ProjectCities and people

2022

Urban River Spaces

Co.Creation.Architects (Khondaker Hasibul Kabir and Suhailey Farzana), with community networks and design partners, for the Municipality of Jhenaidah · Jhenaidah, Bangladesh

Two stepped river landings (ghats) on the Nabaganga, with walkways and access paths, built in 2018–19 according to award data. Public-space workshops preceded them. The smaller ghat is designed for bathing, washing and rituals.

Recognised in 2022

The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.

How it came about and changed

  1. 2014–2018

    According to the award description, Kabir and Farzana moved back from Dhaka in 2015 to Jhenaidah, where they grew up. It says they began helping low-income communities build their own houses, then held many workshops on the city's public spaces. A project profile naming Farzana as leader says about 20 groups had met since 2014 on linking open spaces, river and ponds. A firm post dated 2018, later modified, lists eight workshop groups, among them children, teenage girls, older people, and women and men from lower-income communities, who drew ideas for streets and open spaces. It names citizens, the municipality, the firm and ALIVE as initiators.365

  2. 2018–2019

    Award data give commission and design in 2018, construction in 2018–19 and occupancy in 2019, with a 4,267 m² site and 1,632 m² built area. A firm post dated September 2018 and modified in May 2019 showed a Nabaganga ghat under construction. According to the award description, the municipality employed local craftspeople to carry out the work and the architects consulted without a fee. The project page says brick and concrete were used and credits local builders and masons. Award data name two structural engineers.354

  3. As described in 2022: public ghat

    The awarded work was described as two ghats with adjacent walkways and access paths. The award description gives local brick for all visible surfaces. The project page reports that obstructed pedestrian paths leading to the ghats were opened and that existing trees and vegetation were kept. The 115 m public ghat has two levels, linked by several stairways and a ramp that the award text says is for disabled people. That text puts the lower level at least 3.7 m above the water. It gives no datum, season or measurement date, so this is not a record of flood clearance. A retaining wall serves for exhibitions, and a parapet winds around older trees to form shaded seating. The ghat is also described as usable as a two-level auditorium. A photo caption credits the municipality with docking facilities there.34

  4. As described in 2022: community ghat

    Steps take the smaller ghat directly to the water. The award description, which does not name its location, says a low-income community uses it extensively and that it serves bathing, washing and religious rituals, with benches and a changing room. A project-page caption says a narrow path and stairs lead to its lower level. The page labels a drawing as the Shatbariya community ghat and says the community requested the changing room in a collaborative design session. The 2021 profile says the Shatbaria riverside community designed a ghat with particular attention to women's privacy. In February 2022 The Business Standard said, in its own narration and not as a resident's quotation, that locals had found bathing and washing clothes difficult, fearing such use of the bank would cause erosion, and that the brick ghat at Shatbaria, with seating and a changing room, had changed that. It quoted Kabir saying a ghat had been made in that area. It also quoted Towhidul Alam, whom it identified as a POCAA (Platform of Community Action and Architecture) member and award data list among the organisers and co-designers: residents raised the need for seating and a women's changing space while a ghat was being built. That passage does not name the ghat.3467

  5. 2021–2022: riverside accounts

    The 2021 profile describes a ghat with a wide pedestrian area designed and built at the city centre. It gives no length and does not use the award's public ghat name. In February 2022 The Business Standard described a popular riverside park by the City Centre, among what it called 200-year-old Debudaru (debdaru) trees, with brick steps and seating. It credited the firm, with the mayor's help, and said the mayor arranged consultations with constituents. In September, Prothom Alo reported in Bengali that the pourashava (municipality) had implemented one part of the firm's Nabaganga design, named Debdaru Avenue, under Saidul Karim, then mayor. The same article lists water gardens, a community ghat, an open stage and walkways in the design, and ties the design's benefits to implementation. Neither of those two news reports matches the work it describes to the award's 115 m public ghat. In October 2022 Bangladesh Post reported that the Eco Park, better known as Debdaru Park, on the southern bank in Jhenaidah town, had won the 2022 award. It reported Kabir as saying 40 percent of the work had been completed so far; the report does not say whether that covers the awarded ghat or a wider plan. The report is imprecise elsewhere: it speaks of 20 parks among 463 establishments.67811

