DFLA (Dermot Foley Landscape Architects) for Dublin City Council, with the council's parks service · Dublin 8, Ireland

A one-hectare Liberties park that reuses construction, demolition and manufacturing waste in paving, landform and some planting substrates. DFLA reports engaging residents and community gardeners.

Recognised in 2023

The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.

How it came about and changed

  1. 1960s–2003

    The Irish Times describes remnants of a 1960s apartment complex on the site, pulled down in 2003. RTÉ also dates demolition of the original Bridgefoot Street flats to 2003.45

  2. Before 2016

    A public-private scheme of about 200 apartments and a community centre fell through in the economic crash. Residents used the vacant land for a community garden, and a campaign group sought a park. RTÉ reported in 2017 that the council had earmarked the site for 100 homes before agreeing to a park on the whole site, and that 58 social homes were to be built next to it.45

  3. 2016

    In April the Irish Times reported that the campaign group had met for about 18 months and that councillors were due to vote on rezoning the land for recreation and open space. It reported open days on 22 and 23 April, which University College Dublin landscape architecture students helped prepare, and design consultation workshops due to begin on 4 May. In May the Irish Times reported that campaigners had been told late in April that the workshops, set for 4 and 11 May, were postponed until further notice. According to Councillor Tina McVeigh, the council had said its housing department was reviewing the site and had indicated that the land might be considered for other uses; McVeigh said residents, business owners and allotment users were very disappointed and "absolutely livid". The council had been asked for comment and had not yet replied.415

  4. 2017

    In November RTÉ reported planned features including flexible open space, allotments, community gardens, café space, a terraced performance area and informal and formal play.5

  5. 2017

    After councillors approved the plans, gardeners received an eviction notice; Dublin Inquirer reported that gardeners and employment-scheme workers were to leave by 31 December. The plan was for the community garden to return in a new position after construction; allotment holders were still seeking a guarantee. It reported that the notice came without other communication, which worried gardener Richie Taplin. Taplin said gardeners had thought they would be at the table for discussions on planting in the area; the paper reported that they had not yet secured a meeting with council officials. A council spokesperson said it planned to meet the groups and would help move and store materials, soil and crops where possible.6

  6. 2019–2022

    In October 2019 work was still expected to start, with opening due in 2021. The build was delayed by Covid lockdowns, and the Lord Mayor opened the park on 4 May 2022.78

  7. 2021

    Dublin Community Growers reported that the council's parks service had asked Robert Emmet Community Development Project to help form a committee to manage the new garden; thirteen local organisations and residents' groups had put forward representatives.13

  8. 2022

    The Liberties Dublin reported play areas, informal play features and sensory elements at opening; the council's page lists play areas.83

  9. Materials

    Landscape Architecture Australia, drawing on an interview with Dermot Foley, reports subsoils, concrete lumps and steel railings found on site, broken footpath concrete from council depots, recycled glass chippings and brick seconds. LILA describes reused secondary raw material in finishes, landform, sub-bases, paving, retaining elements, loose aggregate and in-situ concrete, with calp stone among the paving. Foley says the council funded a sample area before construction and bidders were encouraged to visit it while pricing. The article reports five bids and a document set beyond the usual requirements.101

  10. Testing and records

    Asked about consultant coordination, Foley describes large concrete chunks, some over a tonne, used for climbing. In this interview account, the civil engineer coordinated materials testing, pieces failing contamination tests were taken out and sharp edges were ground down. A nature play consultant made several visits, reviewed mock-ups and signed off the play elements. No test method, results, play standard or inspection after opening is given. Quantities were tracked, but cost and carbon savings were not measured in detail. Foley said there was no clear administrative framework for such reuse in permanent public space.10

  11. Soils and planting

    DFLA's published project text describes crushed secondary material blended with subsoils and topsoils in four percentage mixes to test natural colonisation; it gives no percentages, mix locations or trial results. Foley also describes mixes of subsoils, quarry dust and brick by-product, with detailed planting and substrate plans and an outcome not fully predictable.29

  12. Soils and planting

    In the 2025 interview Foley says some areas were planted by conventional methods, while others, with mixes of subsoil and topsoil, were left fallow to self-seed and greened faster. The passage does not say whether those mixes held recycled material. This is Foley's observation, not a survey.10

