2022
Little Island
Heatherwick Studio (architect) and MNLA (landscape architect), with Arup (engineering), Mueser Rutledge (marine engineering) and Standard Architects (amphitheater and back-of-house) · Pier 55, Hudson River Park, Manhattan, New York City, United States
A planted public park with performance spaces, raised on precast pots and piles in the Hudson River, opened in 2021. A private foundation provided most funding. Litigation preceded a 2017 cancellation and revival.
Recognised in 2022
- 2022 WLA Awards (as reported by Landscape Architecture Aotearoa): Award of Excellence, Large/Built category (reported in one photo caption in a Landscape Architecture Aotearoa notice, published by NZILA under the byline Guest User; year read from the words "last year's"; not found on the operator's or MNLA's own award lists; no programme page or second source seen)
- 2022 ASLA New York Chapter Design Awards: Honor Award, General Design
The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.
How it came about and changed
- 1970s onward
The operator's pier history says that after a spell of disuse Pier 54 became, from the 1970s into the early 1980s, a refuge for New York's growing LGBTQ community. From 1986 it was home to the annual Dance on the Pier, held there as part of Pride for more than 25 years; the pier also hosted summer events and concerts. The passages read do not say how Little Island recognises or hosts the LGBTQ history. The page links to a history audio tour, which was not reviewed. This research found no source on consultation with that community about the new park.7
- 2013
After Hurricane Sandy damaged Pier 54, Barry Diller and the Hudson River Park Trust's leadership began the project, according to the operator. The operator names Heatherwick Studio and MNLA as the design firms.56
- 2014
A December 2014 amNewYork piece, labelled Opinion on its site, relayed the environmental assessment's prediction that driving fewer than 400 new piles would not harm migrating endangered sturgeon or sea turtles, or 21 other species for which the Pier 54 area was considered essential fish habitat. The piece also said the raised deck would let sunlight reach the water and avoid harmful shading. Both were pre-construction expectations for the design then proposed; a hearing notice of that month referred to the assessment as a draft. In the piece, Assemblymember Deborah Glick called the project an amazing gift but criticised the earlier secrecy and a private nonprofit's control of public space, saying questions remained; the piece itself expected neighbours and park activists to object that there had been no public review. A public review period with a hearing was scheduled.1311
- 2015
As amNewYork reported when the Trust board approved it, the lease with the nonprofit Pier55, Inc. capped closures of the pier for setting up or taking down permitted events at a yearly average of four a month, never more than five in one month, and required at least 30 events a year. A requirement that 51% of events be free or low-cost was still undefined. The pier's high point had been lowered from 71 to 62 feet; the report gives no datum. 6sqft described Pier55, Inc. as a nonprofit controlled by Diller. Later changes to these terms were not checked.1415
- 2015–2016
The operator says construction began in 2016. In a suit filed in June 2015, the City Club of New York challenged the project in state court, arguing among other things that the Trust's approval violated the public trust doctrine; the challenge also covered the environmental review and compliance with the Hudson River Park Act. amNewYork reported that the Trust used an environmental assessment form, found no significant impact and did no full environmental impact statement; the City Club argued the review lacked the required hard look. Justice Joan B. Lobis dismissed the suit in April 2016, holding, as reported, that the doctrine applies to municipal, not state, parkland, and that the form had examined alternatives and risks. The Appellate Division upheld the dismissal in September, finding no breach of the doctrine and that the Trust had taken a hard look. An injunction issued pending the appeal had been partly lifted to let the first nine piles go in; the September ruling lifted the injunction blocking pile driving. The City Club's Rob Buchanan said it would appeal, and Tom Fox said it would seek a hearing at the state's highest court; Trust president Madelyn Wils welcomed the ruling. The Court of Appeals declined to hear the case in October. Separately, DNAinfo reported on 27 April 2016 that the City Club's president, Michael Gruen, said it had filed an appeal and another suit, against the state Department of Environmental Conservation; that suit's outcome was not found.617181920
