ProjectWater, climate and policy

2025

Grønningen-Bispeparken

SLA, with NIRAS (engineering), Kerstin Bergendal and Efterland; client City of Copenhagen; HOFOR credited as collaborator · Copenhagen, Denmark

Turned lawns by social housing into linked wet and dry basins designed to hold cloudburst water at the surface, with places for play, gathering and habitat.

Recognised in 2025

The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.

How it came about and changed

  1. 2017

    The city's 2018 cloudburst package, decided in June 2017, called for natural depressions in the park south of Tuborgvej to hold water from surrounding areas. The northern part belongs to the housing association fsb, which had a co-financing agreement with the utility HOFOR. The two projects were to hold 14,900 m³ together and read as one park. The storage requirement in the north had still to be calculated together with the southern project. The package noted general drinking water interests and called for checking whether district heating pipes were or would be laid about 3.5 m down.12

  2. Before the redesign

    The two park areas were open lawns, the southern one owned by the City and the northern one by fsb. The prize press release places the project in a 1950s social housing development, but the City's 2024 municipal plan says the Bispeparken housing area (Parkbebyggelsen) was built in the 1940s; dates for each estate beside the park were not checked. A 2015 publication on Danish housing of the 1940s and 1950s dates Bispeparken's completion to 1941 and names C.Th. Sørensen as its landscape architect. The plan's cultural environment (kulturmiljø) description lists among its main preservation values the estate's fan-shaped layout around a central park sequence. No source read says how this affected the redesign; the project team's building-award presentation says old hawthorns were kept as far as possible and, with the axis toward Grundtvig's Church, form the park's original frame. ASLA quotes SLA as saying that C.Th. Sørensen designed the original green spaces, which had fallen into unsafe disrepair without activities or play areas, and that the lawns could not manage rainwater and had very little plant variety, wildlife or biodiversity.2136141815

  3. 2019–2022

    The city restarted a paused project in April 2019. In June 2020 it took over the construction client role (bygherre) for fsb's land, so both projects could be carried out together. The planned date of use had been revised to December 2023; after pandemic limits on public meetings it moved to July 2024.6

  4. 2020–2024

    SLA gives this as its project period; Metalocus dates the design to 2019. SLA's anthropologists and geographers worked with residents. An award entry lists workshops, walks, full-scale drawings, digital dialogue and a movable table to reach people less likely to attend meetings, after studies of biodiversity, historic pollen, microclimate and local culture. A four-year art process led by Kerstin Bergendal produced timber structures, made with Efterland.78453

  5. 2022

    The proposal put to the council had linked wet and dry depressions with about 3,500 m³ of surface storage, delaying water before it went on to a pipe in Hovmestervej. In time, the housing associations AAB and AKB were to send disconnected rain from roofs and courtyards into the depressions through channels. The proposal also showed lawns, small squares, bunker mounds as noise screens, an orchard and lighting.69

  6. 2024, as completed

    The park opened on 31 August 2024. The project text on the prize page, which Metalocus labels as SLA's, describes about 20,000 m² with 18 linked bioswales that it says can collect, hold and infiltrate more than 3,000 m³ of rain falling on the park and nearby courtyards and streets. NIRAS, the engineer, says the basins together can retain up to 3,000 m³, that wet and dry basins come into use in different rain events, and that the team let water flow on the surface as far as possible rather than burying stormwater pipes. The 2022 proposal still led water on to a pipe. No source read gives infiltration rates, drain-down time, design storm or the as-built outlet or overflow, or reconciles this volume with earlier figures, which may differ in extent or method.5810111516

  7. 2024, as completed

    The project text describes five settings: wetlands, small dry habitats among the trunks, common lawns, pocket squares and bunker hills for summer sitting and winter sledding. Its data give 149 trees of 23 native species and over four million seeds. SLA's Bjørn Ginman told ASLA that the soil and clay for the mounds and bioswales came from the site. Ginman also said several old concrete retaining walls were kept and some concrete was used in new ways. Further quoted passages in the same article, not separately attributed, describe reused granite stair treads and benches, and paving of selected stones and bricks from city construction sites. Ginman also said that in hindsight the team probably would not have cast the new retaining walls in concrete and would now use alternatives such as rammed earth, but that it did manage to reduce several planned walls.583

