01 / Scope brief
01-scope.mdThe blank template asksWho needs to decide what, at which stage? One question this review can answer. What the evidence cannot resolve.
Q01 — Site / question
Status issued for internal review | Revision: r03b | Prepared by: Field Method (AI-assisted preparation) | Date: 2026-10-03
Decision to support
Decision D01 Before any design work advances at Old Trolley Barn Neighborhood Park, decide which existing conditions need field verification and professional review first. Early, pre-design stage.
Question Q01 Which existing conditions shape preliminary pedestrian/program consideration, and what needs verification before design advances?
Intended recipient Field Method founder, as professional reviewer, deciding whether and how to carry out field checks FV01–FV06.
Extent and applicability
Site/reference Old Trolley Barn Neighborhood Park, 1900 Adams Avenue, San Diego. City Developed Parks layer 3, OBJECTID 279 (E09).
Study extent complete E09 administrative polygon, transformed to EPSG:6340 (NAD83(2011) / UTM 11N, metres); 14,503.7 m². Context buffer 0 m. A 1 m computational collar is used only for the slope stencil. The polygon is administrative, not a surveyed legal boundary.
Included mapped terrain variation inside the polygon; documentary circulation questions; the field checks needed before a decision.
Excluded grading, drainage, hydrology, accessibility or route certification, survey, engineering, regulatory compliance, constructability, program suitability and usable acreage. The terrain data cannot resolve any of these.
Evidence and analysis
Required evidence IDs E09 (City park polygon), E10 (2024 USGS 0.5 m lidar DEM). E11 (1991 City General Development Plan) supplies historical field questions only.
Analysis A01 native-grid Horn 3 × 3 slope, percent rise/run, at selected cell centres; four descriptive communication bins. Required checks: source fitness, CRS/units, tile coverage, analytic-plane test, real-cell stencil check, NoData/edge behaviour, rerun. Accepted run r03b.
Missing inputs current circulation geometry (E07 bounding-box query returned no features; that is not evidence of absent paths); current imagery (no rights or coverage established); any survey; independent spatial alignment check.
Before the decision advances
Field checks FV01–FV06 (03-field-checks.csv). All pending.
Graphic G01 (mapped terrain evidence) and G02 (evidence → questions for verification). Internal; not included in this package.
Professional / specialist review founder review of the interpretation and its usefulness — pending. Survey, civil or accessibility specialists if a later design decision depends on grade or route.
Stop conditions stop if the source extent, units or CRS differ from this record; if FV01 shows the polygon does not match the park; or if any reader treats the slope classes as a suitability, grading or access finding.
02 / Evidence log
02-evidence.csvThe blank template asksFor each source: locator, source date versus access date, units and reference, what it says, what you infer, its limits and its permission status.
City of San Diego Developed Parks, layer 3 — Old Trolley Barn Neighborhood Park (OBJECTID 279)
- Source locator
- https://webmaps.sandiego.gov/arcgis/rest/services/SDPR/SDPR_Public/MapServer/3 — /query where=OBJECTID=279, outFields=*, returnGeometry=true, f=pjson; archived response SHA256 be790eb23cd212f398aec36a4eb0fc1d27b960d22a7cb4b8b8d7c84727245a1b (16,584 bytes)
- Source date
- Feature last edited 2025-08-26 (edit timestamp, not survey date); YEAR_ASSESSED 2014 is an attribute, not geometry vintage
- Units / reference
- Native EPSG:2230 (WKID 102646), US survey feet, no Z; transformed horizontally to EPSG:6340 metres for A01 (declared operation accuracy 0.2 m)
- Source statement
- One administrative park polygon, 64 coordinate entries; City attributes ACRES 3.587 and READ_AC 3.071 (different fields)
- Analyst interpretation
- Usable as a reproducible study outline for this park only
- Suitability / limitations
- Administrative inventory geometry; not a legal/title boundary or survey. Positional accuracy unknown. Does not show entrances, paths or current conditions. Acreage attributes are not usable program area
- Permission / attribution
- Public City service queried for internal research; City copyright notice retained. Redistribution of geometry not authorized — recover from the public API instead
- Verification status
- identity, geometry, CRS and fingerprint checked; physical alignment pending FV01
- Feeds
- A01 → G01; G02
USGS 3DEP lidar DEM, CA_SanDiegoCo_2_D24 (2024), tiles 11SMS486624 and 11SMS486625
- Source locator
- https://www.fisheries.noaa.gov/inport/item/80431 (project metadata); TIFFs via USGS TNM staged products; SHA256 557000aced0064725b5c75bd7742e3a52531ab972c03388edebce4cb37b49f94 (south) and 5151f03560d8ea9c6caa9c4017b878ff0880a3567c3f02d3b4bf076dd434b636 (north)
- Source date
- Acquisition Work Unit 2: 2024-11-09 to 2024-11-21 (project level, not per cell); catalog publication 2026-09-08
- Units / reference
- 0.5 m grid, Float32; NAD83(2011) / UTM 11N, EPSG:6340, metres; NAVD88 / Geoid18 heights, metres; NoData −999999
- Source statement
- Hydro-flattened bare-earth DEM from ground-classified lidar (project metadata)
- Analyst interpretation