- 2017
amNewYork reported that on 23 March, in a federal suit by City Club members Tom Fox and Rob Buchanan, Judge Lorna Schofield vacated the Army Corps of Engineers permit. She held that the Corps wrongly treated the project's basic use as water dependent under the Clean Water Act, and wrongly found the waters were not a special aquatic site. The Trust called the ruling largely procedural. The Corps and the Trust filed notices of appeal in late May. A modified permit in June followed a redesign: precast piles replaced flowable concrete fill in some hollow piles below the waterline, and dressing rooms moved from a barge to space under the deck. The Trust said removing the fill made the judge's objections irrelevant and that it dropped its appeal after the new permit; the outcome of the Corps' appeal was not found. Attorney Richard Emery, on the challengers' side, said they were still weighing all options. In July the City Club, Fox and Buchanan filed a new federal suit, arguing that the modification was unlawful and that a new permit, with public notice and hearings, was required. The Trust said the claims lacked merit and hoped for a constructive resolution. No ruling on that suit was found.202122
- 2017
On 13 September Diller ended the project after settlement talks between the Trust and the City Club, citing rising costs and the continuing dispute. 6sqft reported that developer Douglas Durst had financed the opposition. In May 2017 amNewYork reported that Durst had funded the City Club suit after Riverkeeper, which first backed it, dropped out. Durst told the paper that this role had been "very limited" and had ended more than six months earlier, and that the name was kept out of it to avoid "a personal battle" with Diller; the paper said Durst declined to say how much was given. No City Club account of that funding was found in the articles read. A deal brokered by Governor Andrew Cuomo, announced on 25 October, revived the project. As reported, the City Club and Durst vowed to drop pending litigation; Cuomo undertook to complete the unfinished quarter of Hudson River Park and not to allow development in what 6sqft called the marine estuary (the area and terms covered were not read); Diller agreed to try once more, with conditions.312324
- 2016–2021
MNLA describes 132 precast concrete pots, each on a precast column, with piles driven to rock as much as 200 feet below the water. MNLA says weathering-steel sheet piling was selected for the retaining walls. Arup says its engineers suggested precast concrete for the pots, which form the park's base, and with Heatherwick Studio chose it over concrete cast above the river or costly steel. Arup's text credits Arup with the Cairo pentagon pattern used in their design; an image caption credits Arup's structural team together with Heatherwick Studio.34
- 2020
MNLA says planting ran from March to December 2020. It gives roughly 400 species and more than 66,000 bulbs, and says the pier's raised corners create distinct microclimates. The operator describes native plantings with lawns and gardens, and its landscape page quotes Signe Nielsen of MNLA saying most of the plants are native. The palette is not all native: a December 2024 Gardens Illustrated article describes native and non-native plants. No audited native share, or definition of native, was found.35830
- 2021
The park opened on 21 May. At opening, 6sqft reported daily hours of 6 a.m. to 1 a.m. and timed reservations required from noon to 8 p.m.625
- 2021
In a December 2021 interview reported by Greenroofs.com, Nielsen said that at Hudson River Park, including an MNLA pier, Hurricane Sandy's waves got in between the finishes and the deck and pushed geofoam and the finishes above it upward. That lesson, she said, led to using only aggregate within the flood zone up to elevation 16 (no datum given in the passages read). She put the thickness of the geofoam in the landform at perhaps 2 to 12 feet. The interview account says slope length determined the proportion of geofibres in the soil. The same series gives soil depths from 24 inches to 6 feet, deepest at the large specimen trees, drip irrigation for landscaped areas other than turf, and pop-up sprinklers for the lawn. This describes one design; it is not a performance record or a design rule.282729
- 2021–2024
