Urban Ecological Sanctuary (Benjakitti Forest Park)

Arsomsilp Community and Environmental Architect and Turenscape, design firms (the WAF catalogue title block names Turenscape only; ArchitectureNow, 6 December 2023, credits both); built by the Royal Thai Army; Treasury Department land · Khlong Toei, Bangkok, Thailand

A wetland forest park on former tobacco factory land in Bangkok. Its design stores rainwater and treats canal water; later accounts report water-system problems and little performance evidence.

Recognised in 2023

The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.

How it came about and changed

  1. 1991–2016

    The land was a Tobacco Factory site belonging to the Treasury Department. A Thai account dates the policy to return about 450 rai (72 ha) for a public park to 1991. The pond park came first. A first forest-park phase of 61 rai (about 9.8 ha) was finished in 2016; An Architectural Review article, reposted by Turenscape, says the army designed and built it as a conventional park with orthogonal geometry.10913118

  2. 2019–2020

    A 2019 design competition covered the later phases, which Arsomsilp Community and Environmental Architect won, working with Turenscape according to The Architectural Review. On 26 October 2020 the Treasury Department and the Royal Thai Army signed a memorandum for phases 2 and 3: about 131 and 128 rai, 259 rai in all (about 41.4 ha), with the army to build.81011

  3. Design

    Turenscape's account of design and works, not checked against as-built records: three constructed wetlands with many small islands, shaped by cut and fill with no earth brought in or taken out; reused demolition concrete; loosened hard clay; reused factory buildings; boardwalks and a skywalk. No infiltration or soil test was read. The journal paper, co-written by a designer of the park and not an independent evaluation, links the raised tree mounds to Central Plain raised-bed orchards and describes repeated round mounds as a practical construction module.59

  4. Water: design figures

    The design draws water from Khlong Phai Singto, the canal to the north, through treatment wetlands to ponds. As design claims, Turenscape gives about 8,152 m³ treated a day, from grade V to grade III (standard and test parameters not stated), and projected monsoon storage of up to 200,000 m³. The journal paper says about 1,600 m³ of wastewater can be treated, particularly in the dry season, without stating a time period, and gives 128,000 m³ of wetland storage. No measurement data accompany these figures. The paper also reports canal biochemical oxygen demand (BOD) of 24.5 to 37.2 mg/L for 2017–2021, citing the city drainage department; these are canal values, not park outflow.5910

  5. 2020–2022

    Construction ran on a short programme; the journal paper says it was limited to 18 months. An April 2021 report set two work stages, November 2020 to June 2021 and July 2021 to February 2022. Reports of a 17 December 2021 handover, from the army through the Treasury Department to the city, say a first construction area of about 160 rai was complete, with other work due by April 2022. A 2023 report of the cabinet briefing dates completion of phases 2 and 3 to December 2021 and official opening to 3 August 2022. Turenscape gives March 2022 as the build date. None of these dates shows that the water system was complete or tested; the journal paper later reports missing water infrastructure after opening.9121351819

  6. Planting

    The journal paper says existing trees were deliberately kept, seedlings were favoured, some mature trees were transplanted, and planting was organised in seven zones; it gives a figure of 5,600 small trees planted, not checked as an as-built count. Turenscape says all existing trees were kept. A March 2022 Thai design account instead says some old factory trees that were decayed and could be hazardous were removed, healthy ones were kept, and about 20% of planting used transplanted trees as nurse trees.9510

  7. January 2023

    Complaints followed about dried planting on the wetland islands and foul water. MGR Online reported army volunteers watering and city agencies adding pumping. It quoted an earlier post by the admin of a park Facebook page, not identified as official, which attributed wilting to the dry season, cited lower inflow, evaporation and plant uptake, and said the foul water was consistent with a design that takes community wastewater for natural treatment. This was not an engineering finding, and no water test was reported. The Nation reported on 17 January 2023 that Governor Chadchart Sittipunt said a private company had been hired to take care of the park, and that officials were working with the Army's Maintenance Engineering Department, which built the park, on short- and long-term plans to secure water for plants, especially in drought. In ThaiPublica's account of 4 February 2023, the governor's adviser said the city had not been told of the problem beforehand, and its inspection indicated that trees may have gone nearly a month without watering. No response from the care company was found in the sources read.161714