  6. 2021–2022: beyond the two ghats

    Wider plans should not be read as built. The 2021 profile set a goal of protecting 5 km of riverside from encroachment and pollution and said the municipality was still arranging a budget. In February 2022 The Business Standard reported a design for 4 km of shore from Shatbaria to Chaklapara, a design in progress covering both sides of the river, or around 10 km, a 1,000-foot open space under construction and 'river gardens' being designed to treat wastewater. The project page lists later walkways, gardens, cultural facilities and river biodiversity work. It also says all city trees were surveyed to propose planting. No completion record for these proposals was found.674

  7. 2019–2022: reports about the river

    Reports also describe other action and pressures. In November 2019 Prothom Alo English, citing UNB, reported a water hyacinth clearance by the upazila administration, public representatives and residents; the upazila officer said over 5 km through the town had been cleared. In March 2021 The Financial Express reported environmentalists' warnings about pollution, encroachment and sand and soil removal threatening 13 district rivers, including the Nabaganga. It also linked sewage drains to pollution of the rivers generally, without naming one. That report does not assess the town reach or the ghats. In February 2022 The Business Standard blamed slow development of municipal-area drainage for wastewater going directly into the Nabaganga. Where this happens in relation to the ghats was not established.9107

  8. 2022: award

    The project was one of six winners announced on 22 September 2022, after 20 were shortlisted from 463 nominations; the ceremony followed in Muscat on 31 October. The jury credits committed designers and social workers with leading the process, and places the project within a wider initiative for decent housing in informally built areas. It also credits steady community participation, extensive involvement of women and marginalised groups, and local labour with turning a derelict informal dump into a multifunctional space valued by diverse communities. It says the project reversed ecological decline and health hazards on the river and banks and improved river ecology. These are award judgements: no supporting baseline, water, habitat or health data were located. For the two ghats, the descriptions read mention retained trees and vegetation, clean-up and opening of access, and brick and concrete works; no new planting, habitat or drain-treatment work there was found. For the public ghat, the award description reports regular use by people of all ages. It also relays the mayor's account that representatives of more than 50 municipalities visited to learn from the community engagement programmes.121234

Approvals and legal steps

No council resolution, permit, land arrangement, river or land clearance, or environmental approval for the ghats was found in the sources read. A client credit, a mayor's support and public consultation are not treated as approvals. The municipality's website could not be opened.

Funding

  • 2021 (profile update) Scope: the profile's city-centre ghat and community ghat, not expressly matched to the award's two. On support for land, material and labour costs, it says the municipality took part for the first and the NGO BRAC for the second, with no amount or share for either ghat. Separately, it shows €9,000 as still 100% needed, with items for workspace set-up, a year's operation, water-garden seed money and community architects; it also shows 40% of funding raised, without reconciling the two. It calls the Shatbaria ghat under construction; in February 2022 The Business Standard described it as built.67
  • February 2022 Scope: Shatbaria ghat. The Business Standard put it at about Tk20 lakh (Tk2 million). BRAC's Urban Development Programme paid most and the pourashava fund bore 20%; a BRAC official said BRAC provided money after the municipality approached it.7
  • February 2022 Scope: the City Centre riverside park, which the report gives as 600 feet by 16 feet. It puts the cost at about Tk1 crore (Tk10 million), with money from the pourashava development fund. It also says the former mayor collected Tk1 crore from another project to make the park, without explaining how the two statements relate. It does not identify the park as the award's public ghat.7
  • October 2022 Scope: the Eco Park/Debdaru Park as Bangladesh Post describes it. It reported Saidul Karim Mintu, called the former mayor and the park's initiator, as saying Tk2 crore (Tk20 million) had been spent so far with the municipality fund, including Tk1.15 crore of UGP fund (the report does not expand UGP), and that another Tk3 crore would be required for construction and decoration. These figures are not reconciled with The Business Standard's or with award data.11
  • 2022 (award data) Scope: the awarded project as listed. Project cost US$164,280. This is a stated cost, not a funding breakdown: no funder shares, price year or exchange rate are given.3

The figures differ in scope or basis; do not add them or compare them as cost growth. No municipal account or final cost record was read. The US$1 million prize was shared among six winning projects and is not counted as construction funding.

