Tool library · plan view
Every tool on one sheet.
Seven tools for site analysis, base plans, corridors, photographs and materials, with the methods and research behind them. Drag to turn the plan, pick a point to read it, then open it.
- Tool
- Method, research, product
- Pending
Index
The same sheet as a list. Point numbers match the plan.
Smart tools Tool library
- 01Site Lens
Pick a parcel or road corridor and get its public layers in 3D, with one CAD, model and GIS package.
About Site Lens - 02Tree Inventory
Check and edit the tree records of a Site Lens study in the field, with photographs and a field checklist.
About Tree Inventory - 03Photo tools
Turn site photographs into a Google Earth photo map, CAD points, Blender cameras and a key view map.
About Photo tools - 04Landscape Camera Setup
A Blender add-on that imports Field Method photo and camera packages and sets each photograph as its camera’s background.
- 05Corridor Atlas
Select a freeway stretch and its crossing streets, then review the ground profile and a drive preview.
About Corridor Atlas - 06Corridor Studio
Drive a proposed road alignment and compare existing and proposed ground, station by station.
About Corridor Studio - 07Material Studio
Apply materials to a 3D model and get a design-stage material estimate.
About Material Studio - 08Field NotesPending
Not yet available. AI-assisted publications from Field Method.
Research, methods and products
- 09Methods
Three workflows for site evidence, photo maps and coordinated exports, with sources and open checks kept visible.
- 10Research branches
Research filed by subject on one tree: six fields of practice, 37 subjects and 25 published articles so far.
- 11Past Forward
Landscape architecture history on one timeline, a map and by designer: projects, plans, books and turning points. Patch past books and events into a present problem, find the passages yourself and write your own hypothesis.
- 12Source Index
Landscape architecture books ranked three ways: citations in scholarship, listings in accredited programs' syllabi and Open Library readers.
- 13Site Analysis Starter KitContents preview
Six editable templates for landscape architects to record site inventory and analysis: a scope brief, source register, field-check log, graphic brief, QA checklist and handoff note. Contents preview; the download is not yet available.
Climate
- 14Climate risk screening tools for site design
Public tools for screening a US site for heat, flood, drought and sea-level rise: what each measures, its scale, and how to record the reading.
- 15Site-scale strategies for heat, stormwater and drought
Published evidence for shade trees, bioretention, mulch and turf replacement, where it is thin or fails, and the rules that govern them in California.
Sustainable design
- 16Estimating the carbon footprint of a landscape project: method, worked example and limits
Life-cycle stages, sourced factors for concrete, asphalt, maintenance and trees, a worked patio-versus-trees example, and the limits of each number.
- 17Landscape sustainability rating systems compared: SITES, LEED, Envision and LBC
What SITES, LEED, Envision and the Living Building Challenge cover, how each scores, who administers them, and what a level does and does not show.
- 18Reading EPDs for landscape materials
What an EPD declares and omits, how validity and verification work, when two products can be compared, and how health and sourcing declarations differ.
Health
- 19Biophilic design patterns and the evidence
Which biophilic patterns apply outdoors, what experiments, reviews and population studies show about nature and well-being, and how far that supports design.
Technology
- 20Building trustworthy color for landscape LiDAR
Research on camera geometry, visibility and color calibration informs a proposed landscape LiDAR experiment, with source evidence and open questions kept visible.
- 21Choosing public multispectral imagery for San Diego County
Choose NAIP for site detail, Sentinel-2 for seasonal vegetation comparisons and Landsat for landscape history, with verified local capture-date examples.
- 22AI in landscape design practice: uses, limits, checks
What ASLA, regulators and NIST say about AI in design work, plus copyright, confidentiality and a routine for checking AI output before it leaves the office.
- 23Drones for site documentation: what a landscape architect can fly, capture and claim
For landscape architects: what Part 107 allows, who controls take-off and landing, where California draws the survey line, and what it takes to state drone accuracy.
- 24Microclimate and stormwater simulation tools
What ENVI-met, Ladybug Tools, SWMM, the National Stormwater Calculator and i-Tree compute, what they need, and how far to trust their results in design.
- 25Augmented reality for landscape design: the evidence
What studies measured when designs were shown in AR on site, what Apple, Google and tool makers document about placing a model, and the limits.
- 26Cloud collaboration for small design teams
UK ISO 19650 guidance on file states and status, National CAD Standard pages, maker help on versions and locks, and NIST and CISA pointers.
- 27Smart irrigation controllers and soil moisture sensors
What weather-based controllers and soil moisture sensors do, what WaterSense and California's MWELO say, measured savings and limits, and data questions.
- 28VR for landscape design review: what studies and makers say
What controlled studies found when headsets were compared with screens and images, what they report on sickness, and what tool makers document for VR.
Practice
- 29Building a practice research library
Open research databases as each describes itself, how peer review and licences show on a record, and a filing routine that keeps DOIs, versions and dates.
- 30Cost planning for landscape projects: classes and limits
What AACE, GSA and Caltrans say about estimate classes, accuracy and contingency by design phase, the limits of public bid prices, and how to record changes.
- 31QC reviews and risk registers for landscape projects
What public agencies publish for design-phase reviews and risk registers, and a simple issue log and risk register method for a landscape practice.
- 32Stakeholder coordination for landscape projects
How to map stakeholders, set the level of participation, separate required notice and hearings from good practice, and record decisions. San Diego example.
- 33What climate-resilient landscape case studies measure
Six published projects, what each source measured, modelled or estimated, over what period and by whom, and how much weight a practitioner can put on it.
- 34Planning and scheduling landscape projects
A phase breakdown from site analysis to establishment, and what public sources say about review cycles, utility notice, planting season and plant lead times.
Codes
- 35Tracking regulatory updates in landscape practice
Where federal, California and San Diego codes and permits are published, which notice mechanisms each agency offers, and a routine for catching changes.
- 36Code compliance checks by design phase
How GSA, Caltrans, California's DSA and San Diego agencies stage their reviews, what each stage asks to be confirmed, and a phase checkpoint record of our own.
- 37Finding adopted codes for California landscape projects
Which building codes and accessibility standards reach California landscape work, how to find a city's adopted edition and amendments, and how to record it.
- 38Landscape permit submittals and project records
Which permits and agencies reach a landscape project, what agencies ask for in a submittal and resubmittal, and which records exist at completion.
Formulas lettered on the plan · 10
- SlopeS = rise / run
- Rational methodQ = C i A
- Manning, US unitsV = (1.49 / n) R2/3 S1/2
- Average end areaV = L (A1 + A2) / 2
- Noon sun altitudealtitude = 90° − latitude + declination
- Tree diameterDBH = C / π
- Ramp1 : 12 = 8.33 %
- Triangular spacingN = A / (0.866 s²)
- Engineer’s scale, example1 in = 20 ft (1 : 240)
- Contour spacingrun = contour interval / S
Units and limits apply. Q = C i A gives cubic feet per second from inches per hour and acres. The noon sun formula holds where the sun passes south of the zenith. Ramp limits and runoff coefficients depend on the governing code and agency.