A landscape project often needs more than one approval. Each reviewing body has its own checklist, file rules and closing paperwork. The agency’s published checklist defines the submittal, and the documents the agency asks for at completion are the part of the record that cannot be rebuilt later. Read the checklist before drawing, and read the completion forms before construction starts.
This article sets out what the sources say, as read on November 14, 2026, using San Diego examples. It is not legal advice. Each agency decides what its own permit requires.
Which reviews reach a landscape project
Discretionary and ministerial. The City of San Diego’s submittal manual says a development permit or tentative map, where one is required, must be approved before applying for a construction permit. San Diego Land Development Manual, Section 4 It describes construction permit review as ministerial, with some exceptions for private encroachments: the permit is approved if the regulations are met and denied if they are not. San Diego Land Development Manual, Section 3 The state’s CEQA summary defines a project as a whole action, subject to a public agency’s discretionary funding or approval, that has the potential to cause a direct or reasonably foreseeable indirect physical change in the environment. It says the lead agency prepares the initial study that determines which environmental document is needed. OPR, CEQA 101 Ask the lead agency how CEQA applies.
City of San Diego. The landscape regulations say the division “applies to all proposed planting and irrigation work”, and a table sets which rules apply to each type of development proposal. San Diego Municipal Code, § 142.0402 There is no single landscape permit in the pages we read. The Landscape section reviews building, grading and public improvement plans against the Landscape Standards, the Land Development Code and the conditions of earlier discretionary approvals. Its page lists four landscape calculation worksheets (forms DS-4 to DS-7). San Diego, Landscape Plan Review Landscape drawings travel inside other applications:
- A development permit, where the Landscape Development Package consists of the landscape plan, revegetation plan, erosion control plan and brush management plan, as applicable. Section 4
- A grading permit, whose plans may include landscape and irrigation plans.
- A public right-of-way permit, with a planting plan when new trees or shrubs are required in the right-of-way. The manual says related approvals shall be submitted at the same time for a consolidated review. Section 3
- A street tree permit. The City’s application form says all street tree plantings require a permit approved by its Transportation Department, with a site plan attached. Street Tree Permit Application The form is undated, though the City’s Landscape Plan Review page linked it when we read it. Confirm the current process with the City.
County of San Diego. In the unincorporated county the trigger is irrigated area. A project that creates 500 square feet or more of irrigated landscape, or modifies 2,500 square feet or more of existing landscape, obtains an outdoor water use authorization. Landscapes under 500 square feet need no landscape review for a building permit. Ministerial projects from 500 to 2,499 square feet may use a prescriptive option. Ministerial projects of 2,500 square feet or more, and discretionary projects of 500 square feet or more, submit a Landscape Documentation Package, approved before the building permit is issued. County Water Efficient Landscape Design Manual The manual was approved on June 24, 2020. The County’s landscape ordinance page still linked this edition when we read it. The page says the County has offered an email option for landscape plan applications since May 24, 2022. County of San Diego, Landscape Ordinance
State agencies. Two examples follow.
- Caltrans requires an encroachment permit for proposed activities within, under or over State highway rights-of-way, and lists vegetation planting or trimming among its examples. Applicants use form TR-0100. The page cites a statute under which the Department approves or denies an application within 60 calendar days once it determines the submittal is complete. Caltrans, Encroachment Permits
- The State Water Board’s construction stormwater permit covers projects that disturb one or more acres of soil, or less if part of a larger common plan that does. The current order, 2022-0057-DWQ, took effect on September 1, 2023. State Water Board, Construction Stormwater Program
This list is not complete. We did not read sources on local stormwater standards, on coastal, wetland or wildlife approvals, or on state review of schools and hospitals. Any of these may apply.
Who prepares and signs
California’s Landscape Architects Practice Act, as printed in the board’s January 1, 2024 booklet, requires each licensee to “sign, date, and seal or stamp” all plans, specifications and other instruments of service prepared for others, as evidence of responsibility for them. Practice Act, § 5659
The California Architects Board’s guide for building officials explains the other side of the counter, in answers written about the Architects Practice Act. Where a building permit is required, the official verifies that the person who prepares and submits permit documents for a nonexempt project holds a current license. In answering a question about changed plans, the guide says the official is only required to verify that the appropriate stamp and signature is on the documents before a permit is issued. The guide says a landscape architect can prepare landscape architectural site grading and site drainage plans, and can design exempt structures as part of landscape services. A structure that requires engineering must be designed by an appropriately licensed or registered person. CAB, Building Official Information Guide
Local rules then say who may sign. The City’s development permit checklist requires grading and right-of-way plans to be stamped by professionals licensed to prepare them, naming civil engineers and “in some capacity” architects and landscape architects. Section 4 The County requires the Landscape Documentation Package to be prepared and certified by a licensed landscape architect, civil engineer or architect. It makes a limited allowance for a landscape contractor working for a single-family homeowner under a signed installation contract, and for owners preparing plans for their own property. County manual Where the limit of a discipline is unclear, ask the agency and the licensing board.