- Suitable for internal, preliminary terrain-pattern questions and for directing field checks inside E09
- Suitability / limitations
- Resolution is not accuracy; project accuracy not validated at this park. Small steps, walls, vegetation filtering and change since 2024 may be missed. Not evidence for grading, drainage, route certification, survey or engineering
- Permission / attribution
- Project metadata declares CC0 / public domain, no access constraints; retain NOAA temporal-change and critical-use warning
- Verification status
- headers, units, coverage and tile seam checked locally; site accuracy not verified
- Feeds
- A01 → G01; G02
City of San Diego, Old Trolley Barn Neighborhood Park General Development Plan
- Source locator
- https://www.sandiego.gov/sites/default/files/prgdp-old-trolley-barn-neighborhood-park.pdf (linked by E09 GDP_URL)
- Source date
- Drawing revision 1991-12-23; board approval 1988-04-27 (per drawing data log)
- Units / reference
- Not georeferenced; no CRS; drawing states total site 8.66 ac and improved area 3.85 ac (different from E09)
- Source statement
- Historical annotations: internal paved circulation, Adams Avenue entry monument, connections toward Carmelina Drive and Panorama Drive, eastern ramp, turf/tot lot, canyon overlook
- Analyst interpretation
- Locations and topics to check in the field (I03); historical context only
- Suitability / limitations
- Historical planning drawing, not as-built or current conditions. Does not establish current paths, entrances, alignment or accessibility
- Permission / attribution
- Public City document; consulted and cited only. Not reproduced or redistributed; redistribution rights not inferred
- Verification status
- documentary review only
- Feeds
- none (questions for FV02–FV06) → G01; G02 (unverified-context labels only)
City of San Diego Official Park Trails, layer 1
- Source locator
- https://webmaps.sandiego.gov/arcgis/rest/services/SDPR/SDPR_Public/MapServer/1 — archived bounding-box query response
- Source date
- Feature dates not inspected
- Units / reference
- EPSG:2230 (WKID 102646), US survey feet
- Source statement
- Archived bounding-box query returned features: [] (empty)
- Analyst interpretation
- An empty response for one query; not evidence that paths are absent
- Suitability / limitations
- Not a complete pedestrian inventory; exact query parameters not embedded in the archived response
- Permission / attribution
- Public City service; no features retrieved
- Verification status
- query provenance incomplete; current paths require FV02
- Feeds
- none → none
03 / Field-check sheet
03-field-checks.csvThe blank template asksWhat to observe and why. Observer, date and actual observation, recorded separately from interpretation. Unperformed checks stay pending.
Confirm park identity and signage at the 1900 Adams Avenue approach; compare visible extent with the City polygon
- Tests
- Q01; E09
- Where
- 1900 Adams Avenue approach
- Remaining uncertainty
- Whether E09 matches the physical park; any extent discrepancy
- Responsible
- Founder
Observer · Observation date · Actual observation · Interpretation · Photo ID: blank until observed
From public paths, identify actual pedestrian entries and whether connections are continuous and open
- Tests
- Q01; E09; E07; E11; I02; I03
- Where
- Public paths and E11 historical connection locations
- Remaining uncertainty
- Current entries and continuity; do not certify accessibility
- Responsible
- Founder
Observer · Observation date · Actual observation · Interpretation · Photo ID: blank until observed
Identify actual gathering/activity areas and potential conflicts along existing connections
- Tests
- Q01; E11; I03
- Where
- Existing connections and activity areas
- Remaining uncertainty
- One visit is not representative demand evidence
- Responsible
- Founder
Observer · Observation date · Actual observation · Interpretation · Photo ID: blank until observed
Observe visible terrain breaks, steps, walls or abrupt grade changes, especially where G01 shows ≥30% cells to the north and east
- Tests
- Q01; E10; A01; I01; I02
- Where
- Safe public viewpoints near the northern and eastern ≥30% concentration
- Remaining uncertainty
- DEM slope may smooth small features; no survey-grade elevations implied
- Responsible
- Founder
Observer · Observation date · Actual observation · Interpretation · Photo ID: blank until observed
Check whether edges, vegetation or obstructions conceal terrain or circulation evidence; mark visible / obscured / not observable
- Tests
- Q01; E09; E10; I01
- Where
- Park edges
- Remaining uncertainty
- Absence of data must not become absence of condition
- Responsible
- Founder
Observer · Observation date · Actual observation · Interpretation · Photo ID: blank until observed
Compare G01/G02 annotations with current conditions; record confirms / challenges / unresolved with reviewer rationale
- Tests
- Q01; G01; G02; I01–I03
- Where
- Whole park
- Remaining uncertainty
- Tests evidence → interpretation continuity, not appearance
- Responsible
- Founder
Observer · Observation date · Actual observation · Interpretation · Photo ID: blank until observed
04 / Graphic brief
04-graphic-brief.mdThe blank template asksOne finding, its evidence chain, legend and caption, and the uncertainty that changes its meaning.