  8. 2024–2025

    SLA's account is that a thunderstorm five days after opening flooded highways in Copenhagen while the buildings around the park stayed dry. It gives no rainfall depth or intensity. In the project team's presentation in the City's 2025 building-award document, the caption to a photo credited to SLA says that after a couple of days of heavy rain in September 2024 the water disappeared as planned; it gives no rainfall or water-level figures. No measured water levels, infiltration results or independent storm assessment were found. The city's May 2025 report names Bispeparken among projects newly taken into use, and Bispeparken (Grønningen) among about 58 surface projects to be delivered to the cloudburst plan's 100-year service level. The plan defines that level as 10 cm of water allowed on the ground on average once in 100 years, and pursues it through surface projects and underground works. This is not a test result or a stated capacity for this park.38471215

Approvals and legal steps

  • 2022 On 31 January the Technical and Environmental Committee approved the project proposal as the basis for further design and construction, and recommended the appropriation, both without a vote. On 22 February the Economy Committee sent it to the City Council without a vote, assuming any extra cost would stay within the technical committee's budget. Conservatives asked for lost parking to be replaced nearby. On 3 March the Council rejected that amendment, 41 to 14, and approved the recommendation without a vote.613
  • 2022 The council item records full support from the Bispebjerg local committee. fsb's board broadly backed the plan, raised paving, planting, edges and an operations agreement, and asked whether the largest lawn basin could still host festivals with tents. AAB asked about operating boundaries and winter maintenance; the administration said it would prepare an operations agreement with AAB. AKB asked to move a barbecue area and to change the proposed fire-road paving; the item links this to payment by the housing association itself. The administration would seek another barbecue site. It wanted to keep the paving for symmetry and to limit hard surfacing, and said a change did not fit the project budget.6
  • 2022 The proposal would remove 18 of 47 parking spaces and include an eight-space school drop-off, open to parking outside daytime hours. It would fell 18 trees and plant 128. The overview drawing attached to the same item shows 144 new trees. These are proposal figures, not an as-built record.69

No signed operations agreement, statutory permit or handover record was found, nor how maintenance is split between the city, HOFOR and the housing associations. No maintenance plan or monitoring report was found, so tasks for inlets, outlets, sediment, soil infiltration and planting establishment are not known. The 2025 city report says generally that HOFOR is responsible for wastewater installations, without saying which parts of this park count.

Funding

  • 2016 The Nordvest area renewal programme contributed DKK 4.0 million to developing a programme for Grønningen.2
  • 2017–2020 For cloudburst protection of Grønningen NV - Bispeparken, DKK 17.1 million (2017 prices) was set aside and released in 2017, and a further DKK 7.5 million (2020 prices) in June 2020. At the same time DKK 13.6 million (2020 prices) for a project called Bispebjerg Nord was released and the grants were merged into a stated total of DKK 38.2 million (2020 prices).2
  • 2018–2022 Budget 2019 set aside DKK 27.6 million (2019 prices) for urban space: 5.5 million released with the budget and 22.1 million put forward for release in 2022, equal to DKK 23.134 million in 2022 prices. It also set aside derived operating funds of DKK 0.3 million for 2022 and 1.3 million from 2023 onward, to be transferred when the project was taken into use. The sources do not say which tasks these cover or what was later spent.26
  • 2022 The city gave a project total of DKK 65.8 million: 38.2 million cloudburst, 27.6 million urban space, on different price years.6132
  • 2025 The May 2025 climate report lists Bispeparken north and south as completed, with DKK 38.2 million under co-financing from wastewater tariffs (headed as a budget figure) and DKK 26.7 million for the city (the column gives accounts figures for completed projects). It states no price year in the row.12
  • 2026 The July 2026 climate report lists Bispeparken north and south as finished in 2024, with DKK 37.7 million under co-financing from wastewater tariffs (headed as a budget figure), compared with 38.2 million in the May 2025 report, and DKK 26.7 million for the city (the column gives accounts figures for completed projects). The row states no price year and no reason for the difference.2012

These figures mix price years, appropriations, budgets and accounts, so they do not show cost growth or savings. The DKK 38.2 million includes the amount released for Bispebjerg Nord; the sources read do not say how that relates to the built park, and the three listed amounts also come from two price years. Whether the 2016 area renewal money is inside the DKK 65.8 million is not stated. No final account for the whole project was found.

