencies publish about their own phase submittals and plan-check stages, and how should the checks be recorded?
Applies to
Planning in-house compliance checkpoints for landscape architecture projects in the United States, with federal (GSA Core Building Standards), California (Caltrans, Division of the State Architect) and City and County of San Diego examples.
Limits
Not legal or engineering advice. Sources were read on November 15, 2026. Each agency's procedure applies to its own projects, and requirements vary by jurisdiction, owner and contract. We describe what each document covers and where to read it; we do not restate technical requirements. GSA rescinded its P100 standard in February 2025; we describe the Core Building Standards that replaced it. The only GSA submittal matrix we found posted is labelled 2025 Interim, and we read its opening pages and a sample of later pages, not all 274. Only the cited parts of the Caltrans manual were read. The County of San Diego source is its building permit guide, form PDS 441A, revised October 26, 2026. The phase checkpoint table and the record format are ours and untested.
Sources & publication record (13 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What AACE, GSA and Caltrans say about estimate classes, accuracy and contingency by design phase, the limits of public bid prices, and how to record changes.
Design question
How do standards bodies and public owners structure a construction cost estimate by design phase, and how far can a landscape architect rely on public unit-cost data and a written change record?
Applies to
Planning and tracking construction cost on landscape and site projects in the United States, with federal, California and San Diego examples.
Limits
Not financial, legal or engineering advice and not an estimate for any project. Sources were read on November 14 and 15, 2026. AACE recommended practices were read only in AACE's free preview pages, revision of August 7, 2020; the full documents and ASTM E2516, E2168 and E1557 were not read. Agency percentages apply to those agencies' own programs and are not defaults for other work. No unit prices are given. Commercial cost data products, private-sector contract forms, state prevailing wage rules and local procurement rules were not reviewed. The change log and fee log are our own method and are untested.
Sources & publication record (22 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Which building codes and accessibility standards reach California landscape work, how to find a city's adopted edition and amendments, and how to record it.
Design question
Which building codes and accessibility standards most often reach landscape work in California, how does a practitioner find the edition a city or county has adopted with its local amendments, and how should code research be recorded?
Applies to
Starting code research for landscape projects in California, with the City of San Diego as the worked example. Other cities, counties and states publish and amend differently.
Limits
Not legal advice and not a code review. Sources were read on November 14, 2026. We read adoption pages, bulletins, guides and Municipal Code adoption sections. We did not read Title 24 itself, including CALGreen and the Fire Code. For Chapter 11B we read only the section on outdoor developed areas as reproduced in the Division of the State Architect's advisory manual. The article says where each code sits and does not restate its requirements. State rules outside Title 24 are not covered, except that the Model Water Efficient Landscape Ordinance is named through San Diego's code. The Department of Water Resources page for that ordinance, the ICC code viewer and the Legislature's website did not open for us. No wildfire design guidance is given. The building official or other enforcing agency decides what applies to a project.
Sources & publication record (23 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Which permits and agencies reach a landscape project, what agencies ask for in a submittal and resubmittal, and which records exist at completion.
Design question
Which agencies and permits reach a landscape project, how should a landscape architect prepare a permit submittal and respond to review comments, and which project records should exist when the work is done?
Applies to
Permit submittals and record keeping for landscape architecture projects in California, with City of San Diego, County of San Diego, Caltrans and State Water Board examples.
Limits
Not legal advice. Sources were read on November 14, 2026 and rules vary by jurisdiction, agency and project. The list of permits is not complete; local stormwater standards and coastal, wetland, wildlife and school or hospital reviews were not read. The state Model Water Efficient Landscape Ordinance and the Health and Safety Code sections on plan retention could not be opened, so those points rest on local and board documents. The Permit Streamlining Act is described from a state fact sheet about housing development, not from the statute. No primary source was found for how long a landscape architect should keep project records. The office record list and the comment-response table are ours and untested.
Sources & publication record (21 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What public agencies publish for design-phase reviews and risk registers, and a simple issue log and risk register method for a landscape practice.
