ResearchProfessional PracticeChoosing Project Management Software

Choosing project management software for a small practice

How a small landscape practice can pick a software category, check owner and records rules, and test exports and exit terms before adopting.

Field Method · AI-assisted research roundupPublished Sources checked

Choosing project management software starts with the records a practice must keep. Some public documents we read name the system for the construction record, and some set how long a designer keeps its own records. Two of the five vendor export pages we read describe content that is left out, or left out by default. Our suggestion is to choose the category first, then test the export before comparing features.

We read each source on November 24, 2026. The categories, gates and pilot method are our own proposal. We have not tested the method or any software. Nothing here is a ranking or legal or security advice.

Other Field Method articles cover the work itself: planning and scheduling, cloud collaboration and file versions, quality control reviews and issue logs, and stakeholder coordination and decision records.

Five categories by function

The grouping is ours, and many products span several groups.

Category Question it answers Record it creates What to check it also covers (our view)
Task and schedule Who does what, by when Tasks, dates, owners, dependencies Fee and hours
Time and fee tracking Are the hours within the fee Time entries by phase, budgets, billing The content of a review or response
Construction administration What was asked, sent and answered in construction RFIs, submittals, transmittals, field reports The design phases
Issue tracking What is wrong and is it closed Comments, locations, status, verification Formal contract communication
Correspondence and decisions What was said, decided and issued Email, minutes, owner decisions, drawing issue logs Search, filing by project, export

A request for information (RFI) is a contractor’s written question. A submittal is product information, a shop drawing or a sample sent for review.

Task and schedule. Microsoft’s help says a Planner plan can be exported to Excel with task titles, buckets, status, start and due dates, assignments, priority and labels, among other fields. Microsoft Planner help The page does not mention dependencies between tasks. Test for them.

Time and fee tracking. Deltek’s Vantagepoint 2025.2 help describes checking timesheets against a budget or a plan at the lowest level of the work breakdown structure. A warning still lets an employee save the entry. An error blocks it until corrected. Deltek Vantagepoint 2025.2 help The page is for one release, so check the current one. Our inference: the check is only as useful as the budget or planned hours entered at that level first.

Construction administration. Procore’s help describes a project archive that is downloaded as a ZIP file and organized by tool. Procore help Autodesk’s help describes an as-built export for sheets, RFIs, submittals, files and other items. Autodesk as-built export help

Issue tracking. The version 3.0 documentation for buildingSMART’s BIM Collaboration Format (BCF) says it exchanges topics such as issues between different BIM software. BCF 3.0 documentation In our judgement a spreadsheet log may do the same work on a small planting and grading package.

Correspondence and decisions. Many lost records are email, minutes or issue dates, in our view. Fix the filing method before buying, using the cloud collaboration and stakeholder articles above.

Start with what the owner decides

On some public work the construction contract names the owner’s system. Much private and residential work may name none, so check each contract.

City of San Diego. The City’s contractor guide is used with Section 5-13 of the supplementary special provisions to the 2024 Whitebook. It says contractors submit RFIs, submittals and transmittals through Oracle Unifier. Where the special provisions specify it, the terms of use say failure to use Unifier as required will delay the City’s response and result in unrecoverable lost time. A separate acknowledgement form covers access to sensitive City information by contractors, vendors and consultants. That access ends with the authorizing contract or sooner. City of San Diego Unifier guide The guide does not say how a landscape architect under a design contract takes part in reviews, so ask the City’s project manager.

Federal construction through the Army Corps of Engineers. A guide specification for the Resident Management System makes its use mandatory for the contractor. Its August 2026 change says the Corps will move to a new Construction Management Platform in phases during fiscal year 2027. The contractor must be ready to change systems when directed, with no added time or cost considered. UFGS RMS CM The platform’s own section requires a log-in at least every 35 days. UFGS CMP Guide specifications are edited for each project, and the project’s specification governs.

Caltrans construction. A December 2025 directive requires Caltrans construction staff to use ProDMS on projects awarded on or after January 1, 2026. Caltrans CPD 25-6 The Construction Manual section, published November 2024, stores records of projects awarded on or after July 1, 2021 in a different system, FalconDMS. Caltrans Construction Manual 5-1

Our reading for a small practice: on this kind of public work, a purchased construction administration product may duplicate the owner’s. The practice still needs its own register of what it received, when it answered and where the official copy sits.

