ProjectWater, climate and policy

2024

Xochimilco Ecological Park

Grupo de Diseño Urbano (Mario Schjetnan), for the Mexico City government · Xochimilco, Mexico City, Mexico

A 1993 public park with lakes and wetlands beside Xochimilco's chinampa farmland. It formed part of a government rescue plan that also expropriated ejido land. A later rehabilitation followed a period of decline.

Recognised in 2024

The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.

How it came about and changed

  1. Before the park

    The chinampa farm system of Xochimilco is far older than the park; the separate entry on the chinampas covers it. On 11 December 1987, before the park was built, Xochimilco entered the World Heritage List as part of the property Historic Centre of Mexico City and Xochimilco. The listing is not recognition of the park's design, and no source read shows whether the park lies inside the listed boundary. A 2006 official programme says the springs were exhausted, clean water to canals and lakes stopped, and treated wastewater was supplied instead. It also links groundwater extraction to consolidation and subsidence of the ground, and names differential subsidence among causes of the protected area's continuing deterioration. It reports that in some places canal closures and related changes left water with little or no movement, raising pollution and rainy-season flooding. These statements concern the wider system; no park-specific subsidence data were read.35

  2. 1989

    The Federal District government published the Plan de Rescate Ecológico de Xochimilco. The 2006 programme gives its aims as reversing ecological damage linked to overpumping of aquifers, encouraging farm production and adding green and recreation space. It also records aims of improving chinampa farmland, increasing aquifer recharge and building land reserves. Two presidential decrees published on 21 November expropriated about 780.57 hectares from the Xochimilco ejido and 257.58 hectares from the San Gregorio Atlapulco ejido (about 1,038 hectares) for the Federal District, on public-utility grounds. This land is not all park.3

  3. 1989

    A 2019 university article reports that residents did not welcome the proposed taking of ejido land for water treatment plants and put forward an alternative ejido plan. It says they held the expropriation to be unnecessary but backed several government proposals and offered to cooperate. As the article reports it, they argued that expropriation would sideline the local community, which was the most affected by the problem and had done most of the rescue work, and that government could instead work by agreement with the ejido communities. The ejido plan proposed other water and farming measures, including a perimeter canal. No first-hand account by ejido members was read.4

  4. 1990–1993

    The park, designed by Grupo de Diseño Urbano for the city, was built from 1990 to 1993. The Anillo Periférico highway divides the work: a plant and flower market and sports park to the north, and the ecological park with the Huetzalin and Acitlalin lakes to the south, next to the chinampa area. A Harvard project page describes a wider 3,000-hectare programme with water works, farmland recovery and heritage work; those results are not the park's alone.617

  5. 1993

    The park opened. As design, the Cultural Landscape Foundation describes two artificial lakes, wetlands and canals that collect stormwater, a visitor centre, a spiral water tower, and seven aqueducts that cascade treated water into the western lake. The sources read do not give the treatment level or quality of this water, its flow into the lake, or whether the cascades run today. ASLA's project text says the main axis points to mountains and hills held sacred before the Spanish conquest. This describes the design, not measured performance.16

  6. 1992–1994

    A 1992 federal decree declared a protected natural area, Ejidos de Xochimilco y San Gregorio Atlapulco, given as 2,657 hectares. The 2006 programme records two restitutions on the Xochimilco ejido side as carried out, under decrees authorising free transfers: about 53 hectares for housing, to affected people recognised by the Secretaría de la Reforma Agraria (1992); and about 204 hectares, in undivided co-ownership in equal shares, only for farming, to former ejido members affected in 1989 (1994). A 75-hectare return to the San Gregorio Atlapulco ejido, also authorised in 1994, had not been carried out by the time of the programme. Its later status and any cash compensation were not found. A 1993 decree expropriated a further 66 hectares to enlarge a nursery, about 38 of them in the protected area. The programme says the expropriations remained subject to future restitutions to those affected.3

  7. 2004

    ASLA's project text records that Xochimilco's wetlands were added to the Ramsar list of wetlands of international importance. This concerns the wetlands and is not recognition of the park's design.1