Design question
How can a landscape architecture practice structure QA/QC reviews at each design phase and keep a risk register, based on what public agencies, standards bodies and professional organizations actually publish?
Applies to
Design-phase review planning and issue tracking for landscape projects in the United States, with California and San Diego County examples. Describes what agencies publish and a Field Method log and register built from it.
Limits
Not legal, engineering or professional-liability advice. Sources were read on November 14, 2026. Agency checklists are written for their own programs and permit types, and requirements vary by jurisdiction, agency and edition. The GSA submittal matrix cited is the 2025 edition that GSA links today, and we found no matrix dated 2026. ISO 31000, PMI standards and the USACE and Florida DOT quality manuals were not used because they could not be opened, were paywalled, or could not be confirmed as current. The current Caltrans risk handbook appears to be available to staff only and was not read. The issue log and risk register in this article are our own method and have not been tested by an outside practice.
Sources & publication record (17 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What weather-based controllers and soil moisture sensors do, what WaterSense and California's MWELO say, measured savings and limits, and data questions.
Design question
What do weather-based irrigation controllers and soil moisture sensors do, what do EPA WaterSense specifications require of labelled products, what does California's Model Water Efficient Landscape Ordinance say about controllers and sensors, what does research report about water savings and its limits, and what data, upkeep and privacy questions come with connected controllers?
Applies to
Specifying and reviewing irrigation controls for landscape projects in the United States, with California's model ordinance as the regulatory example. Local water efficient landscape ordinances, water supplier rules and rebate terms differ and were not read.
Limits
Not legal, engineering or product advice. Sources were read on November 15, 2026. The MWELO text was read from DWR's own PDF, which shows amendments in underline and strikeout; the official California Code of Regulations site was not opened. No local ordinance was read. ANSI/ASABE S627 and S633 were not read; their content is reported only as EPA describes it. Journal papers behind the University of Florida figures were not opened; the figures come from the authors' own extension publications and from EPA. Most plot and home studies cited are from Florida. One maker's documentation is used as an example because it was openly readable; it is not a product assessment. California's connected-device statute could not be opened.
Sources & publication record (17 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
How to map stakeholders, set the level of participation, separate required notice and hearings from good practice, and record decisions. San Diego example.
Design question
How can a landscape architecture team map stakeholders, run coordination with agencies, consultants and communities, and record decisions, based on what public agencies publish about public participation and coordination?
Applies to
Planning and recording stakeholder coordination on landscape projects in the United States, with California and City of San Diego examples of required notice, hearings and advisory review.
Limits
Not legal advice. Sources were read on November 14, 2026. The agency guides were written for government agencies running public decisions, and applying them to a design team is our interpretation. Notice and hearing rules are described only for the processes we read; CEQA, NEPA procedures outside the highway program, the Coastal Act, the Brown Act text, tribal consultation law and San Diego's separate process for capital improvement program projects were not read at source. California statutes are reported only as the 2017 General Plan Guidelines describe them. The Legislature's website and the IAP2 Federation page did not open for us, so the IAP2 Spectrum is described as EPA and IAP2 USA describe it. The stakeholder map, meeting record and decision log formats are ours and untested.
Sources & publication record (17 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What controlled studies found when headsets were compared with screens and images, what they report on sickness, and what tool makers document for VR.
Design question
What does peer-reviewed research show about reviewing landscape and urban designs in immersive virtual reality instead of on a screen or in images, and what do tool makers document about getting a design into a headset?
Applies to
Deciding whether and how to use a headset for design review or public participation on landscape and urban design projects. Software notes are for the documentation versions named.
Limits
Not medical or safety advice. Sources were read on November 14, 2026. Two studies were read as abstracts only because the full text is behind a subscription. The studies are small, mostly use students, and none follows a real landscape project from review to construction. Several were published in 2019 or 2020 and use headsets of that period, such as the Oculus Rift CV1. Software documentation changes with each release; headset lists and requirements are as the pages stated on that date. We tested no hardware or software. No products are ranked and no prices are given.
