ResearchCodes and ComplianceChecklists for Code Compliance

Building and tracing a code compliance checklist

A proposed way to build a landscape code checklist: sort items by type, trace each to its source and edition, and retire it when the source changes.

Field Method · AI-assisted research roundupPublished Sources checked

A code checklist is a secondary document. Someone read a rule, shortened it and put a box beside it. The short version can differ from the rule from the start, or drift when the rule moves. We propose that every item carry its type, its source, the edition read and the date it was last compared with that source. An item missing its source, edition or comparison date is a reminder until it is traced. The method is ours. It has not been tested on projects.

This article covers the checklist itself. Code compliance checks by design phase covers when to check. Finding adopted codes covers which edition applies. Landscape permit submittals and project records covers the package, and quality control reviews covers drawing review. Nothing here is legal advice. The reviewing agency decides what applies to a project.

Start with the list someone else must accept

Where an agency publishes a checklist for its own review, start there. Agency lists do different jobs, usually stated on the form.

  • Completeness. The City of San Diego evaluates submitted projects to ensure that the information required for review is provided. San Diego Land Development Manual, Section 4
  • Declaration. San Diego County’s landscape checklist, read here in its email-submittal version, is initialed item by item. The landscape professional or owner signs an acknowledgment that the initialed items are provided on the plans. The County may verify compliance. County of San Diego PDS-404e
  • Authorization. In the Caltrans local assistance checklist, leaving certain boxes unchecked results in denial of the request for authorization. Caltrans LAPM Exhibit 12-E

A reviewed list is also limited in what it proves. The Caltrans acceptance statement says the reviewer has not conducted a comprehensive review of the package. Caltrans LAPM Exhibit 12-D Quality control reviews covers both exhibits. Our rule for in-house lists: state on the list what a completed box does and does not mean.

Sort items by type before adding more

A single agency form can hold several kinds of statement. The County form asks for a rolled set of the irrigation design plan, for an estimated total water use that does not exceed the maximum applied water allowance, and for a compliance statement in set wording on the title sheet. County of San Diego PDS-404e Each needs a different proof.

A label needs its definition. The City’s item 11.1.8 is headed “Recommended”. Its text says certain new multi-family and non-residential development “must complete” an appendix of the Landscape Standards. The checklist’s introduction defines the label. A Recommended item is not required for the project to be accepted for review, and it may become a plan check correction required for later reviews. San Diego Land Development Manual, Section 4 We would copy the label with its definition and enter two items: a submittal item that is optional at intake, and a requirement item traced to the Landscape Standards themselves.

Guides need the same care. The US Access Board’s ADA guide carries labelled recommendations, such as specifying the midpoint of a dimensional range. US Access Board, ADA guide, Chapter 1 Copied without its label, advice reads as a requirement. Check scope too. The New England ADA Center says its checklist for existing facilities does not include all of the 2010 Standards and is not intended to determine compliance for new construction or alterations. New England ADA Center, About this checklist

The types below are ours and untested.

Type Question the item asks Proof to record
Submittal Is this document or drawing content in the package? Sheet or file name
Requirement Does the design meet this provision? Value found, value required, sheet, source section
Commitment Does the set carry out a permit or environmental condition? Condition number and where it is shown
Declaration Has the right person signed this statement? Signer, date, wording used
Verification Was it built or tested as approved, by the party the form names? Report, photo or measurement, with date
Advice Is this recommended by a guide or by the office? Decision and reason
Unresolved Is the rule or its application unclear? Question sent, to whom, answer and date

A submittal item can be complete while the requirement behind it is not met. A verification item cannot be closed during design. The County’s separate completion form asks for a certified auditor’s irrigation audit report and for verification that the required compost was incorporated. County of San Diego PDS-406e

Trace each item to its source

We compared two items on the County’s forms with two other County documents. One is the Water Efficient Landscape Design Manual, which carries the Director’s approval dated June 24, 2020. The other is a copy of the ordinance that the County posts. It is marked as a clean copy, with adoption date and signature lines blank.

We did not read the adopted County Code, because the County’s code library did not open for us. We did not contact the County. What follows are differences between documents we read. We do not say which is correct. Neither comparison establishes the law in force.

Two documents that read differently. The completion checklist cites Section 86.726 for the irrigation schedule. It says “No overhead irrigation allowed between 8:00 p.m. and 10:00 a.m.”, or any more restrictive period set by a public water purveyor. County of San Diego PDS-406e The design manual asks the schedule to confirm that overhead irrigation shall only be used during the shorter of two intervals: between 8:00 p.m. and 10:00 a.m., or any more restrictive one set by a purveyor. County of San Diego design manual The posted ordinance copy uses the same wording as the manual. County of San Diego ordinance, posted clean copy The form and the manual point in opposite directions on those hours. We would record the item as unresolved, ask the County which wording it applies before issuing a schedule, and check the purveyor’s hours.

