2021
Repairing the Rift: Ricardo Lara Linear Park
SWA Group (landscape architect and prime consultant), with a consultant team, for the City of Lynwood · Lynwood, California, United States
A five-block, 5.25-acre park beside Interstate 105 in Lynwood, on former residential lots cleared for the freeway. The design combines a walking path, play, dog and garden areas with hills, swales and detention basins.
Recognised in 2021
- 2021 ASLA Professional Awards (American Society of Landscape Architects): Award of Excellence, Urban Design
The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.
How it came about and changed
- 1972
Interstate 105, the Century Freeway, which The Wave calls the Glenn Anderson (105) Freeway, runs beside the park. A history by Southwestern law professor C. D. R. Cameron covers the whole corridor, not Lynwood alone. In February four couples in the planned route sued to halt work, joined by the City of Hawthorne and groups including the NAACP and the Sierra Club. In July Judge Harry Pregerson halted work by preliminary injunction until the government defendants met federal and state law. The article says the state highway agency was then carrying out a plan to buy and demolish nearly 7,000 housing units, displacing as many as 21,000 residents with low and middle incomes; 2,840 residences had been vacated by May. It quotes Pregerson naming Lynwood among places the freeway went through. Cameron discloses having clerked for the judge, holding the judge in deep personal affection and having been a director of Century Housing Corporation since April 2020.1413
- 1979–1995
The same history says a consent decree, final in 1979 and amended in 1981, provided for replacement housing and favoured local residents, women and minorities for project jobs and contracts. Under it, Caltrans agreed to address air and noise pollution through light rail, high-occupancy lanes, sound walls and below-grade sections. Construction resumed and ran from 1981; the freeway opened in October 1993. About 3,700 replacement units were planned when work resumed, about half the number of structures taken for the route; midway through construction only 1,300 were available. In 1995 Pregerson moved the housing programme to the new, private non-profit Century Housing Corporation. It and its predecessor eventually built 4,300 units in Greater Los Angeles, the article says.14
- Before 2015
A Landscape Architecture Foundation (LAF) case study says this mile was once residential lots, which were emptied and later cleared to make way for the freeway. Before the park, it says, the five blocks flooded easily, saw little use and served for dumping. The project narrative on ASLA's award page says the freeway ran straight through Lynwood and several more communities with Black and Hispanic majorities, and that neighbourhoods beside the corridor are still underserved.21
- 2010–2014
LAF dates community engagement from 2010, saying it then focused on a strong application for a Proposition 84 grant, and says many of the same residents were re-engaged around 2012 for a stormwater funding bid that did not succeed. ASLA's page says the design team partnered with the city in 2014. City-run workshops raised ideas including a walkway, an exercise station, a children's play area and a dog park, and residents' animal collages informed mosaics on tables and benches. From Lot to Spot is credited with outreach; LAF names Robin Brailsford as mosaic artist.21
- 2015
LAF says construction started in 2015, gives the same year for completion and says residents took part in a planting day. A ribbon cutting was held on 10 October 2015, according to Onward Engineering, which ASLA credits with construction management. Its post reports a unanimous City Council vote to name the park after Senator Ricardo Lara, and credits him with spearheading the park and securing the state grant. The naming resolution and vote date were not found. Urbanize LA reported in 2019 that the city opened the park in 2015.2617
- 2015 onward
The city's undated listing gives a one-mile walking trail spanning five blocks, two playgrounds, two dog parks, three exercise stations, a pavilion and a community garden with 20 beds. LAF also records public art, 10,000 sq ft of planted bioswales and flood retention basins, and irrigation with recycled water from a county plant. Its methods report says hills were designed to keep soil on site. This page gives no hauling-cost saving: the 2014 design estimate behind the report's figure still lists soil to haul off, and the researchers lacked final costs and could not verify that none left the site.1023
- 2021
ASLA gave the project an Award of Excellence in Urban Design. SWA's project page reproduces comments from the awards jury, which set the work against urban renewal decisions that put highways ahead of communities and refer to park access for more than 26,000 neighbours. That is an access figure, not a count of visitors.18
- 2021
ASLA's project narrative says the park is within 100 feet of the freeway and that a 10-foot sound wall along its entire length mitigates noise and airborne particles; the methods report puts a concrete block wall along most of it. Who built the wall, and whether it is a consent decree measure, was not found. SWA also says the park improves air quality. No measurement of particles or gases in the park, or test of freeway noise there, was found. This page makes no exposure or health finding; air quality questions belong with the responsible air agency. ASLA also reports more than 300 new trees. Its stormwater, pervious-area and canopy figures are left out because no method for them was found. No source read reports measured stormwater volume, water quality or canopy cover.1823
- 2021