  13. Biodiversity claims

    Foley writes that the design makes explicit the idea that waste can host greater biodiversity than conventional substrates, and reports rapid colonisation by native, ruderal and garden-escape species. The council describes its wildflower approach as light-touch and self-sustaining. No species survey or before-and-after comparison for the park was found in the sources read.93

  14. Carbon claims

    The designer presents the approach as helping with carbon: Foley's article links it to decarbonising public space. The council's award entry says the new planting helps reduce carbon emissions through carbon uptake and storage. In a passage that also discusses secondary materials, it says the park's design shows how to help reduce carbon impact in designing new public spaces. LILA's project text refers to embodied energy retained in the park and many tonnes redirected from landfill. Foley says no carbon calculation or similar analysis was done. No carbon saving, storage figure or diverted tonnage was found.912110

  15. Council's 2023 award entry (current page title reads 2026)

    The council's Green Cities Europe Award entry gives an estimated 2,000 m³ (135 truckloads) of imported inert material, most of it from other Dublin building sites. It says subsoil and topsoil were also imported for the community gardens, lawns and tree planting, and gives about 180 trees planted.12

  16. Council's 2023 award entry (current page title reads 2026)

    The council claims that daylighting almost 1 ha of soil improves permeability and reduces runoff, and describes a swale for excess rainwater. No permeable area net of paving, infiltration test, design storm or runoff measurement was found. The entry also says accessible green space in the Liberties rose to 27,500 m² through this park and Weaver Park together.12

  17. Community and use

    Credited contributions include community gardeners, bird boxes by early school leaver trainees and a sculpture made through a prison after-care service (the CCCB sheet describes former prisoners). DFLA's published project text reports rare vandalism, partly crediting informal local park champions, and little negative feedback on the wilder look; it gives no data. The council entry says the council and residents continue to work together on management.121112

  18. 2023

    The park was named LILA 2023 Winner in Public Landscapes. On 6 September 2023 Green Cities Europe's Irish site announced that a judging panel had named it the Irish winner of the Green Cities Europe Awards 2023 and that it would be put forward as Ireland's entry to the European competition. No European award for the park was found.116

  19. 2024

    In July 2024 Dublin Inquirer reported gardeners at Taplin's Field community garden in the park working on biodiversity. A small wetland, begun the year before and meant to be fed by water collected from the café container's roof, was still in progress. The garden is named for Richard Taplin, who ran the earlier garden and died in 2019. It works on larger shared projects, unlike the old garden's communal area and individual allotments.14

  20. 2025

    The 2025 article says a two-person team from the soft landscape contractor, which also helped build the park, maintains it regularly. Foley describes discreet but active management, including hand removal of dominant nettles, which Foley notes support some butterflies, so other plants can establish. Foley says no maintenance or planting design manual has been formalised, though techniques are documented informally, and that, although Foley's professional involvement in the project is complete, there are still regular conversations about how best to maintain the landscape. No formal ecological monitoring, maintenance cost or contract term was found.10

  21. 2026

    On 21 May 2026 Dublin Inquirer reported that metal fences blocked the playground, which had been closed for planned maintenance in January, "for a couple of days" in the words of a council parks Facebook post. It also reported that the café kiosk had closed at the end of 2025, its operator, PACE, pointing to an increase in drug dealing around the amenity. In a written reply to a councillor, the council said the playground was in the final stage of post-installation certification, which should be done by the end of June. A council spokesperson said it was engaging a new café operator. The spokesperson also said a mobile park warden pilot was under way and that its patrols had helped deter drug dealing. A search on 25 November 2026 found no confirmation that the playground or café had reopened.17

Approvals and legal steps

  • 2017 Press reports support approval in 2017: Dublin Inquirer reported on 15 November that councillors had approved the park plans the week before, after RTÉ had reported on 2 November that a vote was expected. The Liberties Dublin later dates planning consent to 2017. Dublin Inquirer links the plan under a Part 8 label.657

No council minute or decision record was read, so no exact decision date or conditions are given. The record of a rezoning vote was not read. No waste-law or end-of-waste decision for the reused materials and no material test reports were found in the sources read.