Sources & publication record (17 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Six published projects, what each source measured, modelled or estimated, over what period and by whom, and how much weight a practitioner can put on it.
Design question
What do published, documented case studies of climate-resilient landscape projects report about measured post-construction performance (flood, heat, stormwater, erosion), how was it measured, and how much weight can a practitioner put on it?
Applies to
Reading published landscape performance case studies and monitoring reports in the United States, with examples from Washington, Missouri, Iowa, California, Arizona and Louisiana.
Limits
Not engineering advice. Six projects were read, chosen to cover different climates and different kinds of evidence. They are not a sample, and no pooled result is claimed. Several papers cited inside the sources were not opened, including the 2011 StormCon paper behind the Elmer Avenue water quality figures, the Kansas City final report, the University of Missouri-Kansas City thesis and the 2009 Charles City design report. For the Louisiana reef study we read the USGS record and abstract only. Figures are quoted as the sources give them and were not re-measured. Sources were read on November 14, 2026.
Sources & publication record (14 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What ASLA, regulators and NIST say about AI in design work, plus copyright, confidentiality and a routine for checking AI output before it leaves the office.
Design question
Where can generative AI responsibly help a landscape architecture practice (research, drafting, option images, documentation, code), what do professional bodies and regulators say about responsibility, disclosure, confidentiality and copyright, and how should a practice verify AI output?
Applies to
United States practice, with California licensing and San Diego County context. Statements by professional bodies are guidance, not law, and requirements vary by jurisdiction, contract and tool.
Limits
Not legal advice or guidance on professional duty. Sources were read on November 14, 2026. The joint ICOR statement was not read. No California rule on AI use by landscape architects was found. Vendor terms were read for two pages only, covering different account tiers, and they change. No source measures AI accuracy on landscape tasks. The verification routine and the task table are Field Method interpretation.
Sources & publication record (19 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Which biophilic patterns apply outdoors, what experiments, reviews and population studies show about nature and well-being, and how far that supports design.
Design question
Which biophilic design patterns apply to landscapes, what does the primary research on nature exposure and well-being show (study designs, effect sizes, populations), and how strong is it for design decisions?
Applies to
Early-stage design reasoning for outdoor spaces in the United States and elsewhere, where a designer wants to know how much weight published nature-and-well-being research can bear.
Limits
Not medical, clinical or engineering advice. Sources were read on November 14, 2026, through open-access full texts and author or institutional repository copies. Several widely cited papers (Ulrich 1984, Kahn et al. 2008, Barton and Pretty 2010) were not read in full and are not used. Terrapin ratings are taken from the 2014 report PDF. None of the studies cited tested hospital patients, healthcare staff or children at school. Most come from temperate, high-income countries and many use university students. No study cited here compared one biophilic pattern against another outdoors.
Sources & publication record (14 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Public tools for screening a US site for heat, flood, drought and sea-level rise: what each measures, its scale, and how to record the reading.
Design question
Which public climate-hazard screening tools can a landscape architect use at a US site, what does each actually measure and at what resolution, and how should its output be read and recorded?
Applies to
Early screening of climate hazards at a site in the United States, with California and San Diego examples. Not a substitute for a hydrologic, coastal engineering or fire analysis.
Limits
Not engineering, legal or safety advice. Tool pages were read on November 14, 2026 and change. No tool was run on a real site, so there is no worked map reading; the worked example uses published scenario tables only, with regional values where gauge values sit in data files we did not open. The Coastal Commission guidance chapters, the Ocean Protection Council guidance, Cal-Adapt's own method pages and the EJScreen and CEJST tools could not be opened and are not relied on. Wildfire is covered only as a pointer to the state hazard zone maps.
Sources & publication record (25 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
For landscape architects: what Part 107 allows, who controls take-off and landing, where California draws the survey line, and what it takes to state drone accuracy.
Design question
What can a landscape architect lawfully fly and usefully capture with a small drone, and what may the resulting pictures and models be used to claim?
Applies to
Planning drone photography and mapping for site inventory in the United States, with California and San Diego County examples.