A Cal Poly Pomona team studied the park from March to August 2021 in an LAF programme that pairs faculty-student teams with design practitioners to document project benefits. SWA, the designer, was the partner firm: one liaison searched construction documents, another mentored the team, and the firm gave access to equipment the team would not otherwise have had. One research assistant had been a community organiser during design. LAF's brief says SWA had an ongoing relationship with the city to develop landscape guidelines.32
- 2021
Thermal cameras read surfaces on 22 and 26 June, with an asphalt parking lot standing in for the earlier site, which the report also describes as vacant lots with asphalt road and barren dirt. In the 3 p.m. sun table, rubber play surfacing read the same as the asphalt and the other listed surfaces read lower. This page gives no cooling figure: the tables do not say which day they show, one printed shade difference does not match its own readings, and at 3 p.m. shaded mulch reads hotter than sunlit mulch. These are not air temperatures or before-and-after readings.32
- 2021
LAF says features acting as sound barriers cut noise from Fernwood Avenue in parts of the park. This page leaves out its decibel figure. In the summary table the largest difference is at a berm, with meters 45 feet apart; a concrete wall, with meters 17 feet apart, shows little or none. No correction for distance or comparison without a barrier is reported, traffic noise had eased by the last station, and several written figures differ from the table. The readings do not show on their own what a berm, wall or planting did. No test of freeway noise or the freeway wall is reported. Stormwater performance was not quantified; the team expected little chance to observe it after the rainy season.23
- 2021
The team collected 39 surveys in mid-2021, during the pandemic, leaving out first-time visitors. It was a convenience sample; two community leaders with close ties to the park helped by sharing the survey link and printed copies. Of 36 who answered, 31 agreed the park had noticeably changed the neighbourhood for the better; 33 of 38 reported more physical activity since it opened. These are self-reports with no survey from before the park. The study says use may have been lower because of COVID-19: the garden and dog park areas were locked at each site visit, and there were no community events.32
- 2021
LAF says concerns about use by people experiencing homelessness shaped some design decisions. It says the planned restroom was removed over concern that it would attract people experiencing homelessness, and that no drinking fountains were provided over concern that people would wash clothes in them. In 2021 the team saw a small informal settlement in the freeway right-of-way behind the park; LAF says surveyed residents expressed concern for their safety in the park because of this kind of informal use. Open survey comments also raised encampments and upkeep. These are respondents' views; no account from people living in the settlement was found.23
- 2021
LAF found the community garden largely unused, citing a tedious application process and a lack of programming or leadership; survey respondents also raised access and maintenance. SWA's October 2021 awards story instead says residents raise fresh produce there by the thousands of pounds, with no basis or period; the accounts are not reconciled. LAF also reports rubber playground surfacing that often matched the heat of the Fernwood Avenue asphalt; sages stripped of flowers when a site manager clipped them tightly in response to the community's safety and sightline concerns; damaged planks on recycled-material culvert bridges; and bronze history plaques no longer on site. To save money, younger trees were bought, with the count unchanged, and shrubs spaced farther apart. LAF said the trees were flourishing despite drought when it wrote; no survival data were found.239
- 2020–2022
A later bike-trail project involved the park itself. A March 2020 state notice placed it partly on Caltrans excess land beside I-105 and listed the park among its locations. It records a categorical exemption under CEQA, the state environmental review law (sections 15304(b) and (h); lead agency, California Natural Resources Agency; applicant, the city), not a construction permit. In July 2022 The Wave reported construction of a bikeway of about 1.5 miles that was to be joined into the linear park, mostly following the route of its mile-long walking path, on a strip Caltrans then administered; the city was to take it over for maintenance. A city notice of 8 December 2022 said the trail, running along the park, had opened the previous weekend, and listed landscaping, new trees, drinking fountains, lighting and traffic signs. The 2021 accounts above predate The Wave's report. No source read shows the park's later layout or whether those fountains are inside the park.121311
- 2026
At a community meeting on 17 November 2026, Metro reported that construction of the I-105 ExpressLanes in Segment 2, Central Avenue to I-710, which includes Lynwood, began in October 2026. Listed work includes new and rebuilt sound walls, most of them taller, and landscape and tree removal and restoration, with tree and vegetation removal starting late November or early December. An anticipated timeline in the same presentation shows sound wall demolition in late 2026 and reconstruction from summer 2027 to summer 2028; Metro says construction schedules are subject to change. No source read says whether the wall or planting at the park is affected, so the 2021 account of the freeway edge may not describe it now.15
Approvals and legal steps
No design, construction or environmental approval, and no Caltrans lease or permit, was found for the original park. No approval for the later bike trail was found either; its 2020 exemption notice, described in the account above, is not a construction permit.
