Heart of the City: Art and Equity in Process and Place

Coen+Partners, with RSP Architects, public artists including Ann Hamilton with poet Gwen Westerman (A Song for Water), and others, for Destination Medical Center and the City of Rochester · Rochester, Minnesota, United States

A first-phase rebuild of downtown streets and Peace Plaza's east end beside Mayo Clinic: curbless street, movable benches, trees, public art. Paving drew complaints over raised lettering and settling; some lettered stones were turned smooth side up.

Recognised in 2023

The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.

How it came about and changed

  1. Before 2020

    The ASLA project text describes a wide street lined with parking beside the Mayo Clinic campus, mostly sidewalks that did not meet ADA access requirements, and no gathering places. Destination Medical Center (DMC) is a 20-year economic development initiative that the same text puts at $5.6 billion.1

  2. 2017–2019

    The team reports more than 70 engagement sessions: 35 one-to-one meetings with business and property owners, 12 open house and art and design events, 12 pop-ups, 11 prototyping events and 3 DMC discussions. It says feedback led to 12 principles, and that a mocked-up terraced viewing stage, judged to block the plaza, gave way to benches on rails. The pages read give no dates for these sessions and no account of who attended; the years shown here are the design period before construction.1216

  3. 2019

    Published plans covered the east end of Peace Plaza, First Avenue and nearby alleys: a curbless layout, reconfigurable benches, more trees (reported as rising from 11 to 107 or to 117), permeable paving, a raised Peace Fountain with new water at its base, and public art. Med City Beat reported that cars would still use First Avenue, with less through traffic; a curbless design helps reduce traffic speed, typically down to 7 to 10 mph. Parking was to fall to 17 spaces described as ADA-compliant. It also reported that existing plaza cross slopes exceeded ADA standards and would be corrected.45

  4. 2020–2022

    Construction began in 2020 and the first phase opened in May 2022. The Post Bulletin reports that work concentrated on the east end of the plaza and First Avenue, and that the west end was put on hold because other changes were expected. The snow-melt system was switched on in December 2021.1141678

  5. As opened, 2022

    The ASLA text lists a curbless street, accessible custom furniture, 117 street trees in soil cells, pervious pavement feeding the cells and heated sidewalks. The team's Landezine entry places continuous soil volumes and pervious pavement in its forest rooms. KTTC reported heating for both the roadway and the sidewalk on First Avenue by the plaza. The team says heating reduces the need for de-icing salt. ASLA credits a Mayo Clinic ADA specialist with universal design advice and says paving patterns are easier for visually impaired people to navigate. No measured results for trees, stormwater, salt use or wayfinding, and no season-long snow-melt performance, were found.127

  6. 2022

    In Ann Hamilton's A Song for Water, an excerpt from a poem by Gwen Westerman, an enrolled member of Sisseton Wahpeton Oyate, forms the central spine, crossed by other text fragments, in raised-letter granite pavers with a shallow pool that fills from time to time. The artist's studio says the poem, De Wakpa Taŋka Odowaŋ / Song for the Mississippi River (2018), was originally commissioned by the Friends of the Mississippi for their The River Inspires event. The ASLA text says the art acknowledges the site as Dakota land. Other works it names are Eric Anderson's Wakefield, a mist piece driven by Mayo Clinic data on births and deaths, and Iñigo Manglano-Ovalle's A Not So Private Sky; the 1986 Peace Sculpture got a new plinth. The pages read describe no wider Dakota consultation.31

  7. 2022–2023

    The ASLA text reports more than 100 events and over 2,500 pedestrians a day on average, without a counting method or period; the team's Landezine entry dates the events to the end of 2022. In November 2021 DMC's economic development agency had described a post-occupancy study due near the end of 2022; its findings were not found. In November 2021, before the opening, the Post Bulletin also reported Rochester resident Paula Hardin telling the City Council of accessibility problems; Hardin said some slope and cross-slope issues were not as bad as expected, but had not been optimal when checked in August. It reported doubts from some residents and council members too, including about sidewalk pavers. The equity named in the project title is not explained in the ASLA project text.126

  8. 2024

    In October the Post Bulletin reported settled, uneven pavers on the plaza and two blocks of First Avenue, with a warning sign. Deputy City Administrator Cindy Steinhauser said the cause needed more study and would determine whether the contractor covered the fix; she expected a fix would likely keep much of the design while opening more walking space. Staff had held focus groups with people with disabilities; some people struggle on the raised lettering. Council member Molly Dennis wanted the art in the First Avenue intersection removed, which Steinhauser said was not planned, and Mayor Kim Norton criticized the delay.17