Limits
Not legal advice and not a flight manual. Rules were read on November 13, 2026 and change; local park policies, state privacy law, insurance and the reach of the California landscaping exemption were not settled from a primary source. No flights or accuracy tests were made.
Sources & publication record (17 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Life-cycle stages, sourced factors for concrete, asphalt, maintenance and trees, a worked patio-versus-trees example, and the limits of each number.
Design question
How can a landscape architect estimate the greenhouse gas emissions and carbon storage of a site design from published factors, and how much weight can the result bear?
Applies to
Design-stage comparison of site materials, maintenance and planting in the United States, with California factors used in the worked example.
Limits
Not engineering advice and not a certified life-cycle assessment. Sources were read on November 13, 2026. ISO and EN standards, CLF baselines, the Pathfinder methodology and ICE data were not used because they were not readable or not licensed for this use. Construction (A5), use (B) and end-of-life (C) stages are not quantified in the example. Factors for pavers, stone, decomposed granite, irrigation tubing, shrubs and meadows were not found in a primary source. Tree storage uses a Northern California Coast example; Southern California Coast growth is slower. Tree studies count CO2 only, and sources use different GWP bases.
Sources & publication record (27 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What SITES, LEED, Envision and the Living Building Challenge cover, how each scores, who administers them, and what a level does and does not show.
Design question
What do the main rating and certification systems that apply to landscapes measure, how are they scored and administered, and what do their administrators and published studies say about using a score as evidence of performance?
Applies to
Choosing and scoping a rating or certification program for a landscape or site project in the United States, with the administrators' published structure and scoring as read on the check date.
Limits
Not legal, engineering or certification advice. Administrator pages were read on November 14, 2026 and change. The English SITES v2 rating system, SITES Reference Guide, Envision Guidance Manual, LBC 4.1 program manual and LEED v4.1 documents were not read. SITES credit-level point values come from the 2014 Spanish edition; the 2024 addenda table read for this article changes requirement text but no point values. For Envision v4 we read one ISI update page on November 24, 2026; other ISI web pages were not read. No fee figures are given; each administrator's current page governs. BREEAM Infrastructure and other systems were not examined. No study read compares certification level with measured landscape outcomes.
Sources & publication record (23 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What ENVI-met, Ladybug Tools, SWMM, the National Stormwater Calculator and i-Tree compute, what they need, and how far to trust their results in design.
Design question
What do the main classes of simulation tools used on landscape projects actually model, what inputs and validation do they require, and how far can their outputs be trusted for design decisions?
Applies to
Choosing and reading microclimate, sun and shade, stormwater and tree-canopy simulation tools at the design stage of a United States landscape project.
Limits
Not engineering advice. Documentation and papers were read on November 14, 2026; no tool was run on a project. We found no field comparison of ENVI-met 6.0, and we read only the abstract of the version 5 field study. Sun position accuracy, the National Stormwater Calculator's runoff accuracy and the method of i-Tree's planting tools for one parcel were not settled.
Sources & publication record (25 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
What an EPD declares and omits, how validity and verification work, when two products can be compared, and how health and sourcing declarations differ.
Design question
How does a landscape architect read an EPD or a material health or sourcing declaration, what do program rules require and omit, and when can two products be compared fairly or shown to be non-comparable?
Applies to
Reading environmental product declarations for concrete and concrete paving in United States landscape specifications, with notes on health and wood-sourcing declarations and California Buy Clean as a public-procurement example.
Limits
Not legal, engineering or procurement advice. Sources were read on November 14, 2026. ISO 14025, ISO 21930 and EN 15804 were not readable on the standards bodies' pages, and the NSF concrete PCR was not used, so their rules are described only as the NRMCA EPD and other program documents restate them. Several PDFs were read as extracted text, and one results table was read from an image. The worked example is a 2020 paver EPD whose current status we could not check. The HPD v3.0 page we read gives no disclosure threshold, and FSC labelling rules were not read in the current FSC standard. Requirements vary by program, PCR version, agency and jurisdiction.
