A memorial park on a mound of wartime Warsaw's rubble. The design works with self-sown vegetation, including invasive species, adds planting and routes, and reuses rubble in gabion displays and new concrete.

Recognised in 2024

The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.

How it came about and changed

  1. 1944–1945

    The Warsaw Uprising began on 1 August 1944 and ended on 2 October. The US Holocaust Memorial Museum says the victims numbered more than 180,000. It says German troops took revenge on civilians, that approximately 40,000 men, women and children were murdered in massacres in Wola, that the Germans deported civilians, and that German troops destroyed most of the city during and immediately after the uprising. A 1944.pl article says German units went on burning quarters through autumn and winter, until the Red Army entered in mid-January 1945. It says military operations across the war, including 1939, the 1943 Ghetto Uprising and the 1944 Uprising, destroyed 85% of Warsaw.131211

  2. late 1940s to mid-1960s

    Rubble from the city was dumped at Czerniaków, on former clay pits, and built up into an artificial hill. The CCCB sheet puts it about 35 m above the flat, marshy ground around it. Plants later colonised the dump.2914

  3. 2017 accounts of the dumping years

    At a 2017 anniversary ceremony on the mound, PAP reported, Eugeniusz Tyrajski, vice-president of the veterans' circle of the Home Army's Baszta regiment and other Mokotów insurgent units, said that although efforts were made during construction to remove human remains from the incoming rubble, many remain there. PAP also reports that Mokotów district mayor Bogdan Olesiński said Stefan Jaworski, who helped pile the mound, had found human remains in the rubble. No official survey was found in the limited searches made; this does not show that none exists.11

  4. 1945–1958 (earlier memorial ideas)

    A Museum of Warsaw gallery text says that in 1945 the architect Stanisław Gruszczyński was preparing a design for a huge memorial mound of rubble from across Warsaw, proposed as the Mound of Freedom (Kopiec Wolności); the idea did not gain political support in the Stalinist period. It says that in 1958 a team including the architect Witold Cęckiewicz proposed turning the existing Czerniaków rubble hill into a monument to the Warsaw insurgents; the entry took third place in a competition and was not carried out. PAP reported in 2022 that Ajewski credited the idea of such a place on the mound primarily to Gruszczyński who, PAP says, started the heaping of the hill from rubble just after the war.1610

  5. 1990s–2004

    The site stayed a neglected dump until the mid-1990s. Eugeniusz Ajewski, an architect and veteran of the uprising, campaigned for it to become a memorial. The Fighting Poland anchor, symbol of the wartime resistance, was set on the summit in 1994 for the 50th anniversary. By a decision of 24 March 2004, the Warsaw City Council gave the mound its present name, Warsaw Uprising Mound. PAP reported in 2022 that the change resulted from efforts by the community of the World Association of Home Army Soldiers (Światowy Związek Żołnierzy AK), and in particular by Ajewski.104159

  6. 2018–2021

    Public consultations in 2018 fed the competition guidelines. Archigrest and topoScape won Zarząd Zieleni's competition, decided in 2019. LILA dates the design to 2020–2021. In June 2021 the authority said it would plant more than 450 young park trees and nearly 8,500 forest seedlings, with native shrubs and perennials, and ease the summit approach with ramps. It said it would aim to replace invasive species, including ash-leaved maple and black locust, with preferred plants. It said wild zones could be set aside in some places and greenery tidied in more heavily used ones.653

  7. 2020–2023 (design as described)

    The designers treat the former dump as a Fourth Nature site. LILA says keeping the existing invasive and ruderal vegetation was a priority. The design descriptions build on spontaneous succession, restore a meadow mix based on historical publications and add small Miyawaki-method forests. Rubble is used as aggregate in concrete, including ravine retaining walls, and appears in gabions. Metalocus's project text also describes wooden gutters and fascine drains to hold water and organic matter. These are design descriptions; no measured results were found.314

  8. 2021–2023

    Zarząd Zieleni dates the works from October 2021 to July 2023; Remondis built them. The park reopened on the eve of the 79th anniversary with a two-level summit viewing platform, the restored anchor on a new pedestal, a memorial fire site, rubble displays along the Aleja Godziny W stairs and near the Bartycka Street entrance, rubble-concrete gorges, a nature trail, a footbridge, and play and dog areas. The authority says people can reach the summit without using stairs, and that wildlife zones with limited human access were kept. In July 2023 it said the monument was to be lit to resemble a flame from 1 August to 2 October. On 2 August 2026, PAP reported that the memorial fire would be lit, as the year before, on only three days (1 August, 27 September and 2 October), and that until 2025 it had burned without a break for 63 days. Whether the monument's lighting also changed was not established.57417

  9. 2024

    The entrance square off Bartycka Street opened on 21 June, with a Miyawaki micro-forest that residents helped plant in April (the authority gives a total of more than 2,000 native plants), a rain garden, meadows and a rubble-concrete retaining wall. The project won the General category of the European Prize for Urban Public Space and a LILA 2024 Jury Award.8513

  10. 2004–2026 (memorial crosses, disputed)

    Radio Warszawa reports that the history of crosses commemorating insurgents on the mound goes back to 2004, as a grassroots commemoration. They were dismantled during the 2021 works and did not return to their original place; residents put up new crosses in 2025. On Sunday 1 March (in 2026: the report mentions crosses put up in 2025, but its text gives no year), Mokotów councillor Radosław Sosnowski found about 10 crosses pulled up and thrown into bushes. The councillor said weather was certainly not the cause, suggested possible vandalism and pledged action to have crosses set up again in their former place. Zarząd Zieleni's spokesperson said preliminary findings showed no vandalism and that the crosses had most probably fallen because of the long winter and thaw. The spokesperson also said they were not part of the official redevelopment design and that some would be moved to another fitting place. The report gives no reason from the authority for the 2021 dismantling. The current position was not established.18

Approvals and legal steps

No building permit, heritage consent or budget resolution for the park was found in the sources read. LILA says that, following a conservator's decision, rubble remained on site. The decision itself was not read; its date, scope and legal basis are not established here.

