Doca Linear Park (Parque Linear da Nova Doca)
Natureza Urbana (masterplan and basic project), for the Government of Pará; funded by Itaipu Binacional · Belém, Pará, Brazil

A 1.2-kilometre linear park along a tidal canal in central Belém. The state lists gates, sewers and planted filter beds among the works. The press reported flooding in 2026; no published monitoring was found.
Recognised in 2026
- 2026 World Architecture Festival: Landscape of the Year 2026 (Overall winners, heading Landscape, Winner)
The entry stands at the year of the award. An award records what a jury valued that year; it is not a measure of how the place performs or of lasting influence.
How it came about and changed
- to c. 1910
The state describes the Doca as a former arm of Guajará Bay, known as Igarapé das Almas or Igarapé das Armas. A 2019 University of Brasília dissertation, citing Trindade (1997), treats the Almas and the Reduto as separate igarapés; around 1910, port construction closed the Reduto dock and diverted the mouth of the Almas.45
- 1963–1973
The federal sanitation works department (DNOS) dated its canal design 1963. The dissertation, drawing on interviews, counts ten years of works, completed under a mayor in office from 1970 to 1973: a reinforced-concrete canal of 1,250 metres, 10 metres wide in one part and 20 in another (dimensions from Trindade, 1997), with gates and traffic lanes. Residents of stilt houses along the water were removed and did not return.5
- 1995–2020
A 1995 redesign added the patterned guard rail. In 2019 the dissertation recorded odour, litter, sewage and overflow. A 2020 article in Novos Cadernos NAEA, citing earlier studies, put permeable ground at 2.06% of the Reduto basin and ranked the basin of the Doca and Reduto canals among Belém's three most affected by flooding, relative to area.56
- Design (dates not stated)
Natureza Urbana lists its scope as masterplan and basic project, and gives the date 2025 without saying which stage it marks. Its stated strategies are a planted channel lining for roughness and habitat, phytoremediation of diffuse pollution, raised visitor structures and more permeable ground. The state reported reconstruction of the canal's bottom and walls; no source read states how much lining became planted.310
- March–May 2024
The State Secretariat of Public Works (Seop) presented the project to the water company, city agencies and the power utility on 21 March 2024. The order to start works was signed on 7 May. The scope covered drainage, sewers, paving, planting, walkways, a cycle path and six replacement tide gates.789
- August 2024 – January 2025
Archaeological monitoring found the bow of a metal vessel at the canal edge on 12 August 2024. Staff of the heritage institute Iphan instructed workers to isolate the find and halt nearby work. The vessel, 22 metres long, was lifted in three sections, the last on 27 January 2025.1112
- March–April 2025
The first block opened to view on 31 March 2025. The state described planted filter beds for the canal water and said the project would have bioretention basins; the bulletin does not say where either was built. After criticism of an artificial-tree prototype, the state used frames of reused reinforcing bar with hanging planters; the botanist Ricardo Cardim questioned the exotic species in them. Diário do Pará reported that the new gate kept out tides of 3.5 to 3.6 metres on 29–31 March and that a pumping system would operate in heavy rain at high tide. Whether that system was installed was not established.131415
- March–August 2025
Residents of Vila da Barca, a stilt-house community, said spoil from the works was dumped there and that a pumping station for the Doca's sewage was being built without consultation. Seop denied that sewage would be held there and said it would be treated at the Una plant. In August the governor visited water and sewer works there.161718
- 2 October 2025
President Lula and Governor Helder Barbalho inaugurated the park six weeks before COP30. The federal account lists new gates and works to collect sewage that had entered the canal without adequate treatment.41920
- March–August 2026
Rain with tides above 3 metres flooded the avenue on 3 March 2026, and Folhapress reported repeated flooding in April. A researcher quoted there said the surrounding drainage had been left out. The state denied a planning failure and said the gates work. An undated conference abstract, written after the park opened, on this park and the Tamandaré park recorded persistent flooding and unmaintained canal planting. No source read publishes flow or water-quality measurements. The city ran a maintenance campaign in August.21222324
- November 2026
The World Architecture Festival named the park Landscape of the Year on 20 November 2026. What the jury valued could not be established: no jury statement for this prize was found. The entrant's text in the festival directory stresses the memory of the buried igarapé, microdrainage and water-quality measures, shade and public use.122526
Approvals and legal steps
- 2024 Related sewer works, not an approval of the park: State Decree 4.393 of 17 December 2024 declared a property at Vila da Barca of public utility for expropriation, for sewage collection in Una sub-basin 4.1.1. It assigned the administrative steps to Seop and the cost to the state treasury. The decree does not name the Doca; press reports make that link.2716
- 2024–2025 The project archaeologist said that Iphan recommended removal of the vessel and that a new ordinance then authorised the excavation; its number is not given.12
No environmental licence, impact study, planning consent or tender record for the park was found in the sources opened. Residents quoted in April 2025 said they had received no licensing documents for the pumping station.