Sources & publication record (15 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Published evidence for shade trees, bioretention, mulch and turf replacement, where it is thin or fails, and the rules that govern them in California.
Design question
Which site-scale landscape strategies for heat, stormwater and drought have published performance evidence, what do the sources say about how well they work and where they fail, and which flood rules apply to them?
Applies to
Choosing and documenting site-scale climate-hazard strategies in the United States, with California and San Diego County regulatory examples.
Limits
Not legal, engineering or safety advice. Sources were read on November 14, 2026. Stormwater, flood and water-efficient landscape content touches regulation and needs review by a licensed professional and the local agency. No site-scale flood-damage study, permeable pavement field study, WUCOLS plant list or MWELO appendix was opened, and the full Hatt et al. paper was not read. Several results come from other climates, and no strategy was tested for this article.
Sources & publication record (26 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Where federal, California and San Diego codes and permits are published, which notice mechanisms each agency offers, and a routine for catching changes.
Design question
Where are the codes, ordinances and environmental regulations that affect landscape work published, what official notice or subscription mechanisms does each offer, and how can a practice set up a routine to catch changes?
Applies to
Keeping track of federal, California and City of San Diego rules that bear on landscape architecture practice. The publishers and mechanisms differ in other states and cities. State bills and licensing-board rules are not covered.
Limits
Not legal advice. Sources were read on November 14, 2026. Only mechanisms stated on agency pages were recorded. Subscription forms were not completed, so delivery was not tested. The California Legislature's website did not open for us, so the statute on code editions was read in the Building Standards Commission's own compilation. Which rules apply to a project depends on jurisdiction, project type and edition, and is for the responsible agency to decide.
Sources & publication record (39 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Choose NAIP for site detail, Sentinel-2 for seasonal vegetation comparisons and Landsat for landscape history, with verified local capture-date examples.
Design question
Which public multispectral imagery can support San Diego landscape analysis, and how can we verify when it was captured?
Applies to
Desktop site inventory, seasonal vegetation comparisons and landscape-scale change screening.
Limits
Representative metadata examples only. No full-county completeness audit, latest clear observation guarantee, raster analysis, field validation, plant diagnosis or survey-accuracy claim.
Sources & publication record (20 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Research on camera geometry, visibility and color calibration informs a proposed landscape LiDAR experiment, with source evidence and open questions kept visible.
Design question
How can a landscape team preserve evidence behind colorized LiDAR before using it for visual site review?
Applies to
Visual existing-condition review and planning a local validation study.
Limits
No implementation or measured performance; RGB does not establish plant health and this proposal is not a mapping compliance method.
Sources & publication record (8 links)
Author
Field Method · AI-assisted research roundup
Published
Sources checked
· recorded check date, not a currentness guarantee
External links only. A source’s reuse terms apply separately to its text, data and images.
Try a broader search or clear the filters to see the starting collection.
Index of branches
The same tree as a list. Branch numbers match the drawing. A subject marked Planned has nothing published yet: its description states the planned scope, which may change, and it gets a page of its own when its first article is published.
The tools and data sources landscape architects can use to screen a site for heat, flood, drought, wildfire and sea-level-rise hazards: reading their outputs critically, recognizing where regional data cannot resolve site conditions, and recording assumptions.
Design strategies that help landscapes absorb and recover from extreme weather, organized by hazard, with the trade-offs, maintenance needs and site conditions that decide whether each strategy fits.
Comparing landscape materials on embodied carbon, durability, sourcing and end of life, reading environmental product declarations, and recognizing where data is missing.
An introduction to rating systems and performance-evaluation methods used on landscape projects, such as the Sustainable SITES Initiative (SITES), administered by Green Business Certification Inc. (GBCI), and the Landscape Architecture Foundation's performance-evaluation guidance: what each measures, how certification differs from self-reported performance, and how to report results without implying a certification the project has not received.
What an estimate of a landscape project's carbon footprint covers (embodied carbon of materials and construction, maintenance emissions, sequestration), how published estimating methods set up the calculation, and the uncertainties behind it.