Informal accounts report changes and losses; the passages read do not date the plant losses. In December 2021 Nielsen said some original species were lost where it was wetter than expected, and young Joe Pye weed was added. She said Panicum and Iris were doing fine, but Calamintha and Salvia had died, and the spot was made a rain garden. Some trees showed growth and others did not. In March 2022 Greenroofs.com reported trampling around the heavily used boulder scrambles, which had been closed for redesign and rebuilding, with more boulders and replanting planned. It also expected some planting to need strengthening or occasional replacement, including sun perennials as trees cast more shade. Gardens Illustrated, in December 2024, describes a head of horticulture leading a small garden team.282930
- 2021–2026
MNLA says the pier provides climate resilience. Arup says green infrastructure in the planting and plazas lets nearly the whole park soak up stormwater. These are designers' statements. Nielsen separately described a drainage mat over the entire deck and drains through the slab that discharge water into the river. The pages read give no retained volume, design storm, treatment or measured discharge. About a slot detail meant to stop water shearing off the top layer, she said Hurricane Ida moved no mulch and took that as proof of concept for the drainage; this is a surface observation, not a stormwater or flood measurement. No published monitoring or measured results after opening were found for stormwater, flood performance, planting, structure or river ecology.3428
- 2022–2023
The lead award on this page rests on one photo caption. A 9 March 2023 notice opening entries for the 2023 WLA Awards, in Landscape Architecture Aotearoa (published by NZILA) under the byline Guest User, says Little Island by MNLA won "last year's" Award of Excellence in the Large/Built category; we read this as the 2022 awards, so the year comes from the words "last year's". No other report of this award was found. Read on 26 November 2026, the operator's awards page and MNLA's awards page list other 2022 honours for the park, including the ASLA New York chapter's Honor Award, but no WLA award; their silence does not show the caption is wrong. No programme page, winners list or announcement date was found, and the programme's own pages were not used. Separately, the ASLA New York chapter's own page shows a 2022 Honor Award, General Design.1232333
- 2026
Read on 25 November 2026, the operator's FAQ calls the park free, with paid tickets only for performances in The Amph. It opens at 6 a.m. daily unless weather dictates otherwise; closing times vary by season. The FAQ puts the main lawns on a rotating schedule from mid-May to September, Wednesday to Sunday. Lawns close for maintenance on Mondays and Tuesdays, holidays excepted, and may close for rain or heat; extreme weather can close the whole park. The passages read do not mention reservations. The operator says the park is ADA compliant, with all areas reached by pathways, mostly paved; The Glade has dirt and the lawns are grass. It lends two wheelchairs. Its current terms name Pier55 Inc., doing business as Little Island, as the park's operator. Greenroofs.com wrote in 2022 that most paths are steep enough to require handrails, and MNLA lists seven stair sets with 420 steps. Access was not independently checked.6910293
Approvals and legal steps
- 2015 On 11 February the Hudson River Park Trust board approved the project and a 20-year lease, with an optional 10-year extension, for Pier55, Inc. to operate the pier.14
- 2016 The New York State Department of Environmental Conservation approved the project in late March, as reported in April; the report does not name the permit.17
- 2016 DNAinfo reported on 27 April that project organisers had announced Army Corps of Engineers approval of the permit. A 2017 amNewYork report dates the permit to April 2015, but in December 2015 the Corps said the application, filed that April, was still under review, and on 14 April 2016 amNewYork reported no permit yet. The permit was not read. It was vacated on 23 March 2017.18161720
- 2017 The Army Corps issued a modified permit in June for the revised pile and dressing-room design. A new federal suit challenged it in July; no ruling was found.2122
Approvals and court steps rest on press reports; permit documents, the lease, the environmental assessment and court opinions were not read, and this page draws no legal conclusion. Approvals or lease amendments made after the October 2017 revival were not found.