A count that depends on the unit. The landscape form asks that the plan show two trees for each single family lot, citing Section 86.709(b)(10). Its next item sends the reader to Section 1.D(2) and to the tree planting guidelines in Section 5 of the design manual. County of San Diego PDS-404e The ordinance copy says two trees per dwelling unit, on private land outside the public right-of-way, and also points to the manual for which projects must comply. County of San Diego ordinance, posted clean copy The manual says dwelling unit in Section 5 and lot in its text on homeowner association guidelines. Its list of covered building types includes duplex and triplex. County of San Diego design manual The form itself directs the reader to the fuller text. An item copied from the form’s first line alone carries one of the two units. Where a lot holds more than one unit, we would ask the County which count applies.

We chose items that looked worth tracing, so these are no measure of how often documents differ. Where they differ, send the agency a written question and record the answer.

Record the edition, and expect it to move

On April 29, 2026 CalRecycle asked the Office of Administrative Law to approve an updated cross-reference in one of its own regulations. The letter says Section 492.6 of the state Model Water Efficient Landscape Ordinance (MWELO) was repealed and renumbered to Section 493.2, in effect January 2, 2025. The letter also says the CalRecycle rule had required compliance with 492.6 “as amended September 15, 2015”. CalRecycle letter A dated reference like that points to a particular text. Read how the citing rule frames its reference before renumbering an item. We did not confirm the decision on the request, and we did not read the official state regulation pages, which did not open for us.

The County ordinance copy cites 492.6 and 492.7. County of San Diego ordinance, posted clean copy We do not know whether the adopted code does. What a reference to a renumbered section means for a project is a question for the agency. Searching old lists for “492.” finds some items to reopen. It misses items that cite only a local section or no source.

Form families do not move together. As posted on November 24, 2026, the County’s email-submittal documentation checklist was revised September 21, 2026. County of San Diego PDS-404e The email-submittal completion checklist was dated July 2, 2024. County of San Diego PDS-406e The design manual lists forms PDS-404 and PDS-406 as appendices, without naming the email versions, and was approved June 24, 2020. County of San Diego design manual One date on a cover cannot describe sources like these. Date each item, and record which version of a form was read.

A new edition can be posted before it takes effect. The City announced a submittal requirements update on March 21, 2023, set an effective date of April 20, 2023, and said submittals prepared with the July 2022 version would be accepted until then. City of San Diego, March 2023 notice Keep a retired item with its end date, so the record shows which version a past submittal used. Which version governs a project in review is the agency’s call.

The record for one item

Our suggested fields, untested:

  1. Item number, never reused after the item is retired.
  2. Type, from the table above.
  3. Jurisdiction and reviewing body.
  4. Wording, written as a question with a value or location for an answer.
  5. Source, as a direct link, with section and page or form item number.
  6. Edition, and the date the source gives for itself.
  7. Applies when, with the threshold and its source.
  8. Last compared, with the date and the person who read the source.
  9. Status: active, unresolved, or retired with a date and replacement.

One worked record, for the County form’s water budget item: type, requirement; source, PDS-404e worksheet items; edition, Rev. 09/21/2026, email-submittal version; proof, both totals and the sheet; last compared, November 24, 2026, against the form only. County of San Diego PDS-404e

This costs time. A small office could start with requirement and declaration items for the jurisdictions it submits to most.

Keep project answers apart from the master list. A project file holds the copy used, with an applicability answer for every item. N/A needs a reason. “No irrigation in scope” can be checked later. A bare N/A cannot.

What research says about using the list

We found no controlled study of compliance checklists in landscape or plan-review work. The studies below are from surgery and aviation, and applying them to drawings is our interpretation. A surgical timeout is a spoken check done in moments. A drawing check is written and can be repeated, so these results may not transfer.

Recorded completion and observed completion can differ. In one hospital system, observers watched 142 pediatric operations over seven weeks. Hospital records showed 100% compliance with the pre-incision checklist for those cases. No case completed every item, and the average was 4 of 13 items. Levy et al. 2012 A count of ticked boxes is weak evidence that anyone looked.