G01 — Graphic brief
Status produced; internal review only | Revision: r03b | Related question: Q01
One finding to communicate
Mapped slope is mostly gentle, but a continuous concentration of ≥30% cells lies toward the northern and eastern parts of the polygon. That contrast is a question to verify in the field, not a design verdict.
Audience / intended decision D01 founder, deciding which field checks to make before design advances.
Evidence chain
Source IDs and dates E09 (City park polygon; feature edited 2025-08-26); E10 (USGS lidar DEM; acquired 2024-11-09 to 2024-11-21).
Analysis ID / revision A01 / r03b.
Field evidence or pending checks FV01, FV04, FV05 and FV06, all pending.
Interpretation I01 terrain contrast merits closer review; investigate the physical features that create it. Limits: outline accuracy, interpolated terrain, walls and post-2024 change are unresolved. Class membership is not a design verdict.
Composition
- Lead finding: "Trolley Barn Park · mapped terrain evidence" (G01); "Terrain evidence → questions for verification" (G02).
- Extent/reference/units: complete E09 polygon, context buffer 0 m; NAD83(2011) / UTM 11N metres; NAVD88 / Geoid18 heights in metres.
- Legend and classification: A01 derived slope, percent rise/run: 0–<5%, 5–<15%, 15–<30%, ≥30%. Descriptive communication bins only, with no access, grading or program-suitability meaning.
- Scale / north basis where meaningful: 50 m scale bar; grid north (UTM), stated as grid north.
- Distinct labels for source data, interpretation and unverified context: "Source / mapped", "Field Method analysis", "Unverified context". G02 adds "Observation", "Interpretation" and "Unverified".
- Caption: "Communication classes describe terrain variation; they are not access, grading or program suitability standards." Plus extent, references, FV01–FV06 pending and source/record locators.
- Accessible text equivalent: "Four mapped slope classes within the administrative park polygon. Most of the park is under 15%; cells of 30% or more concentrate along the northern and eastern edges. Current entries and paths are not mapped."
QA before use
Values checked against A01 median 5.4%, 95th percentile 53.5%, class shares 45.51 / 36.68 / 4.97 / 12.85% of 57,999 cells. An initial layout overlap failure was found and repaired before acceptance. r03a figures are superseded. Not tested: independent reader comprehension.
Source reuse E10 is public domain. City redistribution terms for the E09 outline are unresolved, so G01/G02 stay internal and are not part of this package.
Output filename / format / revision figures/r03b/graphic-01 and graphic-02 (SVG editable source; PNG checked viewing export).
Reviewer / review date / corrections Field Method layout QA, 2026-10-03. Founder professional review pending.
05 / QA checklist
05-qa.mdThe blank template asksWhich checks were actually done, what remains unresolved and whether the decision may advance.
QA01 — Review before handoff
Reviewer Field Method (AI-assisted computational, document and graphic checks) | Date: 2026-10-03 | Package revision: r03b
Status partial. Computational and document checks done; field, professional and recipient review not done.
- Checked: Q01 names a bounded decision and its exclusions. (01-scope.md)
- Checked: Every evidence/graphic/interpretation ID resolves to a record or artifact. (E07, E09–E11 → A01 → I01–I03 → G01/G02 → FV01–FV06)
- Checked: Source locator, acquisition date, access date and revision are distinguished. (E10 acquisition 2024 vs catalog publication 2026; E09 edit timestamp is not a survey date)
- Checked: Units, coordinate/vertical references, extent and coverage are explicit where relevant. (EPSG:6340 m; NAVD88/Geoid18 m; tile intersections sum to the full polygon; no NoData at selected cells)
- Checked: Source quality and analysis checks support this limited use; resolution is not asserted as accuracy. (analytic plane max error 0.000011 percentage points; 8 real-cell checks max 0.00097 percentage points; tolerance 0.001; two runs identical)
- Checked: Observations, interpretation and decisions are visibly separate.
