ProjectGardens, parks and the profession

2025

Gulbenkian Foundation Garden Extension

VDLA, with Traços na Paisagem / Lugar Invisível (local landscape architect) and Kengo Kuma & Associates (lead design architect), for the Gulbenkian Foundation · Lisbon, Portugal

A southern addition to the 1960s Gulbenkian garden by Gonçalo Ribeiro Telles and António Viana Barreto. It kept many existing trees, added native planting along winding paths, and replaced a high boundary wall with a low one and new entrances.

Recognised in 2025

The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.

How it came about and changed

  1. 1957–1969

    The Foundation acquired the Parque de Santa Gertrudes in 1957; Time Out Lisboa reports that the sale covered six sevenths of the estate. The headquarters, museum and garden were built from 1963 to 1969. Time Out credits the 1969 garden to Gonçalo Ribeiro Telles and António Viana Barreto. The extension builds on that garden; this entry covers the addition, not the original.7113

  2. 1975–2012

    The 1960s garden changed after it was built. The Foundation records that Viana Barreto restored it in 1975 after severe degradation. Ribeiro Telles was invited in 2000 to lead a further rehabilitation, which began in 2002 and ended ten years later. The earlier art centre building, by Leslie Martin, opened in 1983.73

  3. 2005–2017

    The Foundation bought land to the south in 2005. According to Time Out Lisboa, the seller was the widow of the earlier owner, Vasco Maria Eugénio de Almeida; she kept the right to use it until her death in 2017. The house beside it stayed with the Fundação Eugénio de Almeida.116

  4. 2010

    A Foundation news page dated 2016 says its headquarters building and garden were given National Monument status in 2010. The sources read do not say whether that status or any protection zone covers the southern land, or what heritage review the extension received.20

  5. 2019–2020

    An invited international ideas competition (twelve studios, as reported by Time Out Lisboa) sought ways to enlarge the garden. Twelve proposals were exhibited from 7 February to 30 March 2020. Kengo Kuma, working with Vladimir Djurovic, won. The brief as reported in 2019 included a new southern entrance, a link between the new ground and the existing garden, and more exhibition space. Time Out Lisboa reported a unanimous jury that included Emilio Tuñón, Gonçalo Byrne, Luís Ribeiro and two Foundation administrators.8911

  6. 2020–2023

    Works on the art centre and garden ran from 2020. A 2019 report gave 2021 as the target; by September 2022 the Foundation expected completion in the first half of 2024. In November 2022 Djurovic presented the south garden in a talk, described as the start of a process aiming to turn an ornamental garden into a native environment. Lisboa Para Pessoas reported that demolition of the old park wall began in December 2022.611121015

  7. 2023

    For the adjoining street, Rua Marquês de Fronteira, Lisboa Para Pessoas reported in March that the municipality’s execution project for a first phase was still being completed. Quoting the municipality, it said the street works would be carried out by Lisbon City Council and the municipal company SRU. As then planned, the wall would be lowered and set back, adding more than 1,000 m² of public space. On 8 August 2023 the same outlet reported that the execution project was known and that a public tender for the works, in SRU’s hands, had been launched.1516

  8. 2024

    The renovated art centre and new garden reopened to the public on 21 September. Time Out Lisboa reports that many large existing trees were kept, among them pines, eucalyptus, limes, cypresses and a large plane, and that cork oaks and smaller native species were planted. DN reports that some new trees were already of considerable size. A low wall replaced the tall enclosure. Time Out reports that the slight slope directs rain to a ‘vala cega’ (its construction is not described), which leads to the older garden’s large lake, used to feed the irrigation systems. DN reports a rainwater collection system draining to that lake. These accounts give no performance figures.651314

  9. 2024–2025

    The designers’ text on the LILA page describes native plants gathered on field trips and propagated over a few years, and aims at low water use, low maintenance and no chemicals. These are design aims, not measured results. In June 2025 a Foundation garden article said only native species were being introduced in the new area, where most planting was done in summer, and that it would need a little more watering that year. It said plants always need more water in their first year.14

Approvals and legal steps

No building, demolition or heritage permit for the extension was found in the sources read. Coverage of the southern land by the 2010 monument status or any protection zone is unknown from those sources. Whether the street works were finished as described was not confirmed.

