A published case study makes claims about how a project performed, and its text, photographs and drawings belong to someone. A practitioner who borrows from a shared collection has to judge both: how the collection reviews what it publishes, and what its terms allow.
We describe each collection from its own pages, as read on November 24, 2026, then report what US Copyright Office documents say about photographs, drawings and landscape design, and propose a project record for a firm that wants to share its work later. The reading questions and the record are ours and are untested. Nothing here is legal advice.
What the profession’s own method asks for
The reference point is Mark Francis’s case study method, published in Landscape Journal in 2001 from work the Landscape Architecture Foundation commissioned in 1997. Landscape Journal record · Francis, UC Davis copy Francis defines a case study as a well-documented, systematic examination of a project’s process, decision-making and outcomes, done to inform later practice, policy, theory or education. Three points matter here. Francis, UC Davis copy
- Depth comes in three levels. An abstract or fact sheet of two to three pages, a full case study, and an in-depth study with archival research, interviews and study over time. Francis says the greatest need is for the second and third levels.
- A full case study covers more than design. His list includes baseline information, participants’ roles, initial budget and final cost, process, goals, use, maintenance and management, limitations, criticism and peer reviews.
- The limits are stated. Designers, owners and managers may be unwilling to be frank about problems. Some projects are best evaluated after a decade or more. There is often no peer review unless the study goes to a refereed journal. Objectivity is helped when people outside the project team prepare the study.
Our interpretation: the entries we read outside the Landscape Performance Series sit at Francis’s first level, and the brief we read sits between the first and second. Such entries are good for finding precedents and weak as proof, unless a methods document or monitoring report stands behind the figures.
Five collections, as their own pages describe them
Landscape Performance Series, Case Study Briefs (Landscape Architecture Foundation). The listing page describes over 200 built projects with quantified environmental, economic and social benefits. LAF, Case Study Briefs Most are produced by faculty, student and practitioner teams through the Foundation’s Case Study Investigation programme. LAF, Contribute The programme’s 2027 instructions for firms, dated August 19, 2026, describe the process: a faculty research fellow and a student assistant work with a firm liaison from February to August, and final case studies go through peer review before publication. LAF, 2027 firm instructions The principal’s approval form adds that each case study gets feedback from at least one independent reviewer, that the Foundation keeps final approval and editorial rights, and that taking part does not guarantee publication. LAF, principal form The brief we opened lists benefits, the project team, references, its authors, a citation with a DOI and a downloadable methods document. LAF, Elmer Avenue brief
SITES project directory (Green Business Certification Inc.). The directory says that, as of fall 2026, more than 430 projects are taking part in the programme. It is a register: certified, precertified and registered projects are listed separately, and neither page we read uses the term case study. SITES, directory The certified project page we opened gives location, size (5.78 acres), project type, certification level, the project team and a narrative overview. It states that native plantings rose to 90% of the vegetated area and that irrigation demand fell by more than half. We found no method, scorecard or certification date on that page. SITES, Blanton Museum of Art Grounds
Designing Our Future: Sustainable Landscapes (ASLA). The page describes more than 25 case studies of sustainable landscapes at all scales. Each listing entry has a photograph, with a firm, owner or photographer named in its alt text, and a short account of the project. Some state figures, with no method on the listing page. We did not open the individual case studies. ASLA, Sustainable Landscapes
EPA green infrastructure pages. EPA’s record of past technical assistance says the agency helped 36 communities starting in 2012 and links the resulting reports. By their summaries these are plans, concept designs, code reviews and cost analyses, which we read as planning documents. EPA, past technical assistance EPA’s Louisville city page reports that about 17% of an initial plan budget went to green infrastructure and that gray infrastructure costs fell by over $40 million. It links the utility’s plan and does not set out how either figure was derived. EPA, Louisville
Naturally Resilient Communities. This partnership site publishes case studies of nature-based responses to flooding. The one we opened, Lick Run in Cincinnati, has sections from challenge to benefits and ends with a source list. It names no author and no date. Several figures are targets for a project not yet complete when the page was written, and the page gives the cost as $193 million in 2006 dollars in one place and approximately $195 million, with no dollar year, in another. Naturally Resilient Communities, Lick Run
Judging the evidence: five questions (ours)
These questions are our own.
- Who wrote it, and who reviewed it? Among the pages we read, only the Foundation’s programme documents describe a review of the case study text. SITES certification reviews a project’s submittals against the rating system, a different thing (question 5). A designer’s or advocate’s own account can be accurate. The other pages we read name no outside reviewer.