- Not checked: Actual field checks include observer/date/location; incomplete checks remain pending. (Cannot be checked yet: no field check has been performed. FV01–FV06 remain pending.)
- Checked: Graphic values, legends, captions and text equivalents agree with the evidence. (checked locally against A01)
- Checked: Permissions/attribution match the intended recipient and use. (Yes for the internal recipient. City redistribution terms are unresolved, so E09 geometry and the figures are withheld from any external release.)
- Checked: Current filenames/revisions and recipient instructions agree; superseded work is identifiable. (r03b accepted; r03a superseded and preserved)
- Checked: Professional/specialist review scope and remaining actions are recorded. (Recorded in 01-scope.md and 06-handoff.md. The founder review itself has not been performed.)
- Checked: Recipient comprehension was tested, or is explicitly untested. (Explicitly untested: no independent recipient has received the package.)
Unresolved items and effect on use no field observations; no independent spatial alignment against imagery or survey; no independent rerun; City redistribution terms unresolved. Effect: the package can direct field checks. It cannot support placing a zone, choosing a route or any design conclusion.
Corrections / responsible person / next action founder completes FV01–FV06 and reviews I01–I03; a separate recipient tests the handoff without coaching.
Decision D01 may advance? Hold. Only the field checks may proceed. Authority: founder.
Checking boxes records review activity. It does not establish engineering, regulatory or professional approval.
06 / Handoff note
06-handoff.mdThe blank template asksWhat the package supports, what it does not, the files, the open actions and how the recipient should read it.
H01 — Coordinated handoff
Package title / ID Trolley Barn Park preliminary terrain review / TROLLEY-BARN
Revision / date r03b, 2026-10-03
Prepared by / reviewed by / recipient Field Method (AI-assisted preparation) / computational and document QA only (QA01) / Field Method founder, professional reviewer
Status issued for internal review. Founder review pending.
Question and current decision state
Q01 Which existing conditions shape preliminary pedestrian/program consideration, and what needs verification before design advances?
D01 Hold. Proceed only with field checks FV01–FV06. No zone, route or design recommendation is made. Authority: founder.
What the package supports
Use it to direct field verification inside the E09 polygon. 82.19% of selected cells are below 15% mapped slope (median 5.4%), and the ≥30% class (12.85%) is concentrated toward the north and east (I01, I02). The whole-site median hides that concentration.
What it does not establish grading, drainage, hydrology, survey, accessibility or route certification, regulatory compliance, constructability, program suitability or usable acreage. Surveyor, civil and accessibility specialists are needed if a later decision depends on grade or route.
Files and links
| ID | Artifact / revision | Purpose | Source / verification state |
|---|---|---|---|
| Q01 | 01-scope.md / r03b | Scope | issued for internal review |
| E07, E09–E11 | 02-evidence.csv | Evidence | E09/E10 checked locally; E11 documentary only; E07 provenance incomplete |
| A01 | internal validation record (terrain analysis and analysis record; not included) / r03b | Analysis | computational checks passed; independent rerun not tested |
| FV01–FV06 | 03-field-checks.csv | Verification | pending |
| G01, G02 | 04-graphic-brief.md; figures/r03b (internal) | Communication | layout QA passed; withheld from external release |
| QA01 | 05-qa.md | Review | partial |
Open actions
FV01 → E09 extent → founder → dated observation at the Adams Avenue approach → pending
FV02–FV03 → I02/I03, E07, E11 → founder → entries, continuity, activity and conflicts → pending
FV04–FV05 → I01, E10 → founder → visible grade breaks, steps, walls and concealed edges → pending
FV06 → G01/G02 → founder → confirms / challenges / unresolved, with rationale → pending
R01 → whole package → independent recipient → rerun A01 and read the package without coaching → not started
Do not close a pending action without its supporting record.
Recipient instructions
Read 01-scope.md, then 02-evidence.csv, 04-graphic-brief.md, 03-field-checks.csv and 05-qa.md. CSV opens in any spreadsheet; no GIS software is needed to read the package.
To reproduce A01, recover E09 from the City API (OBJECTID 279) and E10 from the two USGS tile URLs, match the SHA256 values in 02-evidence.csv, and recompute A01 as specified in 01-scope.md with a new run ID (the exact command is in the internal validation record, which is not included). If a source has changed and no longer matches, record a new source revision. Do not treat it as the same run.
Recipient check
Can the recipient find the evidence, understand the uncertainty and identify the next action without coaching?
Actual recipient / date / feedback not tested.
Corrections / superseded revision r03a superseded by r03b; DEM, slope and class arrays identical between the two runs.