Reading a list aloud does not guarantee detection. In another hospital, surgeons deliberately introduced errors into 120 of 1,800 pediatric timeouts, with ethics approval. Teams reported 54% of them. Muensterer et al. 2021

Results after adoption are mixed. Ontario compared three-month periods before and after hospitals adopted surgical checklists. The adjusted risk of death in hospital or within 30 days was 0.71% before and 0.65% after, a difference that was not statistically significant. The abstract notes that earlier observational studies had reported striking improvements. Urbach et al. 2014 A 2015 viewpoint article argues for reserving checklists for processes that are simple, easy to follow, standardized and perhaps time critical. Clay-Williams and Colligan 2015 That argument cuts against our own seven types wherever an item needs judgement.

Design advice from the flight deck. The authors of a 1990 NASA report on flight-deck checklists propose guidelines, say they are not specifications, and say some may conflict when applied individually. Degani and Wiener 1990 Two guidelines and one point from its discussion seem to transfer to drawings:

  • A response should state the status or value found, and “checked” is not enough. Degani and Wiener 1990
  • A long list should be split into smaller lists tied to systems. The most critical items should come near the start. Degani and Wiener 1990
  • From the discussion: a list that leads the work, a do-list, removes one layer of redundancy. Degani and Wiener 1990 We would let the designer use the list while drawing, then have a second person open the source and check from the sheets.

We keep a complete master list and a short project list, filtered by jurisdiction, project type and phase.

Keep it current

Our routine, untested:

  1. At project start, copy the filtered list and reopen every agency form. Compare revision dates.
  2. Before each submittal, repeat the date comparison. If a form changed, compare the versions line by line.
  3. On notice of a code change, search the master by source and section. Tracking regulatory updates lists notice mechanisms.
  4. After each comment letter, ask whether the list missed the issue, stated it wrongly, or had it and nobody acted. Add an item only in the first case.
  5. Once a year, reread the source of any active item with an old comparison date.

We suggest assigning the master list to one named person, and having the licensed professional responsible for the scope approve any change to a requirement item. That is our suggestion and no licensing rule.

What we could not settle

  • Which overhead irrigation wording does the County apply at completion, and what does the adopted text of Sections 86.709 and 86.726 say? Does the adopted code still cite Sections 492.6 and 492.7 of the state model? We did not read it or ask the County.
  • What do the official California Code of Regulations pages show for the state model today? They did not open for us. We left out statements that rested only on an unofficial copy, including the state model’s irrigation hours.
  • What do the City’s Landscape Standards require of the projects named in item 11.1.8?
  • Do typing, tracing and dating items reduce plan-check comments on landscape projects? We found no study, and we have not tested the method.

Using this in Field Method

Site Lens collects public data for a San Diego County site. Its Code compliance view lists dated candidate source documents and agency roles from a first San Diego-area library. A listed document is a candidate that may not apply. Site Lens does not hold a compliance checklist, check a design against one or determine compliance.

Sources

  1. City of San Diego — Land Development Manual, Project Submittal Requirements, Section 4: Development Permits/Approvals
  2. County of San Diego — Landscape Documentation Package Checklist, PDS-404e (email submittal version)
  3. Caltrans — Local Assistance Procedures Manual, Exhibit 12-E: PS&E Checklist Instructions
  4. Caltrans — Local Assistance Procedures Manual, Exhibit 12-D: PS&E Checklist
  5. US Access Board — Guide to the ADA Accessibility Standards, Chapter 1: Using the ADA Standards
  6. New England ADA Center — ADA Checklists for Existing Facilities: About this checklist
  7. County of San Diego — Landscape Certificate of Completion Checklist, PDS-406e (email submittal version)
  8. County of San Diego — Water Efficient Landscape Design Manual, approved June 24, 2020
  9. County of San Diego — Water Conservation in Landscaping Ordinance, posted unsigned clean copy (file name dated June 24, 2020)
  10. CalRecycle — Justification of Changes Without Regulatory Effect, 14 CCR § 18989.2(a)
  11. City of San Diego — Public Notice: Project Submittal Requirements Update, March 2023
  12. Levy et al. (2012) — Implementing a surgical checklist: more than checking a box, Surgery 152(3)
  13. Muensterer et al. (2021) — Timeout procedure in paediatric surgery: effective tool or lip service?, BMJ Quality & Safety 30(8)
  14. Urbach et al. (2014) — Introduction of surgical safety checklists in Ontario, Canada, New England Journal of Medicine 370(11)
  15. Clay-Williams and Colligan (2015) — Back to basics: checklists in aviation and healthcare, BMJ Quality & Safety 24(7)
  16. Degani and Wiener (1990) — Human Factors of Flight-Deck Checklists: The Normal Checklist, NASA CR-177549