Records outlive subscriptions

Design agreements. Caltrans publishes recommended agreement language for architect and engineer contracts under its local assistance program. The August 2026 text has the consultant keep project records, including accounting records, and make them available for three years from final payment. A second article says materials prepared under the agreement become the local agency’s property, and that on termination the consultant delivers them, whether completed or not, except its privileged and personnel information. Other parts of that article address copyright and reuse. The exhibit is mostly recommended language. Its note requires Title VI appendices in federal-aid contracts and the fiscal and federal provisions in federally funded contracts, and says it is also for state-only funded contracts. Caltrans Exhibit 10-R Read the executed agreement with counsel.

University of California. The Facilities Manual says the University keeps official project files at least 10 years in case a defect is discovered, with longer periods for some records. Design professional project records are kept at least five years after the project is completed, preferably longer. The page is guidance addressed to University staff. Funding terms may set longer periods. Electronic files in the facility’s project file should be in a format acceptable to the University’s Representative. UC Facilities Manual

Claims. For its own records, Caltrans says to retain those of projects with a pending claim, litigation or other legal question for 3 years after settlement. Caltrans Construction Manual 5-1 That rule governs Caltrans, so check a consultant’s duty elsewhere.

Our interpretation: list the retention period in every current and completed contract, when each starts, and any claim or litigation hold. Contract minimums may be shorter than other record needs. Ask counsel and the professional liability insurer before deleting anything. A record is safe only while it can be opened without the subscription that made it.

What the export pages say

These are five different functions, one per product, so they cannot be compared with each other. Other routes, such as list exports, reports or an API (a programming interface), may return more.

  • Monograph. Timesheets export to CSV (comma-separated values) for a chosen date range. The page lists the feature for named plans and not for the free one. Monograph help
  • Smartsheet. A backup holds Excel files of sheet data, comments on a separate tab, and attachments uploaded from a computer or mobile device. It leaves out attachments kept in outside cloud storage, reports, dashboards, formulas, workflows and cross-sheet references. The page lists backups for Business and Enterprise plans. Recurring workspace backups need an Owner or Admin. The page says restoring a solution requires rebuilding each item. Smartsheet backup help
  • Procore. Most items download as PDFs. Documents and photos keep their original type. An archive can be downloaded for 30 days. Users can download only their own archives, unless they have Admin permission on the project directory. Procore help
  • Autodesk. The as-built export is set up by project administrators, on projects with Forma Build. It preselects closed RFIs, submittals and issues, so open ones must be added in the settings. The download option expires after six months. The page lists Issues and Forms among supported items. A note beside the optional references and attachments setting says an as-built export does not support Forms or Issues. The note may apply only to that setting; the page does not say. Autodesk as-built export help
  • Asana. The developer page lists three exports. It says an organization export covers the complete data of an organization in JSON, a structured text format, and points to another page we did not read. A resource export covers items such as tasks in bulk. The graph export is available to Enterprise and Enterprise+ organizations, and its download link expires in one hour. Asana developer documentation

Our interpretation, for these routes only: a PDF archive can preserve evidence and lose sortable fields. A spreadsheet export can preserve fields and lose formulas, links and automation. Permission, plan and time limits decide who can make the copy, so check that more than one person in the firm can.

Open formats, with their limits

CSV varies between programs. RFC 4180 is informational and says there is no formal specification, “which allows for a wide variety of interpretations.” RFC 4180 Open the file in a second program to check dates, line breaks inside notes, and leading zeros in project numbers.

Among these sources we found no open standard for time entries, submittal logs or RFI logs. In our view a documented CSV plus the attachments is a reasonable minimum.

Contract and security questions

Ownership and exit. Smartsheet’s agreement, updated April 3, 2026, is one example of where the answers sit. It says the customer keeps its rights in its content and may download a backup during the term. On written request at the end of the term, it allows read-only access for 30 days to download a copy. Content is to be deleted within 180 days after the term, with exceptions. It also says content in a free or trial service may be permanently lost, and that the vendor may revise the agreement by publishing a new version. Continued use is acceptance unless the customer objects in writing within five days. The new version then applies from the renewal term. Smartsheet User Agreement Ask who owns the content, how long after the end it can be downloaded, and when it is deleted. Have counsel read the terms.

Security documents. An August 2024 guide from CISA (the federal cybersecurity agency) and the FBI says many compliance standards used in procurement address the security of the vendor’s own company. Its questions for vendors include whether standards-based single sign-on is available at no additional cost, whether multi-factor authentication or another phishing-resistant form such as passkeys is on by default at no cost when the vendor manages authentication, and whether default passwords are gone or being reduced. It says cloud vendors should keep security logs available to customers for at least six months at no additional charge. CISA and FBI, Secure by Demand Access and backup practice are covered in the cloud collaboration article.