People

  • Khondaker Hasibul Kabir and Suhailey Farzana (Co.Creation.Architects) Co-founders and architects of what the award text calls an architectural and landscape design studio; that text reports pro bono consultancy
  • Municipality of Jhenaidah Client; employed local craftspeople
  • Saidul Karim Mintu Mayor listed with the client in award data; described as former mayor in 2022 reporting
  • Kamrul Islam and Md. Rashed Ali Khan Structural engineers
  • Local craftspeople, builders and masons (not named) Construction
  • Residents and workshop groups Workshop groups, including women's and lower-income groups, drew public-space ideas; the profile says the Shatbaria riverside community (a name the award description does not use) designed a ghat, attending to women's privacy; the jury cites extensive involvement of women and marginalised groups
  • Social workers (not named) Credited by the jury, with designers, for leading the process
  • Citywide People's Network: Khan Mohammad Abdullah, Rahabir Ahmed, Towhidul Alam, Khwaja Fatmi, Babul Hossain Supporting entity; listed as organisers and co-designers
  • Platform of Community Action and Architecture: Mahmuda Alam, Rubaiya Nasrin, Nazia Roushan, Emerald Upoma Baidya Supporting entity; listed as co-founders and co-designers. Kabir and Farzana also co-founded it
  • Community Architects Network: Chawanad Luansang and Supawut Boonmahathanakorn Supporting entity; listed as co-founders and co-designers
  • Asian Coalition for Housing Rights: Somsook Boonyabancha Supporting entity; listed as co-founder and co-designer
  • ALIVE Named among initiators in the firm's workshop post (dated 2018, later modified)
  • BRAC (Urban Development Programme) Reported funder of most of the Shatbaria ghat

Sources for this page

  1. Aga Khan Development Network, Aga Khan Award for Architecture 2022 winners
  2. Aga Khan Development Network, Winners of the 2022 Aga Khan Award for Architecture announced
  3. Aga Khan Award for Architecture, 2022 award recipients: project descriptions
  4. Aga Khan Development Network, Urban River Spaces (project page)
  5. Co.Creation.Architects, Co-Create Jhenaidah 02 (posted 15 September 2018, modified 6 May 2019)
  6. Architecture in Development, Let's co-create our city: Jhenaidah (updated 11 August 2021)
  7. The Business Standard, Vision for a modern city: The quiet transformation of Jhenaidah town (18 February 2022)
  8. Prothom Alo, বদলে যাবে ঝিনাইদহ (updated 25 September 2022)
  9. Prothom Alo English, citing UNB, Nabaganga river gets new life (25 November 2019)
  10. The Financial Express (Bangladesh), Thirteen rivers in Jhenidah about to die (24 March 2021)
  11. Bangladesh Post, Jhenaidah Municipality Eco Park bags Aga Khan Architecture Award (14 October 2022)
  12. Bengal Institute, Vibrant Award Ceremony for the 2022 Aga Khan Award for Architecture Held in Oman (8 November 2022)
  13. Arquitectura Viva, Urban River Spaces, Jhenaidah

Researched on 2026-11-25 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.

The question it brings · interpretation

Over several monsoons, what records of water levels, bank and step condition, upkeep, and who can reach and use each ghat, women included, would show how these landings work?

Each question is Field Method’s interpretation, not a claim made by the source.

The date

2022: Aga Khan Award for Architecture; winners announced 22 September 2022, ceremony in Muscat 31 October 2022. Award project data: commission and design 2018, construction 2018–19, occupancy 2019. The wider city process began earlier. A profile marked updated August 2021 calls the Shatbaria ghat under construction; in February 2022 The Business Standard described it as a built brick ghat. No exact completion date for this ghat was found outside award material.