Funding

  • 2023 Zarząd Zieleni gave the cost of the park's modernisation, reported in July 2023, as more than 24 million zł. It does not state whether this includes VAT or design fees. The entrance square was a later stage.759
  • 2021–2023 The works were part of EU project POIS.02.05.00-00-0116/16, co-financed by the Cohesion Fund under the Infrastructure and Environment Operational Programme 2014–2020. The authority says the EU project's scope covers the area directly around the mound; these sources give no grant amount.769
  • 2024 Notes from Poland, citing the city, reported on 4 November 2024 that the revitalisation was supported by 11.6 million zł in EU funds. The figure was not found in the authority's pages read.15
  • 2024 Zarząd Zieleni's investment page gives the cost of the entrance square as 9,408,516 zł. VAT is not stated.5
  • 2024 The CCCB and LILA project sheets, read for the 2024 awards, give a cost of €5,300,000. Neither states VAT, price year, exchange rate or what is covered.23

These figures differ in scope and basis; do not add them or compare them. No split between city and EU money was confirmed by the authority's pages.

People

  • topoScape (Justyna Dziedziejko, Magdalena Wnęk) Landscape architecture
  • Archigrest (Maciej Kaufman, Marcin Maraszek) Architecture
  • Karolina Potębska, Agata Holdenmajer, Natalia Janek, Jerzy Przychodni, Rafał Murawski, Joanna Chylak, Anna Sternytska, Agnieszka Tama Cooperation (LILA)
  • Zarząd Zieleni m.st. Warszawy Listed by CCCB as developer; ran the competition
  • Konbud (Krzysztof Guraj, Paweł Komorek) Structural design
  • TBAiS (Krzysztof Kuniczuk) Concrete technology
  • Piotr Sikorski Phytosociological consultation
  • Adam Przywara; Kasper Jakubowski Heritage trail; nature trail exhibitions
  • Kaja Kusztra Visual identity and exhibition graphics
  • Remondis; Sorted Construction (Zarząd Zieleni names Sorted as subcontractor; LILA and CCCB name it as contractor; Metalocus credits it with construction management)
  • Eugeniusz Ajewski Uprising veteran and architect who campaigned for the memorial

Sources for this page

  1. European Prize for Urban Public Space (CCCB), 2024 Prize: results
  2. European Prize for Urban Public Space (CCCB), Park at the Warsaw Uprising Mound (project page)
  3. Landezine International Landscape Award, The Warsaw Uprising Mound Park (LILA 2024 Jury Award)
  4. Zarząd Zieleni m.st. Warszawy, Park Akcji „Burza” (park page)
  5. Zarząd Zieleni m.st. Warszawy, Park Akcji „Burza” z Kopcem Powstania Warszawskiego (completed investment)
  6. Zarząd Zieleni m.st. Warszawy, Nowy park pod Kopcem Powstania Warszawskiego (24 June 2021)
  7. Zarząd Zieleni m.st. Warszawy, Park pod Kopcem Powstania Warszawskiego znów otwarty (31 July 2023)
  8. Zarząd Zieleni m.st. Warszawy, Plac wejściowy w parku Akcji „Burza” już otwarty (21 June 2024)
  9. PAP, on dzieje.pl, Park Akcji „Burza” pod Kopcem Powstania Warszawskiego po modernizacji (21 July 2023)
  10. PAP, on dzieje.pl, Odnowiony Pomnik Polski Walczącej wrócił na Kopiec Powstania Warszawskiego (19 August 2022)
  11. PAP, on dzieje.pl, Zakończyły się obchody 73. rocznicy Powstania Warszawskiego (2 October 2017)
  12. Warsaw Rising Museum (1944.pl), Phoenix from the ashes. A short story of Warsaw that was destroyed and rebuilt
  13. United States Holocaust Memorial Museum, The Warsaw (Polish) Uprising
  14. Metalocus, Pioneers of the circular economy: Uprising Mound Park by Archigrest and topoScape
  15. Notes from Poland, Warsaw park built on mound of WWII rubble wins European Prize for Urban Public Space (4 November 2024)
  16. Museum of Warsaw (Muzeum Warszawy), Sala 7: Krajobraz historii (gallery text, PDF; no publication date shown)
  17. PAP, on dzieje.pl, Zapłonął ogień na Kopcu Powstania Warszawskiego (2 August 2026)
  18. Radio Warszawa, Wandalizm czy warunki pogodowe? Przewrócone krzyże na Kopcu Powstania Warszawskiego (no publication date shown)

Researched on 2026-11-25 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.

The question it brings · interpretation

How should a park be designed, built and managed for both remembrance and everyday use on a mound made of a destroyed city's rubble?

Each question is Field Method’s interpretation, not a claim made by the source.

The date

2024: year of both awards; the entry stands at the award year. Competition decided 2019 (Zarząd Zieleni); design 2020 to 2021 (LILA). Works October 2021 to July 2023 (Zarząd Zieleni; the CCCB sheet gives 2022 to 2023). Reopened in late July 2023; the Bartycka Street entrance square opened on 21 June 2024.

Checked against

See it on the timeline