One contract term bears on records. The Act requires a written contract, with listed exceptions, and one required item is a statement “identifying the ownership and use of instruments of service”. Practice Act, § 5616 Our reading: this statement is the first place to look when someone later asks to reuse or copy the drawings. What it permits in a given contract is a question for counsel.
Preparing the submittal
Start from the agency’s checklist. The City of San Diego publishes a submittal matrix and a minimum requirements checklist. The matrix sets which documents an approval needs. The checklist sets the minimum detail in each. Staff review documents against the checklist, and plans missing required detail may not be deemed complete. For a landscape plan in a development permit application the checklist asks for, among other items:
- the summary calculations and a yard and vehicular use area diagram;
- the same scale as the site and grading plans, with site features labelled consistently across them;
- required street trees shown with the proposed utilities in the right-of-way;
- a legend with symbols, botanical and common names, quantities, container size percentages, and mature height and spread;
- irrigation method, a dedicated meter or sub-meter, and who will maintain the landscape;
- existing trees of two-inch caliper or greater that will remain, with drip lines.
For grading plans, the City asks for a soil management report on new development with 500 square feet or more of landscape area and on rehabilitation projects of 2,500 square feet or more, plus the total landscape area for water conservation purposes. Section 3 The County’s package has six parts: project information, soil management report, landscape design plan, irrigation design plan, grading design plan and a water efficient landscape worksheet. County manual
The state housing department’s fact sheet on the Permit Streamlining Act is written about housing development and says it is not legal advice. For development applications the Act covers, it says local jurisdictions must publish online detailed checklists of the information they require, and a list of incomplete items is limited to items on that checklist. HCD, Permit Streamlining Act fact sheet We did not confirm that the Act reaches a ministerial landscape plan check. Ask the agency or counsel.
Then meet the file rules. The City requires new plans and documents to be PDF files and publishes format rules. Key rules follow. San Diego, Requirements for Digital Plans and Documents
- Each file is at most 200 MB.
- Files are not password-protected.
- Page sizes are not mixed within a plan set, and page orientations are not mixed.
- Every sheet has a page number in the bottom right corner. It starts with a discipline letter, L for landscape, and is unique.
- Sheet numbers are in Arial or Helvetica with clear, continuous characters.
- Annotations include comments, stamps and SHX text from AutoCAD. The page says printing to PDF removes them by flattening the file.
The page says failure to meet the requirements will delay plan and document approval. It shows no revision date, so read it again before each upload. Our article on tracking regulatory updates describes a routine for watching such pages.
Responding to review comments
The City’s digital rules shape the resubmittal. A resubmittal must always include the full plan set, and partial submittals are not accepted. A deleted sheet stays in the set with a strike and a “DELETED SHEET” label, and its sheet number stays visible. Inserted sheets get new, unique numbers. San Diego, Requirements for Digital Plans and Documents
Two other points apply. First, the City’s development permit manual says an applicant who disagrees with a completeness review or plan review comments may ask for a second opinion, which it guarantees on request. Section 4 Second, on completeness review only: for applications the Permit Streamlining Act covers, the state fact sheet says later reviews of a resubmitted application shall not request information that was not requested in the initial review. HCD fact sheet The sheet says nothing about new plan-check corrections on a later cycle.
We found no City page that prescribes the form of a written response to comments. The table below is our method and untested.
| Column | What it holds |
|---|---|
| Comment | Reviewer, discipline, cycle and comment number, quoted as issued |
| Response | What was changed, or why nothing was |
| Location | Sheet number and detail where the change appears |
| Basis | The code section, standard or condition relied on |
| Status | Open, answered, or accepted by the reviewer |
Records created at completion
Some agencies ask for specific documents when the landscape work is finished.
County of San Diego. A Certificate of Completion is submitted for every project with an approved package, within 10 days after installation of the landscaping and irrigation system. The landscape architect, civil engineer or architect makes periodic site visits during construction and certifies that the installation matches the approved package. On single-family projects installed by a contractor or by the homeowner, the certificate is signed by the homeowner and the contractor, or by the homeowner alone. Photo documentation, an irrigation schedule, a maintenance schedule and an irrigation audit report go in with the certificate, and a soil management report if one was not submitted earlier. A diagram of the irrigation plan showing hydrozones is kept with the controller. County manual The manual text we read does not say who may perform the audit. Ask the County.
City of San Diego. For development subject to the water budget section of the Landscape Standards, a professional authorized by the State conducts an irrigation audit and submits a certification to the City before occupancy and use. A separate note applies only to street right-of-way and open space projects that the City will maintain. For those, the supplemental irrigation specifications in Appendix C call for a reduced copy of the approved as-built irrigation plan, color coded by station and laminated, inside each controller enclosure at final acceptance. San Diego Landscape Standards The standards were last amended in April 2016. The City’s Land Development Manual page still listed that edition when we read it. San Diego, Land Development Manual
Caltrans. The construction manual shows what a public owner’s field record looks like on a highway planting contract: a notice of materials to be used, certificates of compliance, plant inspection certificates, daily reports, weekly statements of working days, backflow preventer test results filed in the project records, and an irrigation as-built plan and wiring diagram in the controller enclosure. Caltrans Construction Manual, Section 4-20 These are Caltrans procedures for its own contracts.