- Is there a method behind each number? The brief we read links a methods document. The SITES and Naturally Resilient Communities entries we read, and the ASLA listing, state figures without one. A figure with no method is a lead to follow to the owner or agency. Our article on what climate-resilient case studies measure gives examples.
- When was it written, relative to the project? The Foundation requires a project to be built and in use for at least one year before study, and does not recommend projects completed more than 10 years ago, because design intent is lost and sites are modified. LAF, 2027 firm instructions An undated page, or one that describes a project as under construction, reports intentions.
- How was the project chosen? The Foundation’s programme selects exemplary, high-performing projects. The other pages we read do not state how projects were chosen, and a project enters the SITES directory by registering. None is a sample, so none shows how often such projects fall short.
- What does a certification or listing record? Our reading, from our comparison of rating systems: a SITES certification records that a project met the rating system’s requirements at review. That differs from measured performance.
Reuse: what each collection’s own terms say
Our article on building a practice research library covers open licences and the gap between free to read and free to reuse. None of the five collections showed a Creative Commons licence on the pages we read.
- Landscape Performance Series. We found no terms of use or licence statement on the brief or the listing page. The Contribute page says teaching materials shared by faculty remain the copyright of the universities and faculty. It invites independent submissions by contact with the Foundation and warns that a project cut sheet is unlikely to be enough. LAF, Contribute
- SITES. The site footer links to GBCI’s legal terms page, which carries the USGBC and GBCI Terms of Use, effective September 18, 2023. Those terms say site content, including photographs, is owned by or licensed to the two organizations, and that copying or republishing it needs their prior written consent unless you own the content. The list of named sites in the terms includes the SITES Online platform and not sustainablesites.org, though the terms extend to additional sites. USGBC and GBCI, Terms of Use The project page we opened credits the photographer, with an all-rights-reserved notice in the name of The University of Texas at Austin, the project’s client. SITES, Blanton Museum of Art Grounds
- ASLA. The Terms of Use limit use of the website and its content to noncommercial personal use. Reproduction needs express written consent from ASLA, or from the content’s owner where that is someone else. ASLA, Terms of Use
- EPA. The agency’s disclaimer page says its documents “may be freely distributed and used for non-commercial, scientific and educational purposes”, that commercial use may be protected by copyright law, and that individual documents may carry different conditions. EPA Disclaimers The Louisville page, for one, credits a map image to an outside author under a Creative Commons licence. EPA, Louisville
- Naturally Resilient Communities. We found no terms of use or copyright statement on the case study page. Three of its images carry individual credits. Naturally Resilient Communities, Lick Run
Our interpretation, for office practice and not as a legal conclusion: citing and linking to a case study uses none of its photographs or drawings. Putting a collection’s image or plan into a proposal or website is a different act. The terms above point to the publisher or the credited owner for consent. Where a page is silent, we do not read the silence as permission.
What Copyright Office documents say
We report what the Office’s circulars and its practice manual say. We draw no conclusion about what is protected. What they mean for a particular photograph, drawing, built landscape or contract is a question for counsel.
- Circular 1 says copyright protection exists automatically from the moment an original work is fixed, that registration is not mandatory, and that a copyright notice has not been required since March 1, 1989. It says copyright does not protect ideas, procedures, methods, systems, processes, concepts, principles or discoveries, and that maps and technical drawings can be registered as pictorial, graphic and sculptural works. Circular 1
- Circular 42 says the author and first owner of a photograph “is generally the person who ‘shoots’ or ‘takes’ the photo”, with works made for hire as a limited exception. Circular 42
- Circular 1 gives two situations in which a work may be made for hire: an employee creates it as part of regular duties, or it is commissioned for a use the circular lists under an express written agreement. Circular 1
- Circular 1 says owning a copy of a work does not give ownership of the copyright, that a transfer of exclusive rights generally must be in writing and signed, and that a nonexclusive transfer does not require a written agreement. Circular 1 Our record below logs permissions in writing anyway.
- The Compendium of U.S. Copyright Office Practices, Third Edition (release of January 28, 2021), is the Office’s practice manual. Section 926.2 says the Office may register an architectural work if it is a habitable structure, and will refuse to register bridges, dams and walkways. In one example an applicant claims a condominium complex, its parking structure and its “intricate landscape design” as architectural works. The specialist asks the applicant to remove the reference to the parking structure and the landscape design. Compendium, chapter 900, section 926.2
- Section 313.5 lists “Interior design and landscape design” among material that “may be or may contain uncopyrightable material”, citing section 926.2. The same chapter says the Office may register a photograph of a garden. Compendium, chapter 300
For a design office this becomes a records question: who made each photograph and drawing, under what arrangement, and what written permission exists.
