The Park, recreational area Butzenbüel at Zurich Airport
Studio Vulkan with Robin Winogrond, for Flughafen Zürich AG · Kloten, Switzerland
A park opened in 2020 on a forested, partly protected hill beside Zurich Airport. Studio Vulkan with Robin Winogrond designed a ringed forest clearing, paths and walls showing moraine gravel, and a summit platform with water and mist.
Recognised in 2021
- 2021 Landezine International Landscape Award (LILA): Ex-Aequo Winner in Public Landscapes (shared with Quays of the River Schelde, Sint-Andries en Zuid, Antwerp)
The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.
How it came about and changed
- 1960s–2016
The Butzenbüel is a hill beside Zurich Airport. Project text on LILA's page, set apart from the award statement and with no author label, says motorway excavation was dumped on it in the 1960s, and that in the 1970s it was landscaped with forest, meadows and wetlands and placed under nature conservation. A design-team account describes glacial moraine, highway spoil heaped into abstract forms, and later compensatory planting that was then protected. Neither is treated here as independent confirmation of the other. The 2018 cantonal decision calls it a hill heaped up with excavated material, about 8.5 ha in all, with 3.46 ha of forest.173
- 2016
Flughafen Zürich AG, which a Kloten council paper names as owner of the park land, ran a commissioned-study procedure (Studienauftragsverfahren). The City Council later wrote that Studio Vulkan's winning scheme stood out for its closeness to nature and for fitting recreation with forest and nature protection: its view of a design. Existing plants and animals were surveyed in 2016; the 2017 habitat report cites the results, dated 9 November 2016, by SKK Landschaftsarchitekten and Orniplan AG.485
- 2016–2020
Studio Vulkan describes two new main paths, developed from the existing route network, that connect the entrances; a circular forest clearing; and a hill layered from moraine through forest to a shaped top with a thin sheet of water and mist nozzles. Moraine gravel shows in paths and walls, an inclined lift extends the escalators, and seven vegetation zones differ in density and species. A designers' account says keeping the tree ring legible takes continuing maintenance. A design-team account labels the tree ring 200-meter and the Sky Platform 30-meter, without saying there what is measured, and describes planting that answers erratic soils, from poorly draining clay to fast-draining gravel and uneven organic ground. These are designers' descriptions. The 2018 decision says the main paths (Skyloop) are to be made firm (befestigt) and the forest loop gravel-surfaced (chaussiert).6713
- 2017–2018
Kloten's municipal nature and landscape protection ordinance had to be changed for the park. Andreas Rotach, an ecologist on the project, told Hochparterre that when it began almost the whole hill was under nature or landscape protection (Natur- oder Landschaftsschutz). The canton says the protected object, Butzenbüel no. 542, was amended in early 2018, newly designating nature protection zone I. The annex posted by the city, which shows no date, lists one nature protection zone and enters no special protection measures. It allows non-native trees for the central tree ring if the cantonal forest division agrees to the species. It says the duty to keep to paths (Wegegebot) does not apply to those protected areas that are subject to forest law. It provides for a care plan, with goals and measures reviewed periodically. Rules for meadows and wet areas, the main ordinance's provisions and current site rules are not established here.835
- 2017
A report by OePlan for Flughafen Zürich AG, dated 5 December 2017, plans 248.5 ares (about 2.5 ha) of habitat in zone I: 95 ares existing and 153.5 to be upgraded by the project. The total is 125.6 ares of brome grassland (Trespenwiese; 76.7 upgraded), 72.4 of existing forest to become open forest, 34.7 of field copses, and 15.8 of wet meadow, fen, pond and bank vegetation. The upgraded figure is not all new habitat land: 149.1 ares of it are meadow, transitional and disturbed areas to become brome grassland (76.7) or existing forest to become open forest (72.4). Depending on site condition, planned grassland methods include topsoil removal, lean local substrate, transfer of cuttings and local seed. Open forest is to be made by thinning the tree layer and planting single trees and shrub groups; cover targets are 30 to 40 percent for trees, about 30 percent for shrubs and about 70 percent for the herb layer. The report calls the pond heavily silted, sporadically maintained and partly dry by early summer. It was to be enlarged and deepened; feeding it clean water from path drainage and the Sky Platform was still to be examined. These are plans and targets, not results.5
- 2017–2018
The OePlan report only outlines care, leaving detail to a care plan after the works. It plans yearly mowing of the wet meadow and some bank vegetation from 15 September; a hay cut on the brome grassland from 1 July; yearly cleaning (Säubern) of the open forest in late summer or autumn, with other periodic care; and re-dredging parts of the pond and a wet spot about every 5 to 10 years. In 2018 the canton added that an autumn cut of the grassland would very probably also be needed. These are plans, not records of care.53