An overview of microclimate, heat, stormwater and vegetation simulation tools: what each type models, the inputs it needs and the limits of using its results in design decisions.
Where current AI tools can help with research, option generation and documentation in landscape design, with attention to verification, data privacy and professional responsibility.
Related: 14 Virtual Reality (VR) for Design Review and Presentation
11
Blockchain for Project ManagementPlanned
A critical look at proposed blockchain uses in design and construction project management, including contracts, records and tracking, and where conventional tools are simpler.
How sensors and connected systems such as irrigation controllers, soil-moisture sensors and environmental monitors fit into landscape design and maintenance, including data, system upkeep and privacy questions.
Research on drones for site documentation, photogrammetric mapping and construction monitoring: flight rules, land-manager permissions, and the limits of drone data and its accuracy. Drone mapping is not a substitute for a survey by a licensed land surveyor. Aviation rules vary by country, and whether drone mapping counts as land surveying varies by jurisdiction.
Research on landscape projects designed for climate resilience, drawn from cited published sources: goals, constraints, design approaches and, where published, post-construction performance.
How to plan and facilitate climate resilience workshops with clients, communities and project teams: agendas, exercises and ways to explain hazard and uncertainty without overstating either.
Finding, evaluating and organizing research for landscape architecture practice: databases, open-access sources and practices for keeping evidence traceable.
Quality assurance and quality control (QA/QC) reviews and risk registers for landscape projects: when to review, what to check and how to track issues to resolution.
A comparison of project management software categories for small and mid-sized design practices, with criteria for choosing and implementing a tool. Features change; check current vendor documentation.
What a project brief, work breakdown, schedule, responsibility matrix and kickoff agenda typically contain, and how to adapt each to a landscape project.
Assessing your skills and setting out a structured professional development plan in landscape architecture, including licensure and continuing education. Requirements for both vary by state and country.
Shared case-study collections in landscape architecture: which ones exist, how to judge their evidence and permissions, and how to document your own projects for sharing.
Research on the codes, standards and ordinances that often affect landscape projects in the United States, how to find the editions a jurisdiction has adopted, and how to record code research. Requirements vary by state and locality. Not a substitute for project-specific code review or confirmation with the authority having jurisdiction.
Organizing project documentation and preparing permit applications: typical permit submittal contents, tracking agency comments and keeping a clear record of decisions. Permit submittal requirements vary by agency.
Landscape design considerations for wildfire-prone areas: defensible-space zones, plant selection and maintenance, materials near structures, and when walls, decks and other structural elements need engineering input. Requirements vary by state and fire authority. The locally adopted fire code and the fire authority having jurisdiction govern, and a licensed engineer is responsible for structural elements.
Related: 01 Climate Risk Assessment Tools · 31 Building Codes for Landscape Projects
How compliance checklists for landscape projects can be organized by project phase and common landscape elements, and adapted to local requirements. Requirements vary by jurisdiction.
Where codes, ordinances and environmental regulations are published, and how to set up a practical routine for tracking changes that affect landscape practice. Not legal advice.
Using Professional Forums for Compliance QuestionsPlanned
Where practitioners discuss code issues, how to ask useful questions and how to verify answers against primary sources.
Lab / Student pathway
Plan a source-backed site study
Proposed student exercise; no measured results. Use the two notes to prepare a study, then record what still needs verification.
01
Frame one question
Choose a site and a feature: a canopy edge, planting area or surface. Write the design question, study boundary and scale.
Record: question + site + scale
02
Choose and date the evidence
Read the imagery note. List the source, bands, acquisition date and quality limits you would need for your question. Keep missing information explicit.
Record: source list + unresolved metadata
03
Separate observation from interpretation
Read the LiDAR color proposal. Identify what an image records, what you infer and what the proposed experiment would test. It has no measured results.
Record: observations + hypotheses + limits
04
Prepare the field check
Review Site Lens for a San Diego County desktop study or Site Dossier for a source-linked site record. Read each tool’s limits, then list what to observe on site, who will check it and how.
Record: verification plan + findings still pending