  8. 2006

    The official management programme put the park at 215 hectares, with 96 used for recreation, run by the Patronato del Parque Ecológico de Xochimilco, a civil association, under a revocable temporary permit issued in 1993. For the wider protected area, it said canals and lagoons were fed with treated wastewater. It cited a 1981 study, older than the park, for high faecal coliform records above permitted levels, and a 2003 study for bacteria showing faecal contamination. Citing 1999 and 2003 work, it linked coliforms in areas without settlements to manure used on chinampas. It gives these citation years, not sampling dates. It also listed illegal sewage discharges, farm chemicals and solid waste among pollution sources. None of this shows present conditions, and these are not test results for the park's two lakes.3

  9. Before 2019

    ASLA's project text says the park had deteriorated in recent years and needed extensive rehabilitation; it gives no cause. In July 2020 El Universal quoted the head of the city government, Claudia Sheinbaum, saying that the park had been privatised and that the city had recovered it. On 26 July 2021 Expansión Política quoted Sheinbaum as saying that admission had been charged for many years, that a group had taken over the park and put it to practically private use, and that the city had therefore deprivatised it as a free, public space. This is the city government’s account; no response from the Patronato or any earlier operator was found, and no source read ties these statements to the 1993 permit.1912

  10. 2019–2021

    The designers' accounts report desilting and reshaping aimed at restoring lakes and wetlands, more than 1,500 new trees, health treatment for about 20% of roughly 25,000 trees, a teaching chinampa, longer running and cycling routes and new family areas. The firm's newsletter says new irrigation uses recycled water from the Cerro de la Estrella plant. The firm's newsletter, which has no printed date (the PDF file was created on 29 May 2023), gave progress to date as 30 hectares recovered of the 50.1-hectare Huetzalin lake, all 2.54 hectares of Acitlalin and more than 10 hectares of wetlands. No final figures were found; these areas are not measured ecological results. The Cultural Landscape Foundation, giving the period as 2010–2021, says the firm improved water quality; no sampling dates or measurements supporting this were found.186

  11. 2020–2021

    A road bridge at Cuemanco brought a separate dispute over a wetland in the protected area. A coalition of Xochimilco communities said it broke the area's management programme and their right to be consulted; the city said it would improve movement and include wetland recovery. In July 2020 Chilango quoted the city's public works secretary, Jesús Esteva, calling the wetland artificial, planted when the Periférico was built; in April 2021 Expansión Política quoted Sheinbaum describing an artificial wetland created in the 1990s. The September 2021 report on the opening says a restored wetland under the road bridge was shown. Courts halted work for a time. The bridge opened to traffic in September 2021. The reports read on the bridge do not state an effect on the park, and the final outcome of the legal case was not found.131514

  12. 2021

    The city presented the rehabilitated park on 18 July 2021. El Universal reported that during the tour a group of neighbours shouted “Presidenta”, while another group complained to the head of the city government about the Cuemanco bridge and said that a wetland in the area had not been recovered.11

  13. 2024

    ASLA gave the park its Landmark Award, for work completed 15 to 50 years earlier that keeps its design integrity and benefits its community. The page read gives no jury statement on this project. ASLA's announcement gives 2.5 million visitors a year, and its project text says the park has recovered and is heavily used. No survey or ecological monitoring behind these statements was read.21

Approvals and legal steps

  • 1992 and 1994 Presidential decrees published on 16 November 1992 and 20 July 1994 authorised free transfers of land: two on the Xochimilco ejido side and one to the San Gregorio Atlapulco ejido, which the 2006 programme says had not been carried out.3
  • 1993 A revocable temporary administrative permit for the park's administration by its Patronato.3
  • 2006 The management programme of the protected area was approved; the approving agreement appears in the city's official gazette of 11 January.3

No design, building or environmental permit for the 1990–1993 park or the 2019–2021 works was found. The transfer decrees were read as summarised in the 2006 gazette, not in their original texts.