- 2019–2023
A City Council motion to the town parliament (undated; 2019 inferred) says works had begun. The park would be reached only from the airport side, at The Circle, by an inclined lift and side entrances, with no direct link to Kloten's built-up area or town centre. It names event infrastructure and temporary catering, and says the park will serve recreation, sport and entertainment. It puts the town centre just under 1 km away in a straight line and says Flughafen Zürich AG welcomes a direct link. The City Council asked for CHF 325,000, including VAT and incidental costs, for a design competition for a footbridge over the A51 motorway. Saying the park was not designed for cycle use, it proposed a pedestrian-only bridge, with its approach on the national cycle route so that people with bicycles could also reach the park easily. With no design yet, it roughly estimated construction from area rates at CHF 2.9 million (simple) to CHF 4.8 million (extravagant), including 12% engineering fees. No decision on the request was found. The town's open-space concept of March 2023 still proposed examining better recreational and ecological links with the Holberg, for example by a suspension bridge; a wildlife bridge or motorway cover could also be examined with motorway works.414
- 2020
Reports differ on the opening date. A Nau.ch report dated Thursday 29 October 2020 said the airport park had been open since that day, after a media preview on the Wednesday. A Baublatt item of 28 October, credited to a press release, said the park would open with The Circle on 5 November. On 5 November 2020 HRS, total contractor for the neighbouring Circle complex, announced that the new airport park would open that day along with shops and restaurants. The exact date of public opening is not settled here. Studio Vulkan says the park opened to the public in 2020. A March 2021 trade article describes the funicular from The Circle to the park: an 80 m track rising 23 m, with room for 15 people, wheelchair-accessible, running without attendants, free and open to the whole population. It says the track is fenced to keep animals and people off it. The wheelchair statement concerns the funicular; step-free routes through the park were not established. The article names Von Rotz & Wiedemar AG as builder of the track structure and car, and Sisag AG for the controls.91011612
- 2021
LILA made the project an Ex-Aequo Winner in Public Landscapes. Its 2021 list gives the same level to the Quays of the River Schelde, Sint-Andries en Zuid, Antwerp, listed under Proap. The unsigned award statement describes a made hill and forest that, it says, are generally perceived as natural, and dwells on the ring of trees around an open clearing, a small polished-concrete viewing disc that refers to the moraine, fog that forms an artificial cloud, and playful hilltop experiences. It is an award judgement, not a measure of ecological or public performance. In a Hochparterre interview that February, Andreas Rotach, an ecologist on the project, said nature conservation and landscape architecture had worked together from the start.1285
- 2023–2024
The 2023 open-space concept says the park serves airport and Circle travellers and workers as well as Kloten residents, and that much of it is nature protection land. In its annual report for 2024, the local society Naturschutzverein Kloten says the remaking of the hill also upgraded the existing municipal nature areas. The forest is now tended as light woodland, with spreading bramble and scrub cut back hard, and many bee orchids flowered within a certain area. The society says Flughafen Zürich AG is obliged to carry out the care-plan measures that protect the orchids, and that the town has given the society the success check for this orchid. It adds that its orchid specialist surveyed the stock during the growing season and summarised the data in an annual report to the City of Kloten. The newsletter gives no counts, survey method, flowering date or baseline.1413
Approvals and legal steps
- 2018 10 October, forest clearance: the Canton of Zurich's coordinated decision BVV 18-1707 for the new park allowed clearance (Rodung) of 892 m², 141 m² of it permanently. Its reasoning says the inclined lift, needed for access suited to people with disabilities, lies partly on forest land and needs a clearance permit. It ordered 141 m² of afforestation for the permanent loss, due by 31 December 2023. Its reasoning also says the replacement area offered, farther east on the same parcel, was already wooded (bereits heute bestockt). The decision then states that the interest in clearance outweighs the interest in unrestricted forest conservation, that the project is bound to its site (Standortgebundenheit), that no overriding interests stand against it, and that the replacement afforestation offered can be accepted (kann angenommen werden). The extract does not explain the already-wooded remark further. The 751 m² cleared temporarily had to be restocked after construction. The canton also granted an exception permit under Art. 24 of the federal Spatial Planning Act (RPG); the decision gives the location as recreation zone and forest (Erholungszone / Wald). No objections had been filed to the published clearance request.3