A selection and pilot method

This method is a proposed experiment and untested. It can end in buying nothing.

  1. Start by listing records. For three recent projects, list each record that was missing or late, and each phase where hours could not be matched to fee. Note the consequence and the category, or “none of these”.
  2. Mark the owner’s systems. For each contract, note any required system, the official record, access limits and retention period. Remove any need that the owner’s system already meets. If the practice is only an invited user, test what that role can download, and save the practice’s own responses as they are issued. Then start with the category whose remaining failures cost most, or change nothing.
  3. Set the gates. Our gates: a full export the practice can make itself; a format that opens without the product; written exit terms; multi-factor authentication available to every user; and removal of a user without losing that user’s records.
  4. Read before the demonstration. Find the export, permission and termination pages. Where a page is unclear, as one above is, ask the vendor in writing.
  5. Run the exit test on invented records. Enter a known set, export it and reconcile. Load no project records until the gates pass and the client’s confidentiality terms are checked.
  6. Pilot one real project. Keep the old method running beside a live project, or load a copy of a closed project’s records. Name who enters and maintains the data.
  7. Decide on a date set in advance. Use hours spent on training and entry, the share of staff who used it, the link to accounting, seats for consultants, total cost over the term, and whether the original problem was reduced. Record the reasons and the date of the next export test.

The exit test can be small. Use only the rows for the category being bought. The numbers are illustrative:

Entered Count Check in the export
Tasks, 4 with dependencies 20 All 20 present; 4 links kept
Time entries on two phases 30 Total hours equal; phase kept
RFIs, 2 still open 6 Open and closed present; question, response and dates kept
Submittals with attachments 8 8 logs and 8 files open
Issues, 3 with photos 12 Status, author and dates kept

Reconcile each row separately. Any lost RFI response is a failure, whatever share of the other records returns. Correspondence needs its own row: messages, attachments, senders and dates.

Have someone who did not set up the tool make the export. Then open the copy on a computer where no one is signed in.

When a spreadsheet is enough

A shared spreadsheet can hold a submittal register, issue log or decision log. Our suggestion, from judgement only, is moving to a product when people overwrite each other’s entries, when a contract requires an audit trail that the spreadsheet cannot show, or when hours cannot be matched to phases.

What we could not settle

  • How landscape architects under design contracts use the City of San Diego’s Unifier system, and whether they keep access after closeout.
  • Whether Caltrans’ ProDMS replaces FalconDMS for project records.
  • What a private client’s standard agreement requires of electronic records.
  • How long a California landscape architect must keep project records outside a contract. Ask the licensing board, counsel and the professional liability insurer.
  • How export pages compare with actual exports.

Sources

  1. Microsoft Support — Export a plan to Excel (Planner)
  2. Deltek — Vantagepoint 2025.2 Help: Budget Validation for Timesheets
  3. Procore — Download a Project Archive
  4. Autodesk — As-built export
  5. buildingSMART — BIM Collaboration Format v3.0 Technical Documentation
  6. City of San Diego — Contractors Oracle Unifier User Guide: Training Videos and Forms
  7. UFGS 01 45 00.15 10 — Resident Management System Contractor Mode (RMS CM)
  8. UFGS 01 45 00.25 10 — Construction Management Platform (CMP)
  9. Caltrans — Construction Procedure Directive CPD 25-6, Implementation of Project Data Management System (ProDMS)
  10. Caltrans — Construction Manual, Section 5-1: Project Records and Reports
  11. Caltrans — Local Assistance Procedures Manual, Exhibit 10-R: A&E Boilerplate Agreement Language (August 2026)
  12. University of California — Facilities Manual, Volume 3, Chapter 6: Project Records
  13. Monograph — Exporting Organization Timesheets
  14. Smartsheet — What’s in a backup file?
  15. Asana — Developer documentation: Exports
  16. RFC 4180 — Common Format and MIME Type for Comma-Separated Values (CSV) Files
  17. Smartsheet — User Agreement
  18. CISA and FBI — Secure by Demand Guide: How Software Customers Can Drive a Secure Technology Ecosystem

These tools support site review and design studies. Read each tool’s stated capabilities and limits before use.

Explore Site Lens