Funding

  • 1989–1993 A Harvard project page gives a budget of $400 million for 1989–1993 on a page about a 3,000-hectare project. It does not state the currency or what the sum covers, so it is not a park cost. It says the Overseas Economic Cooperation Fund assisted reforestation, with no amount.7
  • 2019 First rehabilitation stage: 103 million pesos, as reported in July 2020 from a city government briefing.109
  • 2020 Second stage, announced in July 2020: about 81 million pesos (Chilango gives 81.2 million, for general maintenance of 30 hectares). El Universal gave 182 million pesos as the park total then.109
  • 2021 On 18 July 2021 El Universal reported 184.9 million pesos for the park's two rehabilitation stages.11

These are press reports of government figures; no audited account was read. The shares of funding sources and the cost of the 1993 park alone were not found. VAT treatment is not stated.

People

  • Mario Schjetnan Garduño Landscape architecture; founder of Grupo de Diseño Urbano
  • Grupo de Diseño Urbano S.C. Design firm for the park; took part in the rehabilitation
  • Government of Mexico City (in 1989, the Federal District Department, with the Delegación Xochimilco) Client; rescue plan
  • Public Works Departments and Department of Hydraulic Resources of Mexico City Organisations listed on Harvard's page for the wider District of Xochimilco project
  • Secretaría del Medio Ambiente Management, monitoring and control (ASLA credit)
  • Tania Carro, Directorate of Urban Services, Public Works Secretariat Directed the rehabilitation (firm's newsletter)
  • Marco Arturo González and Jessica Navarrete Rehabilitation team, Grupo de Diseño Urbano
  • Luis Palacios Artist, Adventitious Garden
  • Patronato del Parque Ecológico de Xochimilco, A.C. Park administrator under the 1993 permit, as recorded in 2006
  • Ejidos of Xochimilco and San Gregorio Atlapulco Ejidos from which land was expropriated in 1989; some later transfers recorded

Sources for this page

  1. ASLA, Xochimilco Ecological Park (2024 Professional Awards, Landmark Award)
  2. ASLA, Xochimilco Ecological Park in Mexico City, Mexico Wins Landmark Award from ASLA (4 September 2024)
  3. Gaceta Oficial del Distrito Federal (CONANP copy), Programa de Manejo, Área Natural Protegida Ejidos de Xochimilco y San Gregorio Atlapulco (11 January 2006)
  4. Universidad de Guadalajara, Análisis social y ambiental de los programas de rescate en Xochimilco, by A. Azamar Alonso, S. Solís Tepexpa and G. González Gallardo (Expresión Económica 43, 2019)
  5. ICOMOS, Heritage at Risk 2001: Mexico
  6. The Cultural Landscape Foundation, Xochimilco Ecological Park
  7. Harvard Graduate School of Design, District of Xochimilco (Veronica Rudge Green Prize in Urban Design, 1996)
  8. Grupo de Diseño Urbano, Newsletter: Integral Rehabilitation of Parque Ecológico Xochimilco
  9. El Universal, Report on the second rehabilitation stage and investment (26 July 2020)
  10. Chilango, Report on the rehabilitation of the park (26 July 2020)
  11. El Universal, Report on the supervision of the rehabilitated park (18 July 2021)
  12. Expansión Política, Parque Ecológico Xochimilco abre al público tras rehabilitación de 80 hectáreas (26 July 2021)
  13. Expansión Política, Report on the dispute over the Cuemanco bridge (25 April 2021)
  14. Chilango, Report on the opening of the Cuemanco bridge (2 September 2021)
  15. Chilango, ¿Y el humedal? Juez autoriza puente vehicular en Cuemanco (17 July 2020)

Researched on 2026-11-25 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.

The question it brings · interpretation

Whose land was expropriated under the wider rescue plan, how did they respond, what was returned, and how much of it concerns the park?

Each question is Field Method’s interpretation, not a claim made by the source.

The date

2024: ASLA Landmark Award, announced on 4 September 2024; the year of this entry is the award year. The park was built from 1990 to 1993 (TCLF) and opened in 1993 (ASLA). ASLA's project text dates an integral rehabilitation to 2019–2020; the city presented the rehabilitated park in July 2021.

Checked against

See it on the timeline