- 2018 10 October, forest use: the decision classes the planned measures mostly as nachteilige Nutzung (literally detrimental use), a forest-law category; it says such uses are in principle not allowed but may be permitted by exception for important reasons. It describes, as planned, open-forest care and five recreation spots of 50 to 100 m² linked by trodden wood-chip paths. It says the cantonal forest division could agree to the design because recreation will play a dominant role in this forest. Conditions of the permit granted bar fencing the affected forest or extending the use to more forest. The reasoning also mentions main-path lighting, planned for safety reasons and to be designed to light only the path area, and an open event pavilion set 15 m back from the forest.3
- 2018 10 October, road: a state-road permit with conditions refused a new direct construction access from Butzenbüelring and required trees planned beside that road to be set back at least 4 m. Polluted site: the area affected by the works is entered in the register of polluted sites (Kataster der belasteten Standorte; entry VBS ZKlo-Ge-01.1). Citing two provisions of the Contaminated Sites Ordinance as alternatives, without saying which applies, the decision says that either no harmful or nuisance effects are to be expected at the site, or the federal defence department (VBS) has assessed it as needing neither monitoring nor remediation. The extract read does not say what is recorded, how far it extends or whether it relates to the motorway spoil. Consent required supervision by an authorised contaminated-sites firm, an excavation and disposal concept and a final report. Soil: stripped topsoil and subsoil had to be reused as soil.3
- 2018 10 October, funicular: the cantonal transport office permitted the concrete foundation only and left the funicular's building permit to a later procedure. The decision records a Federal Office of Transport letter of 2 May 2018: as the line is not run commercially, no passenger-transport concession was needed. It says such a cableway needs no federal plan approval but a cantonal permit, with technical assessment by an intercantonal control body (IKSS).3
- 2018 10 October, nature: consent required minimal lighting, warm-white LEDs of at most 3,000 K with wavelengths above 420 nm, and directional bollard lights, mounted as low as possible, along the forest loop. The application had not fixed park or lighting hours. The application's lighting concept also showed lighting on paths along protection zone I, which includes still waters. The canton called the habitat balance, inside and outside the zone, comprehensible and correct. Only module A of a three-module method had been applied, without showing why the others could be left out; the canton did not ask for the missing information, expecting no significant change to the balance. Its forecast, from a nature-protection viewpoint and counting the project's measures and the requested condition, was that the project could probably be built in an environmentally compatible way (voraussichtlich umweltverträglich).3
- 2018 23 October: Kloten's City Council granted the building permit, as reported in its later footbridge paper. The permit itself was not read.4
The sources read do not show whether the 2018 conditions were met, including the planting due by the end of 2023 and the polluted-site final report, or whether anyone appealed. The later funicular permit and the resolution changing the nature ordinance were not read. No source read shows whether any aviation approval or check, for example of bird hazards or heights, applied to the park. This is a gap, not a finding that one was required or missing.
Funding
- 2019 The City Council paper says Flughafen Zürich AG is investing about CHF 15 million in remodelling the park, with works under way. It does not state what the sum covers or whether it includes VAT.4
- 2021 Hochparterre's project credits of 8 February 2021 give a cost of CHF 15 million, with no basis or breakdown.8
The two mentions of CHF 15 million are not a final account. No breakdown or public contribution to the park was found, and it is not stated whether the sum includes the funicular or habitat work. The footbridge study credit and construction estimate concern a separate proposed crossing and are not park funding.
People
- Studio Vulkan Landscape architecture; general planning (Hochparterre credits); competition winner; project author in the cantonal decision
- Robin Winogrond Landscape architecture and urban design, with Studio Vulkan
- Flughafen Zürich AG Client, applicant and owner of the park land; investor
- OePlan GmbH (Andreas Rotach, project lead for the habitat report) Nature conservation
- BauSatz and Anders Busse Nielsen Forest