Funding
- 2011/12 California Proposition 84 Statewide Park Program (AB 31): a grant of $4,949,957 awarded to the City of Lynwood for the 5.25-acre Lynwood Linear Park. The listed scope, not an as-built record, covers a trail, exercise and play areas, open space, dog park, garden, mosaic history kiosks, solar lighting, fencing, planting and parking. State Parks shows the project as complete. This is the grant, not a reported final cost.45
- 2022 Later Urban Bike Trail, not the original park: the city called it a $7.6 million project. Funding sources it named include the California Natural Resources Agency, a grant from the San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy, Proposition C and what it calls Measure M Bonds. The notice gives no split.11
No source read gives the final construction cost, design fees, or a maintenance or operating budget for the park. LAF says the stormwater funding sought around 2012 was not awarded.
People
- City of Lynwood Client and owner (LAF); ran community workshops (ASLA)
- SWA Group Landscape architecture, prime consultant; partner firm in the 2021 LAF study
- VCA Engineers Civil and structural engineering
- P2S Engineers Electrical and mechanical engineering
- Sweeney & Associates Irrigation design
- Wallace Lab Soils testing (ASLA credit; scope and results not stated)
- Cumming Cost estimating
- From Lot to Spot Community outreach
- Onward Engineering Construction management
- C.S. Legacy Construction, Inc. General contractor
- Robin Brailsford Mosaic artist
- Lynwood residents Took part in workshops and a planting day; made collages that informed the mosaics
- Claire Latané, José Guadalupe Gutierrez and José Luis Reynoso LAF case study team, 2021; Gutierrez had been a community organiser during design
Sources for this page
- American Society of Landscape Architects, Repairing the Rift: Ricardo Lara Linear Park (2021 ASLA Professional Awards)
- Landscape Architecture Foundation, Landscape Performance Series, Ricardo Lara Linear Park: Case Study Brief (2021)
- Landscape Architecture Foundation, Ricardo Lara Park Methods, by C. Latané, J. G. Gutierrez and J. L. Reynoso (2021)
- California Department of Parks and Recreation, Proposition 84 Statewide Park Program (AB 31) Grant Awards, with project scopes
- California Department of Parks and Recreation, Parks for California, Lynwood Linear Park (grant project page)
- Onward Engineering, Ricardo Lara Linear Park - Ribbon Cutting Ceremony (23 October 2015)
- Urbanize LA, Lynwood Plans Another Linear Park Along the I-105 Freeway (25 November 2019)
- SWA Group, Ricardo Lara Park (project page)
- SWA Group, ASLA Awards 2021: Impactful Landscapes, 11 award-winning SWA projects (27 October 2021)
- City of Lynwood, Senator Lara Linear Park (facility page)
- City of Lynwood, Lynwood's Urban Bike Trail Open (8 December 2022)
- CEQAnet, State of California, Lynwood Urban Bicycle Trail: Notice of Exemption, SCH 2020030395
- The Wave, New bike trail added to linear park in Lynwood (14 July 2022)
- Southwestern Law School, The Freeway with a Heart: Judge Harry Pregerson and the Legacy of the Century Freeway on Its 50th Anniversary, by C. D. R. Cameron (c. 2022)
- Los Angeles County Metropolitan Transportation Authority (Metro), I-105 ExpressLanes Construction Update Community Meeting (17 November 2026)
Researched on 2026-11-26 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.
The question it brings · interpretation
At a freeway edge, what baselines and repeat readings, including where people play and garden, would test claims about noise, particles, heat and runoff, and who pays for them?
Each question is Field Method’s interpretation, not a claim made by the source.
The date
2021: ASLA Professional Awards, Award of Excellence, Urban Design; the year of this entry is the award year. Community engagement from 2010 (LAF); ASLA's page dates the design team's partnership with the city to 2014. State park grant: award year 2011/12 (State Parks). Construction start and completion: 2015 (LAF). Ribbon cutting: 10 October 2015 (post by the construction manager, Onward Engineering). A later bike trail, which The Wave reported in 2022 was to be joined into the park, had opened by 8 December 2022 (City of Lynwood).
Checked against
- American Society of Landscape Architects, Repairing the Rift: Ricardo Lara Linear Park (2021 ASLA Professional Awards)
- Landscape Architecture Foundation, Landscape Performance Series, Ricardo Lara Linear Park: Case Study Brief (2021)
- Landscape Architecture Foundation, Ricardo Lara Park Methods, by C. Latané, J. G. Gutierrez and J. L. Reynoso (2021)
- California Department of Parks and Recreation, Proposition 84 Statewide Park Program (AB 31) Grant Awards, with project scopes
- Onward Engineering, Ricardo Lara Linear Park - Ribbon Cutting Ceremony (23 October 2015)
- City of Lynwood, Senator Lara Linear Park (facility page)
- City of Lynwood, Lynwood's Urban Bike Trail Open (8 December 2022)
- The Wave, New bike trail added to linear park in Lynwood (14 July 2022)
- Southwestern Law School, The Freeway with a Heart: Judge Harry Pregerson and the Legacy of the Century Freeway on Its 50th Anniversary, by C. D. R. Cameron (c. 2022)