  9. 2024

    In November KTTC reported that unsettled pavers, causing a tripping hazard in its words, were being reset for $20,000 paid by DMC. City project manager Josh DeFrang said the city had anticipated the issue and weather played a role.18

  10. 2025

    By February the city had received many complaints about the raised lettering; KROC reported that many criticisms concerned its effect on people with mobility and vision limitations. There were also complaints about uneven settling. Steinhauser said the design met federal ADA requirements, available data did not show safety hazards, and trip-and-fall data was virtually unchanged from before the renovation; she noted that the data relies on reported incidents. Jamie Rothe of DMC's agency said people with mobility issues had supported the pavers when a smaller section was tested, but complaints grew after full installation. KTTC reported that Paula Hardin, whom it described as a disability rights activist, said she had objected since 2015, and that she feared injury crossing the lettering with her walker. No page read records how design-stage objections were handled.91014

  11. 2025

    Council views differed. Norman Wahl was quoted as saying “100% of all the feedback I’ve got is that the raised lettering is a hazard”; Patrick Keane said comments he received did not match what staff was hearing. Andy Friederichs proposed making the whole area smooth at once, and Dan Doering questioned further study, saying cones at sinking pavers showed the design was not working. KTTC reported that a majority suggested changing all lettered plaza pavers to smooth ones. Steinhauser said many people asked to keep at least part of the art, and that the city had heard requests to make the space easier to cross, not calls for removal.910

  12. 2025

    At the 19 February vote, Wahl and Shaun Palmer voted no and sought a different approach. Friederichs called the plan imperfect but a step forward, and Doering backed it while wanting more done, saying residents wanted immediate action because they found the space unusable. Norton supported clearer path cues. Steinhauser said the former grass had been harder to cross by wheelchair than the raised pavers. As possible causes of settling, none confirmed, Steinhauser had named roof runoff or something beneath the pavers; construction director Steve Sampson Brown said the study could examine geology or heavier foot traffic.911

  13. 2025

    In February the city had described replacing sinking pavers around First Avenue trees with grates. Work began on 14 July to turn some lettered pavers smooth side up and widen walking routes; KTTC reported about 1,000 fewer raised pavers expected, and said the city had consulted several disability groups and the artist, Ann Hamilton, before approving the project. In May 2026 the Post Bulletin quoted Steinhauser as saying the work reset 2,104 pavers to address settling concerns, a separate matter from turning etched ones. It also reported that some tree grates were installed, not extending fully along First Avenue.91316

  14. 2026

    On 11 May the Post Bulletin reported Sampson Brown saying that pavers had settled, likely from frost and other natural conditions, and that staff were not seeing the larger early problems. It reported that some pavers beside First Avenue trees would be reset and that work would address snow-melt leaks. On 27 May it reported that a proposed study would seek the cause of settling. Pamela Wheelock, chair of the DMC Corporation board, said defining the cause would better place the city to recoup costs or seek payment from the designer or contractor, if appropriate. Council President Randy Schubring said the study mattered for avoiding further state support, and that the council should hold them accountable whether the problem was design, engineering or construction. No response from a designer or contractor was found in the pages read, and no finding of cause or responsibility.1516

Approvals and legal steps

  • 2025 Early 2025 (6 February per KROC; January per KTTC): the DMC Corporation board approved up to $175,000 for paver changes and further study.121113
  • 2025 On 19 February the Rochester City Council backed the staff plan, a partial change to the paving, by 5 votes to 2.1112

News from May 2019 shows the design heading to the DMC board and City Council; no page opened records the decisions of 2019 or the 2020 construction approvals. On 27 May 2026 the Post Bulletin reported that the proposed $334,000 still needed City Council approval; no later decision was found in the pages used (checked November 2026).

Funding

  • 2019 Phase one was projected at $15 million (an earlier projection was $16.7 million), expected to come from state DMC infrastructure funds. A projection, not final cost.54
  • 2019 About $3 million was reported as reserved for public art; the report does not say whether this sat within the $15 million.4
  • 2021–2022 Reported figure for the east-end renovation in November 2021: $17 million. KTTC put the snow-melt system, part of the project, at about $1.6 million.67
  • 2024 KTTC reported $20,000 from DMC for resetting unsettled pavers.18
  • 2024 KTTC described Heart of the City, finished in 2022, as an $18.6 million project. Basis not stated.18
  • 2025 KTTC described the completed project as costing nearly $20 million. Basis not stated.10
  • 2025 Paver changes and study: up to $175,000 in state DMC funds, approved in early 2025 (6 February per KROC; January per KTTC).111213
  • 2026 Proposed, not shown as approved on 27 May 2026: up to $334,000 more in state DMC funds, moved from $500,000 set aside for Saint Marys public realm design, for First Avenue pavers, tree surrounds and a study of the settling. Former DMC economic development agency board president Clark Otley said future repairs would likely need other funding.16

The figures have different dates and scopes and should not be added or read as cost growth. No final audited cost was found.