Our interpretation: the visit dates, photographs and test reports that support a completion certificate cannot be recreated afterwards. Decide who collects each one before construction starts.
What the agency keeps, and getting it back
The Architects Board’s guide says building departments must keep record copies of permitted drawings “under certain circumstances”, for certain categories of buildings, and that officials are not required to give copies to anyone who asks. It refers readers to Health and Safety Code sections 19850 and 19851. CAB, Building Official Information Guide We could not open those sections.
The City of San Diego’s records bulletin, dated April 2026, cites sections 19850 to 19853. It says building plans can only be viewed on site, in person and by appointment, and that copies need written permission from the current property owner and the design professional who signed the plans. San Diego Information Bulletin 110 The City’s request page says the duplication process typically takes up to six weeks. San Diego, Architectural Building Plans Request
Neither source says whether stand-alone landscape, grading or right-of-way plans are kept and released on the same terms as building plans. Our reading is that a designer or owner should not count on the agency’s file as the project archive.
Keeping the office record
We found no primary source that sets how long a landscape architect must keep project records. The record-keeping passages our search found in the Practice Act booklet concern the board’s own records. Our understanding is that the period usually comes from the contract, the professional liability insurer and counsel. We have no primary source for that.
Two AIA construction administration forms show the pattern of a log. AIA describes its G810 transmittal letter as a written record of the exchange of project information, and its G712 as a log of shop drawings and samples that can serve as a permanent record of the chronology of the submittal process. AIA, G810 summary · AIA, G712 summary We read only AIA’s summaries of the forms.
The list below is our method and untested.
- Submittal log. One line for each exchange with an agency: date, permit number, cycle, contents and file name.
- As-submitted sets. The exact stamped PDF uploaded at each cycle, with the checklist version used.
- Comments and responses. Each comment letter as issued, and the response table sent back.
- Approvals. The approved set, the permit, conditions and later change approvals.
- Field record. Site visit notes with dates, photographs, test and audit reports, and substitutions accepted.
- Completion record. Certificates, schedules, as-built irrigation plans and the date each was delivered.
Record on each item whether it is the agency’s document or the office’s own.
What we could not settle
- What does the state Model Water Efficient Landscape Ordinance itself require in a documentation package and a certificate of completion?
- What do Health and Safety Code sections 19850 to 19853 require agencies to keep, and do they reach landscape, grading and right-of-way plans?
- How long should a landscape architect keep project records, from a primary source?
- Have Practice Act sections 5616 and 5659 changed since the January 1, 2024 booklet?
- Who may perform the irrigation audit under the City and County rules, and may the designer?
- How does each agency want a stamp and signature applied to a digital set that must be free of annotations?
- How does the City take in an application?
- Does the City of San Diego publish a required format for responses to plan-check comments?
- Which local stormwater, coastal, wetland and wildlife approvals most often reach landscape projects in San Diego County, and what do their submittals require?
Using this in Field Method
Site Dossier assembles a source-linked public-data record for a San Diego County site. It does not prepare submittals or track reviews.
Sources
- City of San Diego — Land Development Manual, Volume I, Chapter 1, Section 4: Development Permits/Approvals (October 2024)
- City of San Diego — Land Development Manual, Volume I, Chapter 1, Section 3: Construction Permits, Grading and Public Right-of-Way (August 2024)
- Governor's Office of Planning and Research — CEQA 101
- City of San Diego — Municipal Code Chapter 14, Article 2, Division 4: Landscape Regulations
- City of San Diego Development Services — Landscape Plan Review
- City of San Diego — Street Tree Permit Application (form, undated)
- County of San Diego — Water Efficient Landscape Design Manual (June 2020)
- County of San Diego Planning & Development Services — Landscape Ordinance
- Caltrans — Encroachment Permits
- California State Water Resources Control Board — Construction Stormwater Program
- California Architects Board, Landscape Architects Technical Committee — Landscape Architects Practice Act (January 1, 2024)
- California Architects Board — Building Official Information Guide (2021)
- California Department of Housing and Community Development — Housing Law Fact Sheet: Portions of the Permit Streamlining Act (April 2026)
- City of San Diego Development Services — Requirements for Digital Plans and Documents
- City of San Diego — Land Development Manual: Landscape Standards (revised April 2016)
- City of San Diego — Land Development Manual
- Caltrans — Construction Manual, Section 4-20: Landscape (October 2023)
- City of San Diego — Information Bulletin 110: Permit Records and Mapping Information (April 2026)
- City of San Diego Development Services — Architectural Building Plans Request
- AIA Contract Documents — Summary: G810–2001, Transmittal Letter
- AIA Contract Documents — Summary: G712–1972, Shop Drawing and Sample Record
Try a relevant tool
These tools support site review and design studies. Read each tool’s stated capabilities and limits before use.
Explore Site Dossier