  8. February 2023

    In a ThaiPublica article of 4 February 2023, Bangkok governor's adviser Attaseth Petchmeesri is quoted as saying the city had not been involved in the project from the start; that the ponds leaked, so water was being added; and that there were 15 to 20 leak points. The adviser said the city had sealed leaks temporarily and had talked with the army about repairing them, and that the army would then make a permanent repair. Separately, the article's own narration says the construction contract had a two-year warranty for repairing faults, and that some water ran back to the canal. No statement from the army or a contractor, and no independent diagnosis, was found in the sources read or, for an army statement, in one further Thai web search on 25 November 2026; the cause of the leaks is not established here.14

  9. January 2024

    Reporting on a deputy governor's site visit described an undersized pump, many underground leaks that could not all be sealed, a small supply pipe from the large pond that crossed a road and could not pump continuously, and canal water at times too saline. Three measures were set out: a larger intake pump to offset leakage; switching a second pump, which the report says was designed to pump water out against flooding, to bring canal water in, with a larger holding pond; and a pump house with a larger buried pipe from the large pond. The switch followed an account that ponds and wetland stored water well in prolonged heavy rain, which is not monitoring; the wording leaves open whether it had been made. The deputy governor asked city departments to coordinate and consider the measures. No report of their completion, or of how flood discharge would be handled, was found.15

  10. 2024–2025

    A paper co-written by Arsomsilp's landscape architect, accepted in September 2024, says the planned pumping station was absent and that water systems needed reconnecting and the treatment wetland's flow redesigning after talks among agencies, which might affect wetland performance and pond water quality. It says treatment performance needs study, no data yet prove park performance, long-term maintenance questions are open, and monitoring and management guidance are needed. The city's Environment Department manages the landscape. The paper does not mention leaks.9

  11. Reported results

    The ASLA project account says the wetland performs well and supplies enough water to survive the dry season, and Turenscape says the planting needs little dry-season irrigation or maintenance. No data or measurement dates were found with either claim. Reports from 2023 and 2024 describe emergency watering and water-supply problems. Turenscape and the ASLA project account say that in an unspecified last summer the park and its immediate vicinity did not flood while much of Bangkok did; no rainfall, level or discharge data were given, and this does not show that the park prevented flooding. It also says wildlife has arrived. The paper says biodiversity gain is observed and monitored and new species have been found since 2022, naming birds including the Asian openbill and spotted owlet and calling for fuller food-web study; it presents no survey method or baseline that would let a gain be measured.659

  12. Award

    The WAF 2023 catalogue names Turenscape alone on the title block for Urban Ecological Sanctuary, Bangkok, Landscape of the Year 2023; its text identifies Benjakitti Forest Park. The facing page carries what appears to be a picture credit naming Turenscape and Arsomsilp. ArchitectureNow's report of the WAF results, 6 December 2023, credits both firms for the Landscape of the Year win. No jury statement of reasons was read.1234

Approvals and legal steps

  • 1997 Cabinet resolution of 27 May 1997: the Finance Ministry could use Tobacco Factory state revenue to build Benjakitti Park, in water-park and forest-park parts, with leftover money returned.13
  • 2016 Cabinet resolution of 8 March 2016 approved the forest park project in principle, in three phases, with a construction budget of 950 million baht.13
  • 2020 ThaiPublica cites a cabinet resolution of 29 September 2020 setting 950 million baht for three phases of the park. The resolution itself was not read.14

These are cabinet-level budget and project approvals as reported; no resolution text, building permit or environmental approval was read. The 2020 memorandum is an agreement, and the 2023 cabinet item an acknowledgement of completion, so neither is listed.

Funding

  • 2016 950 million baht approved by cabinet as the forest park construction budget, three phases. A ceiling, not reported spending.13
  • 2020 652 million baht stated for design and construction work on phases 2 and 3 (259 rai) at the Treasury–army memorandum; the report lists demolition, design, project consultant and construction. A February 2023 report gives 652.53 million baht.1114
  • 2021 Thairath reported a 950 million baht ceiling for the whole forest park, paid for with Tobacco Authority of Thailand support.12
  • 2023 The Standard reported that the Treasury Department had returned 3,250,281.53 baht of leftover project money to the Finance Ministry. Final total spending was not stated.13

Entries overlap and should not be added. Amounts are in Thai baht as reported on the date shown. No final account, design fee or maintenance budget was read.