Funding
- 2024 Itaipu Binacional and Seop signed an agreement on 6 May 2024 covering the park, sewers and road works; Gazeta do Povo, citing Itaipu, gives R$ 1,008,233,374.64 for the whole package. The amount for the Nova Doca was reported as R$ 310 million (7 May 2024).28298
- 2025 Published figures: R$ 365.9 million allocated (COP30 site, 4 August 2025); R$ 312.2 million invested by Itaipu (federal government, 2 October 2025); R$ 316 million (Itaipu's COP30 page, last modified November 2025), including about 19,000 metres of sewer, 2,300 house connections and a pumping station.302031
- 2025 The Una treatment plant was a separate project: R$ 125.2 million, of which R$ 49.5 million federal and R$ 75.7 million state (federal government, 2 October 2025). The governor gave R$ 140 million for the plant in August 2025 (Diário do Pará).2018
The published figures differ and no source reconciles them. At least the Itaipu figure includes sewers, house connections and a pumping station. None isolates the cost of the landscape works, so a cost per square metre of park cannot be derived. No audited final cost, design fee or maintenance budget was found.
People
- Government of Pará, State Secretariat of Public Works (Seop) Client and executing agency; Ruy Cabral, secretary; Naira Carvalho, architect for the park works
- Itaipu Binacional Funder, by agreement with the state; Enio Verri, Brazilian director-general
- Natureza Urbana Masterplan and basic project (the firm’s term; projeto básico); discipline landscape architecture; Manoela Machado and Pedro Lira, coordination; Giulia Corsi, project leader; Claudia Jaegerman, Julia Ximenes, Juliana Santos, Luan Neske, Nicollas Rangel and Yan Azevedo, team; ArchDaily also lists Camila Reis. The author of the executive design and the professional of record were not found
- Geasa Engenharia Vegetation and drainage design
- Marcello Sanguinetti Estruturas Structural design
- Vallenge Engenharia Complementary projects
- Iphan, Pará office Federal heritage oversight of the archaeological find
- Kelton Mendes Archaeologist engaged by the company the press describes as responsible for the Nova Doca
- Belém City Hall, Sezel Coordinated the August 2026 maintenance campaign
- Residents of Vila da Barca Contested the spoil disposal and the pumping station
Sources for this page
- World Architecture Festival, The 2026 winners
- World Buildings Directory (World Architecture Festival), Doca Linear Park (WAF 2026 entry)
- Natureza Urbana, Doca Linear Park | COP 30 Brazil
- Agência Pará (Government of Pará), Helder and Lula deliver the Linear Park of Nova Doca, 2 October 2025
- Universidade de Brasília, Igarapé das Almas: uma cartografia da Avenida Visconde de Sousa Franco, Belém-PA, by Larissa de La-Rocque Corrêa Teles (master’s dissertation, 2019)
- Universidade Federal do Pará, Dialética da ocupação de áreas de várzea em Belém e propostas de drenagem compreensiva, by N. T. de S. Braga and M. dos S. Gouveia, Novos Cadernos NAEA 23(1), 2020
- Diário do Pará, Nova Doca e Tamandaré: obras em parques lineares vão começar em breve, 21 March 2024
- Diário do Pará, Governador autoriza início das obras da Nova Doca, 7 May 2024
- Diário do Pará, Nova Doca terá passarela, academia, jardins de chuva, espaço pet e mais, 7 May 2024
- Agência Pará (Government of Pará), Governor Helder Barbalho and Vice Governor Hana Ghassan inspect the works of the Nova Doca, 13 August 2025
- Diário do Pará (carrying the Iphan statement), Iphan identifica achado arqueológico nas obras da Nova Doca, 13 August 2024
- Diário do Pará, Barco na Nova Doca: último segmento de embarcação é resgatado, 28 January 2025
- Agência Pará (Government of Pará), Government of Pará removes dividers for the public to see the first section of the Nova Doca Linear Park, 31 March 2025
- Brasil de Fato, Paisagismo em Belém para COP30 gera críticas e reforça debate sobre racismo ambiental, 4 April 2025
- Diário do Pará, Comporta da Nova Doca resiste a marés de 3,6m e evita inundações em Belém, 1 April 2025
- Alma Preta, Favela de palafitas recebe esgoto e entulhos de bairro nobre em obra da COP 30, 19 March 2025
- Brasil de Fato, Obra da COP30 vai levar esgoto de área nobre em Belém para comunidade de palafitas, 28 April 2025
- Diário do Pará, Helder acompanha avanço das obras de saneamento na Vila da Barca, 19 August 2025