Funding

  • 2016 In April 2016 the Irish Times reported that the council had agreed to fund the design consultation; no amount was given.4
  • Project sheet for 2022 The Public Space database gives a cost of €2,000,000, with Dublin City Council as developer. It does not say what the figure includes, its price date, or whether it is a budget or final cost.11
  • 2025 account Landscape Architecture Australia reports that the park was built on a budget of less than €200 per square metre. Foley said exact savings were hard to identify. Foley felt the approach was not necessarily more cost-effective but, in Foley's words, "certainly energy-effective" (no figure given). Foley also noted that reuse needs skilled labour and slows design and construction, and nonetheless believed the project as a whole was very cost-effective. Cost and carbon savings were not measured in detail.10

No source read gives the funding streams, an outturn cost or maintenance costs. Neither cost figure states its price date, scope or outturn, so neither is a cost rate to reuse; any agreement between them on a 1 ha area is not independent confirmation.

People

  • DFLA (Dermot Foley Landscape Architects) Landscape architects; designer, reporting community engagement
  • Dublin City Council, including its parks service Client and developer; design collaboration; management with residents
  • Bracegrade Building and Civil Engineering Contractors Constructor (Public Space database)
  • Soft landscape contractor (not named) Crew helped build the park and maintains it (Landscape Architecture Australia)
  • Civil engineer, surveyor, mechanical and electrical engineer, nature play consultant (not named) Project team; the engineer coordinated testing, the play consultant reviewed play work
  • University College Dublin landscape architecture students Helped prepare the 2016 open days
  • Park campaigners, community gardeners and local residents Campaign, gardening on the site, engagement
  • Early school leaver trainees and members of a prison after-care service Bird boxes and sculpture

Sources for this page

  1. Landezine International Landscape Award, Bridgefoot Street Park (LILA entry page)
  2. Landezine, Bridgefoot Street Park by DFLA
  3. Dublin City Council, Bridgefoot Street Park
  4. The Irish Times, A public park for Dublin's Liberties within reach for locals (22 April 2016)
  5. RTÉ News, Plan to turn derelict site into green space ready for approval (2 November 2017)
  6. Dublin Inquirer, Changes Bring Uncertainty for Bridgefoot Street Gardeners (15 November 2017)
  7. The Liberties Dublin, Bridgefoot Street Park Set to Start (5 October 2019)
  8. The Liberties Dublin, Bridgefoot Street Park Opens (4 May 2022)
  9. Garden and Landscape Designers Association, Bridgefoot Street Park, by Dermot Foley (Compass, vol. 76)
  10. Landscape Architecture Australia, Remains of the day: DFLA's Bridgefoot Street Park (12 June 2025)
  11. Public Space (CCCB), Bridgefoot Street Park, Dublin (Ireland), 2022
  12. The Green Cities, Green Cities Europe Award 2023 entry: Ireland, Bridgefoot Street Park (current page title reads 2026)
  13. Dublin Community Growers, Bridgefoot Street Community Garden Survey (2021)
  14. Dublin Inquirer, In Bridgefoot Street Park, a community of gardeners experiment with ways to increase biodiversity (24 July 2024)
  15. The Irish Times, Liberties residents are 'livid' after scrapping of park plans (10 May 2016)
  16. Green Cities Europe (Ireland), More about Our National Winner: Bridgefoot Street Park (6 September 2023)
  17. Dublin Inquirer, Council says it does intend to reopen long-closed playground and coffee kiosk at Bridgefoot Street Park (21 May 2026)

Researched on 2026-11-25 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.

The question it brings · interpretation

When reclaimed waste becomes park paving, landform and planting substrate, what records of material origin, testing, as-built quantities, substrate locations, management and ecological change should later stewards be able to consult?

Each question is Field Method’s interpretation, not a claim made by the source.

The date

2023: Landezine International Landscape Award (LILA), winner in Public Landscapes. Design: 2016 to 2022 (LILA); public consultation reported from April 2016. Approval: councillors' approval reported in November 2017. Construction: delayed by Covid lockdowns. Opening: 4 May 2022 (The Liberties Dublin).

Checked against

See it on the timeline