Funding
- 2014 On 17 November amNewYork reported an expected cost of over $130 million, with the Diller-von Furstenberg Family Foundation to pay most of it and the City $17 million. A December amNewYork piece labelled Opinion gave a $113 million pledge from Diller and von Furstenberg, plus the City's $17 million.1213
- 2014 A December hearing notice for the proposed lease gave Pier55, Inc.'s minimum design and construction commitment as over $100 million. It said the Trust had committed $17 million in City capital funds and $500,000 in other public money toward Pier 54's redevelopment. These are stated commitments, not final spending.11
- 2014 Under the same notice of the proposed lease, Pier55, Inc. would pay for cultural programming and for upkeep of the landscape and other amenities, while the Trust had committed to maintain the support piles and other structural parts of the pier. After ten years, the tenant could keep operating and maintaining the pier for the rest of the term or contribute toward its future maintenance. The final lease was not read.11
- 2015 amNewYork reported that the approved lease let Pier55, Inc. end its operation of the pier after the first ten years, with a year's notice and a $5 million payment to the Trust. The same report gave a $130 million cost; how that figure divides between private and City money is not established here.14
- 2017 In June a Trust spokesperson told amNewYork that the public funding cap was $20,232,000: $17.5 million committed since the project began and $2,732,000 approved by the Trust board in January. As the paper reported, challenger Tom Fox and the challengers' attorney Richard Emery said Diller's share was capped at $185 million, and the paper noted the cost had risen to $250 million; the Trust said $185 million was never a cap and that Diller/Pier 55 would be responsible for all cost overages. These are stated commitments and positions, not final spending.21
- 2017 At cancellation in September, 6sqft put the cost at more than $250 million and linked the rise partly to delay from litigation. It also cited a first estimate of $35 million. That does not match the 2014 reporting above of $130 million or more; its basis was not found, so it is not used here as a baseline.2312
- 2021 At opening, 6sqft gave a cost of roughly $260 million, funded mainly by Diller and the Diller – von Furstenberg Family Foundation. The operator also names the foundation as primary funder and notes City support.2565
- 2021 In July CBS News reported the couple's pledge of another $120 million for maintenance and programming over 20 years. This is separate from the construction cost and is a pledge, not recorded spending. The passages read do not say whether it covers the structure, or who pays after those 20 years.26
- 2022 Greenroofs.com (January 2022) put the total cost at $250 million, all but $17 million of it provided by what it called the Diller von Furstenberg Family Trust, with the $17 million paid for by the Hudson River Park Trust. This is a secondary account, not an audited figure; it differs from 6sqft's roughly $260 million and from the 2017 public funding cap of $20,232,000.27
No audited or official final account of private and public shares was found, nor the final or current lease terms, or budgets for structural inspection and repair. The state commitment in the 2017 deal concerned completing the rest of Hudson River Park and is not counted here as Little Island construction money. The figures are on different dates and bases.
People
- Heatherwick Studio Architect (ASLA New York, Greenroofs.com); the operator names it as a design firm with MNLA
- MNLA (Signe Nielsen, principal) Landscape architect; Greenroofs.com also credits it as architect of record for all but the amphitheater and restrooms; the firm named in the NZILA caption
- Arup Structural, civil and MEP engineer; Arup also lists acoustic, audio-visual and theatre design and digital fabrication
- Mueser Rutledge Marine engineer (ASLA New York, Greenroofs.com); the operator calls it geotechnical engineer
- Standard Architects Architect for the amphitheater and back-of-house areas (ASLA New York); Greenroofs.com: architect of record for the amphitheater and restrooms; the operator gives architect of record without a scope
- Fisher Marantz Stone Lighting design
- ICI Irrigation
- C & G Partners Signage (Greenroofs.com); graphic design (ASLA New York)
- Hunter Roberts Construction Group Construction manager
- Weeks Marine Marine contractor, main pier
- Coastal Precast; Fort Miller Fabricators of piles and pots respectively
- Hudson River Park Trust Park authority and lessor in the 2014 lease proposal, under which it was to maintain the pier structure; owner of the land and water (Greenroofs.com); client according to Arup, while MNLA names Little Island