Funding

No cost or funding figure for the garden extension was found. The Foundation is the owner behind the project, but no source read states how the works were paid for. ECO reported in July 2023 a patronage agreement with Vanguard Properties supporting the new art centre, running to 2025, with no amount and no separate garden share. The Foundation’s 2024 annual report PDF refused access and was not read.

People

  • Vladimir Djurovic Landscape Architecture (VDLA) Landscape design of the extension
  • Kengo Kuma & Associates Lead design architect; renovation of the Modern Art Centre
  • Traços na Paisagem / Lugar Invisível Local landscape architect
  • OODA Local architect
  • Teresa Nunes da Ponte Arquitectura Architect and general coordination
  • Buro Happold; Quadrante Structural engineers
  • Bartolomeu Perestello; Miguel Tavares Irrigation consultants
  • Pedro Arsénio and Filipe Soares Botanical consultants
  • Sigmetum; Floraviva Nursery; planting contractor
  • Francisco Coimbra Phytosanitary consultant
  • Campo d’Água Mechanical engineer
  • Glu Projectos Lighting consultant
  • Teixeira Trigo Project manager
  • HCI Main contractor
  • Luis Fraçao Landscape contractor
  • Arestalfer Steel contractor
  • Gonçalo Ribeiro Telles; António Viana Barreto Authors of the 1960s garden that the extension adds to
  • Calouste Gulbenkian Foundation Owner of the garden and organiser of the competition

Sources for this page

  1. Landezine International Landscape Award (LILA), Gulbenkian Foundation Garden Extension by VDLA and Kengo Kuma
  2. Calouste Gulbenkian Foundation, Gulbenkian Garden extension wins International Landscape Architecture Award (25 June 2025)
  3. Centro de Arte Moderna Gulbenkian, Building and Garden
  4. Calouste Gulbenkian Foundation, Maintaining the Gulbenkian Garden in Winter (20 June 2025)
  5. Time Out Lisboa, Arte, arquitectura e natureza: a nova vida do CAM começa agora (11 September 2024)
  6. RTP, Centro de Arte Moderna da Gulbenkian reabre ao público este sábado
  7. Calouste Gulbenkian Foundation, History of the Garden
  8. Calouste Gulbenkian Foundation, New Gulbenkian Garden: 12 architectural projects (exhibition, 2020)
  9. Calouste Gulbenkian Foundation, A space for nature: the expansion of the Gulbenkian Garden (2025)
  10. Centro de Arte Moderna Gulbenkian, Back to nature (talk recording; page dated 15 November 2022)
  11. Time Out Lisboa, Conheça o projecto e a história da expansão do Jardim Gulbenkian (24 July 2019)
  12. Time Out Lisboa, Obras na Gulbenkian terminam em 2024, mas o CAM vai abrindo mais cedo (27 September 2022)
  13. Diário de Notícias, Gulbenkian. Mais luz e mais jardim no novo Centro de Arte Moderna (11 September 2024)
  14. Dezeen, Kengo Kuma & Associates: Centro de Arte Moderna Gulbenkian (20 September 2024)
  15. Lisboa Para Pessoas, O Jardim da Gulbenkian está a crescer para sul e vai abrir-se à cidade (5 March 2023)
  16. Lisboa Para Pessoas, Já há projecto para melhorar a ciclovia junto à Gulbenkian e ao El Corte Inglés (8 August 2023)
  17. Kengo Kuma and Associates, Calouste Gulbenkian Foundation, Southern Apex
  18. ECO, Vanguard Properties é a nova mecenas da Gulbenkian (10 July 2023)
  19. Observador, Centro de Arte Moderna da Gulbenkian remodelado abre ao público a 20 de setembro (22 February 2024)
  20. Calouste Gulbenkian Foundation, UNESCO World Heritage (4 July 2016)

Researched on 2026-11-25 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.

The question it brings · interpretation

What dated records of planting survival, irrigation, soil, upkeep and wildlife, from a stated baseline, would show whether the new planting is becoming as self-reliant as intended?

Each question is Field Method’s interpretation, not a claim made by the source.

The date

2025: LILA 2025 Landscape and Architecture Jury Award, reported by the Calouste Gulbenkian Foundation on 25 June 2025; the year of this entry is the award year. Land bought in 2005 (RTP, Time Out Lisboa). Ideas competition: the Foundation and RTP date its launch to 2019. Works from 2020 (RTP). Renovated Modern Art Centre and new garden reopened to the public on 21 September 2024 (RTP, Diário de Notícias).

Checked against

See it on the timeline