People

  • Arsomsilp Community and Environmental Architect Design firm and competition winner; credited as landscape architect (ArchDaily) and local associate firm (ASLA). The journal paper co-written by Chatchanin Sung identifies Sung as lead landscape architect. The Thai design account presents Sung (landscape architect) and Phrommanat Amatyakul (พรหมมนัส อมาตยกุล, architect) as representing the Arsomsilp design team
  • Turenscape (Kongjian Yu) Design firm; WAF title-block credit. Described as masterplan collaborator and joint sports-centre designer (AR repost), design consultant (ArchDaily), wetland adviser, Yu (Thai account), and lead landscape architect, Yu (ASLA). No contract split or design institute of record found
  • Treasury Department, Ministry of Finance Landowner and project agency; Turenscape and ASLA name the Finance Ministry as client
  • Tobacco Authority of Thailand Reported supporter of construction costs
  • Royal Thai Army Builder under agreement with the Treasury Department; sources name the 1st Development Division, and ThaiPublica an army engineering unit
  • Stonehenge Inter Construction manager (ArchDaily, ASLA); Thairath calls it designer and project management consultant
  • Kasem Design and Consultant Structural engineer, as credited
  • Optimology Mechanical and electrical engineering, as credited
  • Thawee Techasitsuebpong Water engineer, named among advisers and specialists in the Thai design account
  • Advisers from the Laem Phak Bia royal-initiative project Named as advisers in the Thai design account's treatment-wetland passage, working with Thawee Techasitsuebpong's team
  • Center of Excellence in Universal Design, Chulalongkorn University Universal design, as credited by ASLA; no access audit read
  • Plan Motif Signage design, as credited by ASLA, whose list also names further Turenscape team members and 12 consultants not all listed here
  • Bangkok Metropolitan Administration Manages the park after handover; its Environment Department runs landscape management

Sources for this page

  1. World Architecture Festival (flipbook hosted by emap), 2023 Winners Catalogue, page 24 (page text data): Landscape of the Year 2023
  2. World Architecture Festival (flipbook hosted by emap), 2023 Winners Catalogue, page 25 (page text data)
  3. World Architecture Festival, Winners Catalogues
  4. ArchitectureNow, WAF 2023: World Building of the Year and category winners announced
  5. Turenscape, Benjakitti Forest Park
  6. American Society of Landscape Architects, Benjakitti Forest Park, 2024 ASLA Professional Awards
  7. ArchDaily, Benjakitti Forest Park / Turenscape + Arsomsilp
  8. Turenscape, City lungs: Benjakitti Park (The Architectural Review article, reposted)
  9. Journal of Architectural/Planning Research and Studies 22(2), Likitswat and Sung, Implementing Nature-based Solutions: Learning from Benchakitti Forest Park in Bangkok (2025); second author is at Arsomsilp
  10. Dsign Something, Benjakitti forest park (in Thai), 29 March 2022
  11. Green Network, Treasury Department and army, forest park phases 2–3 (in Thai), 2020
  12. Thairath, Benjakitti phases 2–3 progress (in Thai), April 2021
  13. THE STANDARD, Cabinet told Benjakitti forest park is complete (in Thai), 27 June 2023
  14. ThaiPublica, Bangkok adviser on the dry-grass and water complaints (in Thai), 4 February 2023
  15. Thansettakij, Bangkok's three water options for the forest park (in Thai), January 2024
  16. MGR Online, Army volunteers water the forest park (in Thai), 13 January 2023
  17. The Nation (Thailand), ‘Benchakitti not a golf course’, says Bangkok governor as park trees wilt
  18. Bangkokbiznews, Handover of Benjakitti forest park (in Thai), December 2021
  19. The Active, Thai PBS, Prime Minister reviews Benjakitti forest park progress (in Thai), 17 December 2021

Researched on 2026-11-25 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.

The question it brings · interpretation

When a treatment wetland depends on pumps, a canal supply and several agencies, what should be shown and accepted before handover, and who keeps measuring it afterwards?

Each question is Field Method’s interpretation, not a claim made by the source.

The date

2023: World Architecture Festival, Landscape of the Year; the year of this entry is the award year. Phase 1 dates to 2016. Phases 2–3: design competition 2019; army construction agreement 26 October 2020; a June 2023 report dates completion to December 2021 and opening to 3 August 2022; December 2021 reports describe a partial handover; water-system commissioning not shown. Turenscape gives March 2022 as the build date.