People

  • SLA (Bjørn Ginman, senior lead designer and project director; Sune Rieper, partner, quoted on the project by ASLA) Landscape architecture
  • NIRAS Engineering, all disciplines
  • City of Copenhagen Client; construction client (bygherre) for both areas, including fsb's land
  • HOFOR Utility; credited as collaborator, and as co-client by Byggeri + Arkitektur
  • fsb Housing association owning the northern part
  • Kerstin Bergendal Artist; four-year art and dialogue process
  • Efterland Landscape studio; timber structures with Bergendal
  • Ebbe Dalsgaard A/S Contractor
  • Christian Raabæk Listed in the project team in the City's 2025 building-award document; no role stated
  • Hogager Byg Listed in the project team in the City's 2025 building-award document; no role stated
  • C.Th. Sørensen Original green spaces, as credited by SLA (quoted by ASLA); named as landscape architect of Bispeparken (completed 1941) in a 2015 publication on 1940s and 1950s housing

Sources for this page

  1. City of Copenhagen, Skybrudsprojektpakke 2018 (cloudburst project package; includes BIR6.1 & 6.2 Bispeparken)
  2. City of Copenhagen, Bilag 7: Økonomi (17 December 2021)
  3. American Society of Landscape Architects, Grønningen-Bispeparken, Copenhagen, Denmark (The Neighborhood Climate Park)
  4. Landezine International Landscape Award, Grønningen-Bispeparken by SLA
  5. International Biennial of Landscape Architecture of Barcelona (COAC), Grønningen-Bispeparken (project page)
  6. City of Copenhagen, Council item, 3 March 2022: urban space improvements and cloudburst protection, Grønningen NV - Bispeparken
  7. SLA, Grønningen-Bispeparken (case page)
  8. Metalocus, Grønningen-Bispeparken by SLA wins the Rosa Barba Landscape Prize 2025
  9. City of Copenhagen, Bilag 4: project proposal drawings, Bispeparken, skybrudssikring
  10. NIRAS, 18 basins in urban park can now retain 3,000 cubic metres of rainwater
  11. Danish Architecture Center, Grønningen-Bispeparken: from gray lawn to green oasis
  12. City of Copenhagen, Klimatilpasningsredegørelsen 2025 (climate adaptation report, May 2025), council attachment
  13. City of Copenhagen, News item on the approved Grønningen NV project (2 February 2022, marked as archived)
  14. International Biennial of Landscape Architecture of Barcelona (COAC), Press release: winners, 2025 Rosa Barba International Landscape Prize (November 2025)
  15. City of Copenhagen, Bygningspræmiering 2025
  16. Arkitektforeningen (Danish Association of Architects), Årets Arne 2025: Vand og mennesker samles i rekreativ bypark
  17. Byggeri + Arkitektur, Rosa Barba pris går til social klimapark i København (25 November 2025)
  18. City of Copenhagen (Kommuneplan 2024; file dated June 2024), 4.6 På Bjerget og Bispeparken
  19. AZ Awards (AZURE), AZ Awards Winner 2026 in Landscape: Grønningen-Bispeparken
  20. City of Copenhagen, Klimatilpasningsredegørelsen 2026 (climate adaptation report, July 2026)
  21. Dansk Bygningsarv (editor); produced for Realdania, Landsbyggefonden and Grundejernes Investeringsfond, 1940'erne og 1950'ernes murede boligbebyggelser: Bygningskultur og bevaringsværdier (2015)

Researched on 2026-11-25 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.

The question it brings · interpretation

What would storm-by-storm records of rainfall, inflow, basin levels, infiltration, drain-down, outflow and overflow show as soils and planting age?

Each question is Field Method’s interpretation, not a claim made by the source.

The date

2025: Rosa Barba International Landscape Prize, presented on 21 November 2025 at the 13th Barcelona International Landscape Biennial (programme press release); the year of this entry is the award year. Design: 2020 to 2024 is the project period SLA gives; Metalocus gives a design date of 2019. Opening: 31 August 2024 (programme project page, SLA, NIRAS).