People

  • Coen+Partners Landscape architecture and design lead (the firm's Landezine entry)
  • RSP Architects Architecture office involved in the design (Coen+Partners' Landezine entry)
  • Latent Design Bench and movable furniture detailing
  • Kimley-Horn Civil, electrical and structural engineering
  • Fluidity Design Consultants Fountain design
  • El Dorado (Hesse McGraw) Art curator
  • Ann Hamilton Artist, A Song for Water
  • Gwen Westerman Poet and historian, enrolled member of Sisseton Wahpeton Oyate; text in A Song for Water
  • Eric Anderson Artist, Wakefield
  • Iñigo Manglano-Ovalle Artist, A Not So Private Sky
  • Destination Medical Center and City of Rochester Client
  • Kraus-Anderson Project management
  • Carl Bolander & Sons Earthwork and utilities
  • Windsor Companies Landscape (ASLA credit)
  • Precision Hardscape Paving
  • Hunt Electric Corporation Electrical (ASLA credit)
  • Global Specialty Contractors Scrim pool (ASLA credit)
  • Landscape Forms Custom site furnishings (ASLA credit)
  • Merit Contracting Waterproofing (ASLA credit)
  • New Line Mechanical Mechanical (ASLA credit)
  • Quarra Stone Company Fabrication, A Song for Water (the artist's studio)
  • CD Tile & Stone Contractor for the 2025 paver changes (KTTC)

Sources for this page

  1. American Society of Landscape Architects, Heart of the City: Art and Equity in Process and Place (2023 ASLA Professional Awards)
  2. Landezine International Landscape Award, Heart of the City (LILA entry)
  3. Ann Hamilton Studio, A Song for Water (2022)
  4. Med City Beat, Peace Plaza to get a makeover (21 May 2019)
  5. Post Bulletin, 6 things to know about Heart of the City plans (18 May 2019)
  6. Post Bulletin, Does Heart of the City upgrade meet community needs? DMC EDA is preparing to ask (4 November 2021)
  7. KTTC, Heated roadway and walkway melts snow in downtown Rochester (6 January 2022)
  8. KROC News, Public Commemoration Event For Rochester's New Peace Plaza (17 May 2022)
  9. Post Bulletin, Peace Plaza paver adjustment plan raises concern for Rochester council (10 February 2025)
  10. KTTC, Rochester City Council discusses Peace Plaza improvement plans (10 February 2025)
  11. Post Bulletin, Peace Plaza paver plan moves forward with desire to do more (20 February 2025)
  12. KROC News, Rochester City Council Approves Plan for Peace Plaza Paver Fix (20 February 2025)
  13. KTTC, Work starts on Peace Plaza paver improvements (14 July 2025)
  14. KROC News, Rochester City Council to Consider Peace Plaza Paver Problem Fix (6 February 2025)
  15. Post Bulletin, 7 takeaways from Rochester City Council's downtown walking tour (11 May 2026)
  16. Post Bulletin, Paver problems prompt added $334K expense (27 May 2026)
  17. Post Bulletin, Solution to Peace Plaza paver issues still in the works (8 October 2024)
  18. KTTC, Work continues on resetting Peace Plaza pavers, city looks to future solutions (15 November 2024)

Researched on 2026-11-25 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.

The question it brings · interpretation

When text is part of a walking surface, who tests it at full scale, over what seasons, and who decides what changes if people report difficulty crossing it?

Each question is Field Method’s interpretation, not a claim made by the source.

The date

2023: ASLA Professional Awards, Award of Excellence, Urban Design; the year of this entry is the award year. Design: Coen+Partners' award entry to Landezine gives design year 2020; plans were already public in 2019. Construction: 2020 (KROC News and Post Bulletin). Opening: May 2022 (ASLA); a public commemoration was set for 18 May 2022. Resetting of settled pavers was reported in November 2024; changes to lettered paving began in July 2025.