- Pier55, Inc. Nonprofit tenant under the lease approved in 2015; the operator's current terms name Pier55 Inc., doing business as Little Island, as the park's operator
- Barry Diller, Diane von Furstenberg and the Diller – von Furstenberg Family Foundation Main funders; the operator calls the park a foundation initiative
- City Club of New York, with members including Tom Fox and Rob Buchanan Challengers of the project in state and federal court
- Andrew Cuomo, then Governor Brokered the October 2017 agreement
Sources for this page
- Landscape Architecture Aotearoa, NZILA, World Landscape Architecture Awards 2023 (March 2023)
- ASLA New York Chapter, Little Island (ASLA-NY Awards)
- MNLA, Little Island (project page)
- Arup, Little Island (project page)
- Little Island, Designing Little Island
- Little Island, Rules & FAQ
- Little Island, Pier History
- Little Island, Explore the Landscape
- Little Island, Accessibility
- Little Island, Terms & Conditions
- The City Record Online (Hudson River Park Trust notice), Amended notice of public hearing: proposed lease with Pier55, Inc. (December 2014)
- amNewYork, Hudson River Park plans to build 'Pier55', a futuristic waterfront park and performance space (17 November 2014)
- amNewYork, Pier55 and public process in Hudson River Park (Opinion, December 2014)
- amNewYork, Modified Pier55 Gets Park Trust Green Light (26 February 2015)
- 6sqft, Pier 55 Floating Park Moves Forward with a Lease Deal (12 February 2015)
- amNewYork, Pier55 enviro impact would not be significant, says state; Suit remains (24 December 2015)
- amNewYork, Judge sinks Pier55 suit (14 April 2016)
- DNAinfo, Pier 55 To Begin Construction This Summer After Getting Army Corps Approval (27 April 2016)
- amNewYork, Court sinks Pier55 lawsuit; City Club foes vow to appeal (9 September 2016)
- amNewYork, 'Diller Isle' dead in water? Judge nixes crucial permit (24 March 2017)
- amNewYork, Corps Modifies Permit: Does Hope Float for Pier55? (29 June 2017)
- amNewYork, Trust in Pier55 parley as new lawsuit is filed (27 July 2017)
- 6sqft, Barry Diller pulls the plug on $250M Pier 55 offshore park (14 September 2017)
- 6sqft, Barry Diller's Pier 55 offshore park plan is back on with backing from Cuomo (26 October 2017)
- 6sqft, NYC's newest park Little Island finally opens on the Hudson River (20 May 2021)
- CBS News, New York's newest island, a man-made gift to the city (25 July 2021)
- Greenroofs.com, A Leaf with Upturned Edges, Part 1 of 3, by Steven L. Cantor (19 January 2022)
- Greenroofs.com, A Leaf with Upturned Edges, Part 2 of 3, by Steven L. Cantor (9 February 2022)
- Greenroofs.com, A Leaf with Upturned Edges, Part 3 of 3, by Steven L. Cantor (17 March 2022)
- Gardens Illustrated, This futuristic park on stilts is a new landmark for New York with planting prowess from top designers (3 December 2024)
- amNewYork, Durst admits funding Pier55 lawsuit, proving 'Novo' suspicion true (18 May 2017)
- Little Island, Awards & Recognition
- MNLA, Awards
Researched on 2026-11-25 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.
The question it brings · interpretation
For a planted park on new estuary piles, what monitoring after opening would show shading and habitat effects, what leaves the deck drains, how planting establishes, how the structure ages, and who would publish it?
Each question is Field Method’s interpretation, not a claim made by the source.
The date
2022 is inferred: the year is read from the words "last year's". A 9 March 2023 notice opening entries for the 2023 WLA Awards, in Landscape Architecture Aotearoa (published by NZILA) under the byline Guest User, has a photo caption saying Little Island by MNLA won "last year's" Award of Excellence in the Large/Built category; we read this as the 2022 awards. That caption is the only report of this award found. The operator's awards page and MNLA's awards page and project page, read 26 November 2026, list other 2022 honours for the park but no WLA award. No programme page, winners list or announcement date was found, and the programme's own pages were not used. The caption credits MNLA only; the project team was larger. Park: conceived 2013; construction began 2016; cancelled and revived in 2017; opened 21 May 2021 (operator, 6sqft).
Checked against
- Landscape Architecture Aotearoa, NZILA, World Landscape Architecture Awards 2023 (March 2023)
- ASLA New York Chapter, Little Island (ASLA-NY Awards)
- MNLA, Little Island (project page)
- Little Island, Designing Little Island
- Little Island, Rules & FAQ
- The City Record Online, notice of the Hudson River Park Trust, Amended notice of public hearing: proposed lease with Pier55, Inc. (December 2014)
- amNewYork, 'Diller Isle' dead in water? Judge nixes crucial permit (24 March 2017)
- 6sqft, Barry Diller's Pier 55 offshore park plan is back on with backing from Cuomo (26 October 2017)
- 6sqft, NYC's newest park Little Island finally opens on the Hudson River (20 May 2021)