- Agência Pará (Government of Pará), In a ceremony with Lula, Governor Helder Barbalho delivers the Nova Doca, 2 October 2025
- Agência Gov (Government of Brazil), Lula inicia agenda de visitas a obras para a COP 30 e inaugura Parque Linear da Doca, em Belém, 2 October 2025
- Diário do Pará, Maré alta e chuva deixam Doca de Souza Franco alagada em Belém, 3 March 2026
- Jornal de Brasília, Obras da COP30 em Belém têm alagamento e parte de passarela removida, 26 April 2026 (Folhapress)
- Even3 (conference proceedings), Entre o direito à paisagem e o direito da paisagem: reflexões acerca dos parques lineares em Belém-PA, by Cristina Cátia Araújo Rêgo (conference abstract, undated)
- Correio da Manhã, Força-tarefa limpa Parque da Doca em Belém, 25 August 2026
- e-architect, World Architecture Festival 2026 winners news, 21 November 2026
- The Star (Malaysia), World Architecture Festival 2026: How winners elevate the built environment, 25 November 2026
- Assembleia Legislativa do Estado do Pará, Banco de Leis, Decreto nº 4.393, de 17 de dezembro de 2024 (published in DOE 36.071, 18 December 2024)
- Agência Gov (Government of Brazil), COP 30: Itaipu assina convênios de infraestrutura de R$ 1,3 bilhão para Belém, 6 May 2024
- Gazeta do Povo, Itaipu gasta mais do que o anunciado por governo Lula com COP-30 e freia redução da energia, 25 March 2025
- COP30 Brazil (Government of Brazil), Belém under construction: the final 100 days before COP30, 4 August 2025
- Itaipu Binacional, COP30: Ações da Itaipu em Belém
- ArchDaily, Doca Linear Park / Natureza Urbana, 2 December 2025
- Agência Pará (Government of Pará), Government of Pará presents advances and accelerates investments 100 days before COP 30, 2 August 2025
- COP30 Brazil (Government of Brazil), With most projects over 90% complete, Belém prepares to welcome the world, 5 September 2025
Researched on 2026-11-24 from the sources listed; a fact that could not be confirmed in a source was left out. Pictures are public domain or under an open licence, credited as their file page asks.
The question it brings · interpretation
If a park shares its site with a drainage canal, tide gates and sewers that serve a wider basin, how far beyond its edge would you measure whether it worked, and what would you measure?
Each question is Field Method’s interpretation, not a claim made by the source.
The date
2026 is the award year: the World Architecture Festival announced its overall winners on 20 November 2026 (festival winners page). Design: the start date is not stated; the state presented the project to agencies on 21 March 2024 (Diário do Pará), and the firm's project sheet gives the date 2025 without saying which stage it marks, and gives its scope as masterplan and basic project. Construction: the order to start works was signed on 7 May 2024 (Diário do Pará); the first block opened to view on 31 March 2025 (Agência Pará). Opening: 2 October 2025 (Agência Pará; the festival directory gives the same completion date). ArchDaily prints 2022 as the completion year, which conflicts.
Checked against
- World Architecture Festival, The 2026 winners
- World Buildings Directory (World Architecture Festival), Doca Linear Park (WAF 2026 entry)
- Natureza Urbana, Doca Linear Park | COP 30 Brazil
- Agência Pará (Government of Pará), Helder and Lula deliver the Linear Park of Nova Doca, 2 October 2025
- Agência Gov (Government of Brazil), Lula inicia agenda de visitas a obras para a COP 30 e inaugura Parque Linear da Doca, em Belém, 2 October 2025
- Diário do Pará, Nova Doca terá passarela, academia, jardins de chuva, espaço pet e mais, 7 May 2024
- Agência Pará (Government of Pará), Government of Pará removes dividers for the public to see the first section of the Nova Doca Linear Park, 31 March 2025
- Universidade de Brasília, Igarapé das Almas: uma cartografia da Avenida Visconde de Sousa Franco, Belém-PA, by Larissa de La-Rocque Corrêa Teles (master’s dissertation, 2019)
- Jornal de Brasília, Obras da COP30 em Belém têm alagamento e parte de passarela removida, 26 April 2026 (Folhapress)
- Diário do Pará, Governador autoriza início das obras da Nova Doca, 7 May 2024
- Diário do Pará, Nova Doca e Tamandaré: obras em parques lineares vão começar em breve, 21 March 2024
- ArchDaily, Doca Linear Park / Natureza Urbana, 2 December 2025
- Diário do Pará, Comporta da Nova Doca resiste a marés de 3,6m e evita inundações em Belém, 1 April 2025