Documenting your own project so it can be shared (ours, untested)
The Foundation’s instructions say research teams produce fuller benefits when goals and design intent were clearly stated, baseline information was collected, and performance was modelled or tracked. The firm supplies goals, design intent, challenges, lessons learned, photographs and drawings, and spends an average of 20 to 35 staff hours, depending on what was already documented. The instructions set an application fee; see them for the current amount. LAF, 2027 firm instructions The principal’s form says firms receive no financial compensation. LAF, principal form The pages we read for the other four collections describe no submission route.
From that and from Francis’s list, we propose a project record kept from the start of design. It is ours and untested.
- Goals and intent, dated. The measurable goals as written at the time, and who set them.
- Baseline. Site conditions before construction, with source and date, and at least one dated “before” photograph from a recorded position.
- Design-phase predictions. Each model or calculation, with tool and version, inputs, and who ran it.
- As-built changes. What was built differently from the drawings, and when.
- Costs. Initial budget and final cost, with reasons for the difference, if the client agrees to share them.
- Operations. Who maintains the site, what is tracked (water use, attendance, plant replacement), who owns those records, and whom to ask.
- Problems and lessons. Written while they are remembered.
- Rights register. For each photograph and drawing: maker, employee or outside party, covering agreement, permitted uses and required credit line.
- Permissions. What the client contract says about publication and confidentiality, and any dated written client consent.
Confidentiality is a contract matter
Whether a firm may publish a client’s project, its costs or its operating records depends on the agreement between them. The Foundation’s process expects research teams to have access to clients and stakeholders and asks for an access letter where a site is restricted. LAF, 2027 firm instructions That question comes before a project is offered for a case study, and it is one for the firm’s counsel.
Using this in Field Method
A “before” photograph is more useful with a date and a position. Photo tools turns site photographs into a Google Earth photo map whose pop-ups show each photo’s caption, date, coordinates and where the location came from, and into point files for CAD. That covers part of item 2 of the record. Positions are the phone’s, not survey positions. The tool does not record who owns a photograph or what permission covers it.
What we could not settle
- Whether the Landscape Performance Series has terms of use or a reuse policy we did not find. We did not ask the Foundation.
- Whether the USGBC and GBCI terms govern the SITES project pages.
- How the reviewers of Foundation case studies are chosen, and how often a submitted case study is not published.
- What the Compendium passages mean for a constructed landscape design, its drawings or its photographs. That is for counsel.
- What the individual ASLA case studies show.
- Whether the project record is workable in a small office.
Sources
- Francis (2001) — A Case Study Method for Landscape Architecture, Landscape Journal 20(1), 15–29 (publisher record)
- Francis — A Case Study Method for Landscape Architecture (pre-publication proof hosted by University of California, Davis)
- Landscape Architecture Foundation — Case Study Briefs (Landscape Performance Series)
- Landscape Architecture Foundation — Contribute (Landscape Performance Series)
- Landscape Architecture Foundation — Case Study Investigation 2027, Application Instructions: Project Proposal for Firms (August 19, 2026)
- Landscape Architecture Foundation — Case Study Investigation 2027, Supervising Principal Approval form
- Landscape Architecture Foundation — Elmer Avenue Neighborhood Retrofit (case study brief)
- Sustainable SITES Initiative — Project directory
- Sustainable SITES Initiative — Blanton Museum of Art Grounds (project page)
- ASLA — Designing Our Future: Sustainable Landscapes
- US EPA — Resources and Lessons Learned from Past Green Infrastructure Technical Assistance (last updated February 10, 2026)
- US EPA — Leading with Green Infrastructure in Louisville (last updated September 25, 2026)
- Naturally Resilient Communities — Lick Run Watershed, Cincinnati, Ohio (case study)
- USGBC and GBCI — Website Terms of Use (effective September 18, 2023)
- ASLA — Terms of Use
- US EPA — EPA Disclaimers (last updated September 21, 2026)
- US Copyright Office — Circular 1, Copyright Basics (revised 09/2021)
- US Copyright Office — Circular 42, Copyright Registration of Photographs (revised 03/2021)
- US Copyright Office — Compendium of U.S. Copyright Office Practices, Third Edition, Chapter 900: Visual Art Works (release of 01/28/2021)
- US Copyright Office — Compendium of U.S. Copyright Office Practices, Third Edition, Chapter 300: Copyrightable Authorship (release of 01/28/2021)
Try a relevant tool
These tools support site review and design studies. Read each tool’s stated capabilities and limits before use.
Explore Photo tools