- René Bertiller Open forest
- Ferrari Gartmann AG and Preisig AG Civil engineers
- Mosimann & Partner AG Electrical engineers
- JML Water technology and water-feature design
- TT Licht Lighting design
- Winfried Schneider Product Design Objects (Studio Vulkan's credit); pavilion architecture (Hochparterre's credit)
- INCHfurniture (Inch Furniture) Furniture, with Luis Bischoff (Studio Vulkan); seating elements (Hochparterre); urban equipment manufacturer (LILA)
- Dr. Heinrich Jäckli AG Contaminated-sites adviser engaged by the client
- Von Rotz & Wiedemar AG Funicular track structure and car
- Sisag AG Funicular controls
- Canton of Zurich, Baudirektion Coordinated cantonal decision
- City of Kloten Building permit, nature protection ordinance
- Naturschutzverein Kloten Bee orchid success check, as the society reports
Sources for this page
- Landezine International Landscape Award (LILA), The Park, recreational area Butzenbüel at Zurich Airport
- Landezine International Landscape Award (LILA), 2021 Recognitions
- Canton of Zurich, Baudirektion, Leitstelle für Baubewilligungen, Gesamtverfügung BVV 18-1707, Neubau Parkanlage, Kloten (10 October 2018; extract)
- City Council of Kloten, The Circle: Fussgängerbrücke zum Park, Planungskredit (GR Vorlage 1952; undated, 2019 inferred)
- City of Kloten; report by OePlan for Flughafen Zürich AG, Naturschutzobjekt Butzenbüel (Nr. 542): ordinance annex and Objektbeschrieb (report dated 5 December 2017)
- Studio Vulkan, The Park, Butzenbüel, Zurich Airport (project page)
- urbanNext (design-team account), Sky as Ground: Reframing Ecologies at Zurich Airport Park (14 October 2025)
- Hochparterre, Wenn alle nur noch über die Wiese laufen, haben wir ein Problem (8 February 2021), by Roderick Hönig
- HRS, The Circle opens its doors (5 November 2020)
- Nau.ch, Flughafenpark auf dem Butzenbüel ist eröffnet (29 October 2020), by Jan Siegrist
- Baublatt (credited mgt/pb), Neuer Flughafenpark bei «The Circle» wird im November eröffnet (28 October 2020)
- VTK/UCT, Eine Standseilbahn für den grossen «The Circle», by Damian Bumann (VTK/UCT 175, March 2021)
- Naturschutzverein Kloten, Mitteilungen, February 2025, with the annual report for 2024
- City of Kloten (copy hosted by Kausal Watch), Freiraumkonzept Kloten: Erläuterungsbericht, Analyse und Konzept (13 March 2023), by SKK Landschaftsarchitekten
Researched on 2026-11-25 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.
The question it brings · interpretation
What would the post-works care plan and repeat surveys, compared with the 2016 baseline, show about whether the planned grassland, wet areas and open forest were established and have lasted under public use?
Each question is Field Method’s interpretation, not a claim made by the source.
The date
2021: LILA Ex-Aequo Winner in Public Landscapes (LILA project page and 2021 list; no announcement date found on either); the year of this entry is the award year. Competition: commissioned-study procedure (Studienauftrag) 2016 (Kloten council paper, Hochparterre); Studio Vulkan's page also says it won in 2017. Permits: 10 October 2018 (canton) and 23 October 2018 (city, as the council paper reports). Build: LILA gives year built 2017–2021 and also tags the project Built in 2020; Studio Vulkan gives realisation 2017–2021. Opening: Nau.ch reported on Thursday 29 October 2020 that the park had opened to visitors that day, after a media preview the day before; Baublatt (28 October) and HRS (5 November) give 5 November 2020, with The Circle; Studio Vulkan says it opened to the public in 2020. The exact public opening date is not settled.
Checked against
- Landezine International Landscape Award (LILA), The Park, recreational area Butzenbüel at Zurich Airport
- Landezine International Landscape Award (LILA), 2021 Recognitions
- Canton of Zurich, Baudirektion, Leitstelle für Baubewilligungen, Gesamtverfügung BVV 18-1707, Neubau Parkanlage, Kloten (10 October 2018; extract)
- City Council of Kloten, The Circle: Fussgängerbrücke zum Park, Planungskredit (GR Vorlage 1952; undated, 2019 inferred)
- City of Kloten; report by OePlan for Flughafen Zürich AG, Naturschutzobjekt Butzenbüel (Nr. 542): ordinance annex and Objektbeschrieb (report dated 5 December 2017)
- Studio Vulkan, The Park, Butzenbüel, Zurich Airport (project page)
- urbanNext (design-team account), Sky as Ground: Reframing Ecologies at Zurich Airport Park (14 October 2025)
- Hochparterre, Wenn alle nur noch über die Wiese laufen, haben wir ein Problem (8 February 2021), by Roderick Hönig
- HRS, The Circle opens its doors (5 November 2020)
- Nau.ch, Flughafenpark auf dem Butzenbüel ist eröffnet (29 October 2020), by Jan Siegrist
- Baublatt (credited mgt/pb), Neuer Flughafenpark bei «The Circle» wird im November eröffnet (28 October 2020)
- VTK/UCT, Eine Standseilbahn für den grossen «The Circle», by Damian Bumann (VTK/UCT 175, March 2021)
- Naturschutzverein Kloten, Mitteilungen, February 2025, with the annual report for 2024
- City of Kloten (copy hosted by Kausal Watch), Freiraumkonzept Kloten: Erläuterungsbericht, Analyse und Konzept (13 March 2023), by SKK Landschaftsarchitekten